Home / Browse projects / Palghar, Maharashtra / NEELYOG AAWAS
NEELYOG AAWAS
RG-MH-63639 · RERA P99000046942 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEELYOG AAWAS is a Residential / Group Housing project by NEELYOG ENTERPRISE in Palghar, Maharashtra, registered with MahaRERA as P99000046942 on 26 Sep 2022. Possession was promised by 28 Oct 2025 and is now 12 months past that date. 42 of the 42 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameNEELYOG AAWAS
- TypeResidential / Group Housing
- Location
- ACHOLE ROAD NALLASOPARA EAST
- NALLASOPARA EAST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401209
- Pincode401209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000046942
- ReraGenie IDRG-MH-63639
Builder
- NameNEELYOG ENTERPRISE
- Entity typeOthers
- DirectorsYOGESH BABULAL MEHTA, RUSHI YOGESH MEHTA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Sep 2022
- Promised completion28 Oct 2025
- Revised completionRevised to 28 Oct 2025 (originally 31 Oct 2025)
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEELYOG AAWAS | NA | 9 | 7 | 42 | 0 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
NEELYOG AAWAS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shree Gordhandas Kapol Nagar Bldg 1 & 2 CHS Ltd | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NEELYOG AAWAS | NA | Rs 9.52 cr | Rs 8.91 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanat Mehta & Associates |
| Architect | SANAT MEHTA |
| Engineer | KOOLIPURACKAL OUSEPH DEVASIA |
| Chartered Accountant | SONAL V DESAI |
| Chartered Accountant | SONAL DESAI |
| Chartered Accountant | TEJAS PRAFULKUMAR GANDHI |
| Partner | Role in project |
|---|---|
| NEELYOG ENTERPRISE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate Jun25 signed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Jun25 signed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Jun25 signed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Jun25 signed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Jun25 signed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Jun25 signed.pdf | 28 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 CA Certificate FY 2024-25 Neelyog Enterprise signed.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Jun25 signed.pdf | 4 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Jun25 signed.pdf | 4 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Jun25 signed.pdf | 4 Sep 2025 |
| Form 1File: Form 1 Architect Certificate Mar 25 signed.pdf | 11 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate Mar 25 signed.pdf | 11 Aug 2025 |
| Form 3File: Form 3 CA Certificate Mar 25 signed.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Mar 25.pdf | 11 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 24 Aawas.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 24 Aawas.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 24 Aawas.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Dec 24 Aawas.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sep 24.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Sep 24.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate Sep 24.pdf | 3 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Sept 24.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Jun 24 Aawas.pdf | 29 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Jun 24 Aawas.pdf | 29 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Jun 24 Aawas.pdf | 29 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Certificate Mar 24 Awas NY Enterprise.pdf | 26 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Aawas 31 3 24.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Aawas 31 3 24.pdf | 3 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Aawas 31 3 24.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Aawas 31 3 24.pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 2 May 2024 |
| CERSAI detailsFile: CERSAI Report_Neelyog Aawas.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 31 12 23.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Cert- Sep 23.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Cert Aawas 30 9 23.pdf | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Engineers Cert Aawas 30 9 23.pdf | 9 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Architect Certificate.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -CA Certificate March 23.pdf | 4 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate dt 28 06 2023.pdf | 29 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate dt 28 06 2023.pdf | 29 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate dt 28 06 2023.pdf | 29 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Architect Certificate.pdf | 29 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineers Certificate.pdf | 29 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf | 29 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate-30922-NY Aawas.pdf | 1 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineers Certificate -30922-NY Aawas.pdf | 1 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate -30922 NY Aawas.pdf | 1 Dec 2022 |
| Proforma of Allotment letterFile: FINAL-AGREEMENT FOR SALE-AS PER RERA 12 9 22.pdf | 14 Sep 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 14 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT-ALLOTMENT LETTER.pdf | 14 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-AGS.pdf | 14 Sep 2022 |
| Other - LegalFile: Clarification In Promoters Detail.pdf | 25 Aug 2022 |
| Building plan approvalFile: Nallasopara Plan 1 -Pg 1.pdf | 24 Aug 2022 |
| Building plan approvalFile: Nallasopara Plan 1 -Pg 2 (i).pdf | 24 Aug 2022 |
| Building plan approvalFile: Nallasopara Plan 1 -Pg 2 (ii).pdf | 24 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Nallasopara Plan 1 -Pg 1.pdf | 24 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Nallasopara Plan 1 -Pg 2 (i).pdf | 24 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Nallasopara Plan 1 -Pg 2 (ii).pdf | 24 Aug 2022 |
| Details of encumbrancesFile: Encumbrance.pdf | 5 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Legal and Litigation Encumbrance.pdf | 5 Aug 2022 |
| CERSAI detailsFile: Cersai Details.pdf | 5 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 5 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Ac opening ltr.pdf | 5 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Ponit 3 and 4 rera documents.pdf | 22 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Detail Letter.pdf | 22 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Nallasopara Permission letter.pdf | 12 Jul 2022 |
| Declaration in FORM BFile: Form B - Affidavit Cum Declaration.pdf | 1 Jul 2022 |
| Declaration in FORM BFile: Board Resolution.pdf | 27 Jun 2022 |
| Details of encumbrancesFile: Emcumbrance Details.pdf | 7 Jun 2022 |
| Declaration about Commencement CertificateFile: Form D -Declaration about CC.pdf | 7 Jun 2022 |
| CERSAI detailsFile: Cersai Details.pdf | 7 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -CA Certificate.pdf | 4 Jun 2022 |
| Layout approvalFile: Nallasopara Plan.pdf | 2 Jun 2022 |
| PAN CardFile: PAN Card copy.pdf | 2 Jun 2022 |
| Copy of the legal title reportFile: Legal Title Report in RERA Format A.pdf | 2 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Nallasopara Plan.pdf | 2 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEELYOG AAWAS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NALLASOPARA EAST3,200+ in Palghar
Filed coordinates, straight-line distance. 167 registered projects within 2 km.
MLDC YASHWANT ORCHID PHASE I
SAI RYDAM REALTORS PVT LTD
AV CRYSTAL PRESTIGE
RELIABLE HOUSING INDIA PRIVATE LIMITED
ARMAAN LOTUS
MANGAL ARJUN VARATHA
Redevelopement of Sagar Prakash Hsg Co-op Soc
TRIMURTI CONSTRUCTION
SANSKRUTI SAPPHIRE
SANSKRUTI BUILDER AND DEVELOPER
DEEP LANDMARK
ATHARVA ENTERPRISES
See every Palghar project, with the district possession charts
Builder: NEELYOG ENTERPRISE
NEELYOG ENTERPRISE has 1 registration on MahaRERA, including NEELYOG AAWAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that NEELYOG AAWAS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NEELYOG AAWAS is delayed beyond 28 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEELYOG AAWAS?
The registered promoter entity is NEELYOG ENTERPRISE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEELYOG AAWAS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEELYOG AAWAS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEELYOG AAWAS?
The professionals named in the filing: Architect: Sanat Mehta & Associates; Architect: SANAT MEHTA; Engineer: KOOLIPURACKAL OUSEPH DEVASIA; Chartered Accountant: SONAL V DESAI; Chartered Accountant: SONAL DESAI; Chartered Accountant: TEJAS PRAFULKUMAR GANDHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEELYOG AAWAS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback