ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Nero

Registered No litigation declared Residential / Group Housing project

Nero

By Super Construction Company

RG-MH-21319 · RERA P51800004508 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA
  • Completion date moved by 66 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 66 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
32 of 97Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

Nero is a Residential / Group Housing project by Super Construction Company in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004508 on 9 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 66 months from the original filing. 65 of the 97 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameNero
  • TypeResidential / Group Housing
  • Location
    • Opposite Hotel Highway View
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004508
  • ReraGenie IDRG-MH-21319

Builder

  • NameSuper Construction Company
  • Entity typePartnership
  • PartnersLalsaheb R Singh, Ramesh H Singh

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed96 files

Current status

67%65 of 97 units booked
80.4%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NeroNA201794397

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Nero: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed130

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots130
Closed/Covered130

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,376 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2025
LandownerVillageDistrict
Sangam Ananya Developers Pvt LtdAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI10855.97
Proposed, not sanctioned5,749 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai large corporate branch, Andheri East, Mumbai 400093
Estimated costRs 41.76 cr
Cost incurredRs 33.58 cr
Work done80.42%
BuildingWingEstimatedIncurred
NeroNARs 39.51 crRs 33.58 cr
-NARs 2.25 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhaneshwar Pakhare & Associates
EngineerIntegrated Building Services
Engineermohd qureshi
Chartered Accountantsp singh
Chartered Accountantshambu gupta&co
PartnerRole in project
Super Construction Company-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013374Jun 2021 → Mar 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL

EXT51800010796Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51800019419Jun 2021 → Dec 2025

Reason as filed by the promoterDue to shortage of matiral and lebour not able to complete project please grant us extension till 31/12/2025

EA26092517949Jun 2021 → Dec 2026

Reason as filed by the promoter1) The commencement certificate of B wing (rehab plus sale building) as per the last approved plan from ground plus 10 upper floors is delayed. 2) The construction is also suffered due to demolition of 3 hutments which are cleared now. We are requesting that time be extended on account of the aforesaid.

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000161272Ketan Kothari TrustM/s. Super Construction Company29/10/2019
CC006000000192923Ketan Kothari TrustSuper Construction Company12/03/2020
CC006000000192299M/s Malpani Developers and Construction Co Pvt LtdM/s. Super Construction Company25/01/2020
CC006000000375345Sanjay Shivanadan TapaseSuper Construction Company15/05/2023
CC12502723DHAVAN KALPNATH GIRISuper Construction Company04/08/2025
SM12600272Bhakti AchrekarSuper Construction Company22/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: architect certificate signed.pdf15 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q 2 2026-27 NERO.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 Ca Certificate.pdf15 Jul 2026
Commencement certificateFile: BANDRA CC 03 02 2026 11zon.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 NERO Q4.pdf30 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate (5).pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 2025-26.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q3 2025 26 NERO.pdf6 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate (5).pdf6 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf6 Apr 2026
Withdrawal Update Form 1File: form 1.pdf31 Mar 2026
Withdrawal Update Form 2File: form2 finall.pdf31 Mar 2026
Withdrawal Update Form 3File: form 3.pdf31 Mar 2026
Form 5 (FY 2024-2025)File: form 5 24-25.pdf24 Oct 2025
Form 2A (FY 2024-2025)File: nero form 2 a.pdf20 Oct 2025
Form 1File: form 1.pdf26 Sep 2025
Form 2File: form 2 june 25.pdf26 Sep 2025
Form 3File: FORM 3 Q1 RERA NERO.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: inventory disclosure as june 25 nero (1).pdf26 Sep 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 24.pdf12 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 06 24.pdf12 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 09 24.pdf12 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 12 24.pdf12 Mar 2025
Declaration in FORM BFile: AFFIDAVIT.pdf15 Apr 2024
Certificates of CA (Form 3)File: FORM 3 12 22.pdf15 Apr 2024
Certificates of CA (Form 3)File: FORM 3 03 23.pdf15 Apr 2024
Certificates of CA (Form 3)File: FORM 3 06 23.pdf15 Apr 2024
Certificates of CA (Form 3)File: FORM 3 09 23.pdf15 Apr 2024
Certificates of CA (Form 3)File: FORM 3 12 23.pdf15 Apr 2024
Declaration in FORM BFile: FORM B_organized_compressed.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf22 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf22 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 22 Q4.pdf20 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 23 Q1.pdf20 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 23 Q2.pdf20 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 23 Q3.pdf20 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 23 Q4.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer Certificate on Quality Assurance 2223.pdf20 Mar 2024
CERSAI detailsFile: cersai declaration.pdf20 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf28 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER FORM 2A (20-21).pdf24 Aug 2021
Declaration about Commencement CertificateFile: CC DECLARATION.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf19 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: doc20210818183642.pdf18 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20 21.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOSURE.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA Cert Form 5 Nero.pdf4 Nov 2019
Copy of the legal title reportFile: Bandra Title Cert.pdf27 Jul 2017
Details of encumbrancesFile: NERO Encumb Cert.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: nero CC.pdf27 Jul 2017
Declaration in FORM BFile: Nero Affidavit 1-ilovepdf-compressed.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NERO Redevlopment Eng Cert-ilovepdf-compressed.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NERO Rehab Eng Cert-ilovepdf-compressed.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NERO Sale Eng Cert-ilovepdf-compressed.pdf27 Jul 2017
Certificates of CA (Form 3)File: sangam ananya RERA CERTIFICATE-ilovepdf-compressed.pdf27 Jul 2017
Proforma of Allotment letterFile: Agreement -Saptrishi final NERO.pdf27 Jul 2017
OtherFile: Re_Dev_Agree--comp.pdf27 Jul 2017
Building plan approvalFile: i o d letter.pdf26 Jul 2017
Layout approvalFile: 2-16.pdf26 Jul 2017
Layout approvalFile: 1-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 7-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 3-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 4-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 5-16.pdf26 Jul 2017
Layout approvalFile: 6-16.pdf26 Jul 2017
Layout approvalFile: 8-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 11-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 9-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 16-16-ilovepdf-compressed.pdf26 Jul 2017
Layout approvalFile: 15-16.pdf26 Jul 2017
Layout approvalFile: 10-16.pdf26 Jul 2017
Layout approvalFile: 12-16.pdf26 Jul 2017
Layout approvalFile: 13-16.pdf26 Jul 2017
Layout approvalFile: 14-16.pdf26 Jul 2017
Layout approvalFile: 13-16.pdf26 Jul 2017
PAN CardFile: HB Group.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: 1-16-ilovepdf-compressed.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: 2-16.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: 3-16-ilovepdf-compressed.pdf26 Jul 2017

How this compares with Mumbai Suburban

67%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nero on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmNeroCompleted 126Lapsed / revoked 72Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 346 registered projects within 2 km.

Builder: Super Construction Company

Super Construction Company has 1 registration on MahaRERA, including Nero. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Nero is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nero?

The registered promoter entity is Super Construction Company, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nero?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nero?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nero?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nero?

The professionals named in the filing: Architect: Dhaneshwar Pakhare & Associates; Engineer: Integrated Building Services; Engineer: mohd qureshi; Chartered Accountant: sp singh; Chartered Accountant: shambu gupta&co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nero?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nero. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nero to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.