Home / Browse projects / Nashik, Maharashtra / NEELKANTH HEIGHTS
NEELKANTH HEIGHTS
RG-MH-14216 · RERA P51600034435 · Last updated on MahaRERA portal: 7 Jan 2026
Source: official MahaRERA filing
Red flags
- Rs 1.00 crore secured on the land, in favour of Jalgoan Janata Sahakari Bank LTD
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEELKANTH HEIGHTS is a Residential / Group Housing project by YATIN ANNASAHIB WANI in Nashik, Maharashtra, registered with MahaRERA as P51600034435 on 5 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 7 of the 14 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameNEELKANTH HEIGHTS
- TypeResidential / Group Housing
- Location
- NASHIK - PUNE ROAD
- HIRE NAGAR
- Nashik (M Corp.)
- Nashik
- 422011
- Pincode422011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600034435
- ReraGenie IDRG-MH-14216
Builder
- NameYATIN ANNASAHIB WANI
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Apr 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 7 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEELKANTH HEIGHTS | NA | 8 | 7 | 14 | 0 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
NEELKANTH HEIGHTS: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 7 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vijay Sanap |
| Architect | Rajesh Wani |
| Engineer | Anil Kadbhane |
| Engineer | Sagar Shinde |
| Chartered Accountant | CA Paresh Sabadra |
| Partner | Role in project |
|---|---|
| YATIN ANNASAHIB WANI | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: FORM-2A_ March 25.pdf | 7 Jan 2026 |
| Form 5 (FY 2024-2025)File: RERA Audit Report-24-25 final.pdf | 3 Jan 2026 |
| Occupational CertificateFile: OC.pdf | 3 Dec 2025 |
| Form 1File: AR - sept 25_compressed.pdf | 4 Nov 2025 |
| Form 2File: ER - sept 25_compressed.pdf | 4 Nov 2025 |
| Form 3File: CA - sept 25 final.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - sept 25_compressed.pdf | 4 Nov 2025 |
| Form 1File: AR - June 25.pdf | 12 Sep 2025 |
| Form 2File: ER - June 25.pdf | 12 Sep 2025 |
| Form 3File: CA - June 25 final.pdf | 12 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 25.pdf | 12 Sep 2025 |
| Form 1File: AR - March 25_compressed.pdf | 27 Jun 2025 |
| Form 2File: ER - March 25_compressed.pdf | 27 Jun 2025 |
| Form 3File: CA - March 25 final_compressed.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_compressed.pdf | 27 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec 24_compressed.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cerificate-Dec 24.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec 24_compressed.pdf | 25 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 22 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final RA.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Sept 24_compressed.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Final.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Sept 24_compressed.pdf | 21 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: YATIN ANNASAHEB WANI.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: YATIN ANNASAHEB WANI.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure - converted (1).pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure - converted (1).pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-June-24.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-June-24.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-June-24.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-June-24.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 9 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 8 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 8 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificatet- Dec23.pdf | 14 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec23.pdf | 14 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Dec23-final.pdf | 14 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report-Final.pdf | 22 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Sept 23.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Sept23.pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Sep 23.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Merged AR.pdf | 21 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Merged copy.pdf | 21 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 21 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Dec 22.pdf | 12 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert March 23.pdf | 12 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert December 22.pdf | 12 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Cert March 23.pdf | 12 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Form 3_31 03 2023 sign.pdf | 12 Jun 2023 |
| Other - TechnicalFile: 2A 01 (2 files merged).pdf | 15 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold 01 (2 files merged).pdf | 14 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_signed.pdf | 17 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank .pdf | 17 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 6 Jan 2023 |
| Layout approvalFile: Plan New pdf.pdf | 30 Mar 2022 |
| Building plan approvalFile: Plan New pdf.pdf | 30 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Plan New pdf.pdf | 30 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan New pdf.pdf | 30 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencment NEW.pdf | 21 Mar 2022 |
| Details of encumbrancesFile: EC.pdf | 18 Mar 2022 |
| Declaration about Commencement CertificateFile: Form D.pdf | 18 Mar 2022 |
| Declaration in FORM BFile: Form B.pdf | 18 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 18 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yatin Wani_CA Cert_signed_compressed.pdf | 18 Mar 2022 |
| PAN CardFile: Yatin PAN.pdf | 1 Jan 2022 |
| Copy of the legal title reportFile: Title Report_compressed.pdf | 1 Jan 2022 |
| Proforma of Allotment letterFile: Allotment Letter_Neelkanth Heights.pdf | 1 Jan 2022 |
| Proforma of Allotment letterFile: Agreement Draft.pdf | 1 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
Keep NEELKANTH HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HIRE NAGAR4,100+ in Nashik
Filed coordinates, straight-line distance. 180 registered projects within 2 km.
Anandvan Housing Complex
Ravi Mahajan Buildcon LLP
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: YATIN ANNASAHIB WANI
YATIN ANNASAHIB WANI has 1 registration on MahaRERA, including NEELKANTH HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if NEELKANTH HEIGHTS is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEELKANTH HEIGHTS?
The registered promoter entity is YATIN ANNASAHIB WANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEELKANTH HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEELKANTH HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEELKANTH HEIGHTS?
The professionals named in the filing: Architect: Vijay Sanap; Architect: Rajesh Wani; Engineer: Anil Kadbhane; Engineer: Sagar Shinde; Chartered Accountant: CA Paresh Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEELKANTH HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback