NEO CITY I - PHASE II

By HASHMI DISHA CONSTRUCTION

RG-MH-00963 · RERA P51500012329 · Last updated on MahaRERA portal: 11 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

NEO CITY I - PHASE II is a Residential / Group Housing project by HASHMI DISHA CONSTRUCTION in Aurangabad, Maharashtra, registered with MahaRERA as P51500012329 on 1 Sep 2017. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameNEO CITY I - PHASE II
  • TypeResidential / Group Housing
  • Location
    • Nashik Road
    • Mitmita
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500012329
  • ReraGenie IDRG-MH-00963

Builder

  • NameHASHMI DISHA CONSTRUCTION
  • Entity typePartnership
  • PartnersDEVANAND NARAYANRAO KOTGIRE, ABUL HASAN ALI KHURRAM ALI HASHMI, MUMTAZ KHURRAM ALI HASHMI

Key dates

this monthRegisteredSep 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA40000
BUILDING BNA30000
BUILDING CNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Open Space55
BuildingOpen SpaceTotal
BUILDING A88
BUILDING B1010
BUILDING C3737

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,311 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12300.0
Proposed, not sanctioned3,032 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKranti Chowk, Aurangabad

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKW ASSOCIATES
EngineerCORE CONSULTANTS
PartnerRole in project
HASHMI DISHA CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jan 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: hashmi disha occupancy.pdf11 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 31-01-2021.pdf11 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 30-04-2021.pdf11 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 30-06-2021.pdf11 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 31-10-2021.pdf11 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 31-01-2022.pdf11 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 31-06-2019.pdf17 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 31-09-2019.pdf17 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO II - Arch Cert 31-12-2019.pdf17 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO PHASE IV - ARCH CERT - 13-04-2020.pdf17 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO PHASE IV - ARCH CERT - 16-07-2020.pdf17 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO PHASE IV - ARCH CERT - 09-10-2020.pdf17 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO PHASE II - ENGG CERT -30-06-2019.pdf17 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO PHASE II - ENGG CERT -30-09-2019.pdf17 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO PHASE II - ENGG CERT -13-01-2020.pdf17 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO PHASE II - ENGG CERT -20-04-2020.pdf17 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO PHASE II - ENGG CERT -20-07-2020.pdf17 Jul 2021
Certificates of CA (Form 3)File: Q1 19-20 (1).pdf10 Dec 2020
Certificates of CA (Form 3)File: Sep 19-20.pdf10 Dec 2020
Certificates of CA (Form 3)File: Q3 19-20.pdf10 Dec 2020
Certificates of CA (Form 3)File: March 19-20.pdf10 Dec 2020
Certificates of CA (Form 3)File: Q1 20-21.pdf10 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf10 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf10 Dec 2020
Layout approvalFile: MYSCAN_20200825_0001.PDF17 Sep 2020
Building plan approvalFile: MYSCAN_20200825_0001.PDF17 Sep 2020
Building plan approvalFile: MYSCAN_20200825_0002.PDF17 Sep 2020
Building plan approvalFile: MYSCAN_20200825_0003.PDF17 Sep 2020
Building plan approvalFile: MYSCAN_20200825_0005.PDF17 Sep 2020
Copy of Layout Approval (in case of layout)File: MYSCAN_20200825_0001.PDF17 Sep 2020
Building Plan Approval (IOD)File: MYSCAN_20200825_0001.PDF17 Sep 2020
Building Plan Approval (IOD)File: MYSCAN_20200825_0002.PDF17 Sep 2020
Building Plan Approval (IOD)File: MYSCAN_20200825_0003.PDF17 Sep 2020
Building Plan Approval (IOD)File: MYSCAN_20200825_0005.PDF17 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: DOC.pdf17 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO - Arch Cert 30-4-2019.PDF27 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO - Engg Cert 30-4-2019.PDF27 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HDC-Architect Cert Dec18 P2.pdf29 Mar 2019
Certificates of CA (Form 3)File: NEO Phase II - CA Cert 31-10- 18.PDF29 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO - Eng Cert 30-01-2019.PDF2 Mar 2019
Certificates of CA (Form 3)File: NEO Phase II - CA Cert 31-07- 18.PDF25 Dec 2018
Certificates of CA (Form 3)File: NEO Phase II - CA Cert 31-10- 18.PDF25 Dec 2018
Certificates of CA (Form 5)File: NEO Phase II - FORM 5.PDF25 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO Phase II - Arch Certificate.PDF20 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO - Arch Certificate 30-10-18.PDF20 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO Phase II - Engg Certificate.PDF20 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO Phase II - Engineer Certificate 24-10-2018.PDF20 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO Phase I - Eng Cer-.PDF4 Jun 2018
Certificates of CA (Form 3)File: Neocity Ca Certificate.pdf4 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO Phase II - ARC Cer- 30-4.PDF28 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO PHASE II - Architect Certificate.pdf16 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO - PHASE II engineering Certificates.pdf16 Feb 2018
Certificates of CA (Form 3)File: NEO CITY CA CERTIFICATE- SCAN COPY - JAN.pdf16 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO_-_Arch_Certificate_31_10_2017.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEO_-_Eng_Certificate_31_10_2017.pdf31 Oct 2017
Certificates of CA (Form 3)File: CA-Certificate -Neo City Part2.pdf31 Oct 2017
Building plan approvalFile: BUILDING A.pdf30 Jul 2017
Building plan approvalFile: BUILDING B.pdf30 Jul 2017
Building plan approvalFile: BUILDING C.pdf30 Jul 2017
Building Plan Approval (IOD)File: BUILDING A.pdf30 Jul 2017
Building Plan Approval (IOD)File: BUILDING B.pdf30 Jul 2017
Building Plan Approval (IOD)File: BUILDING C.pdf30 Jul 2017
Declaration in FORM BFile: Form B With Notery.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEO_Architect_Certificate_Phase_II.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Neo -Engineer Certificate Phase 2.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA-Certificate -Neo City Part2.pdf30 Jul 2017
Layout approvalFile: Neo - Layout.pdf25 Jul 2017
PAN CardFile: PAN CARD - HASHMI DISHA.pdf25 Jul 2017
Copy of the legal title reportFile: NEO - Search Report.pdf25 Jul 2017
Details of encumbrancesFile: Index 2 Loan.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Neo - Layout.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NEO - Commencement Certifiacte.pdf25 Jul 2017
Proforma of Allotment letterFile: NEO - Allotment letter.pdf25 Jul 2017
Proforma of Allotment letterFile: NEO - Agreement to Sale Draft.pdf25 Jul 2017

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep NEO CITY I - PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mitmita1,400+ in Aurangabad

Builder: HASHMI DISHA CONSTRUCTION

HASHMI DISHA CONSTRUCTION has 1 registration on MahaRERA, including NEO CITY I - PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if NEO CITY I - PHASE II is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEO CITY I - PHASE II?

The registered promoter entity is HASHMI DISHA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEO CITY I - PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEO CITY I - PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEO CITY I - PHASE II?

The professionals named in the filing: Architect: AKW ASSOCIATES; Engineer: CORE CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEO CITY I - PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEO CITY I - PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEO CITY I - PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.