Home / Browse projects / Mumbai City, Maharashtra / NEBULA

Registration lapsed Litigation declared Residential / Group Housing project

NEBULA

By RUBBERWALA REALTY

RG-MH-57333 · RERA P51900010038 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 1 case
  • 5 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 97%
58 of 122Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

NEBULA is a Residential / Group Housing project by RUBBERWALA REALTY in Mumbai City, Maharashtra, registered with MahaRERA as P51900010038 on 23 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 64 of the 122 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameNEBULA
  • TypeResidential / Group Housing
  • Location
    • SINDHI LANE
    • BHULESHWAR
    • Mumbai City
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900010038
  • ReraGenie IDRG-MH-57333

Builder

  • NameRUBBERWALA REALTY
  • Entity typePartnership
  • PartnersESOOF SHOEB CONTRACTOR, TABREZ SHAFIAHMED SHAIKH

Key dates

4 months past promisethis monthRegisteredAug 2017PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed136 files

Current status

52%64 of 122 units booked
71.8%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEBULANA413010814122

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 97%.

NEBULA: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes88%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,215 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
JABIR TAIYEBALI PAREKHMumbai CityMumbai City
SAIFEE TAIYEBALI PAREKHMumbai CityMumbai City

Approvals and building plan

Permissible FSI10841.35
Proposed, not sanctioned9,082 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR A B NAIR ROAD OPP MUMBAI CENTRAL STATION MUMBAI 400008
Estimated costRs 76.69 cr
Cost incurredRs 55.02 cr
Work done71.75%
BuildingWingEstimatedIncurred
NEBULANARs 74.55 crRs 53.27 cr
-NARs 2.14 crRs 1.75 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIRANI ARCHITECTS
ArchitectSHAIKH & ASSOCIATES
EngineerJW CONSULTANTS LLP
EngineerIDRIS DOHADWALA
EngineerDIpesh Joshi
Chartered AccountantBSN & ASSOCIATES
Chartered AccountantMOHAN L GUPTA & ASSOCIATES
PartnerRole in project
RUBBERWALA REALTY-

Litigation declared1

CaseCourtStatus
581/2012SMALL CAUSESEVIDENCE AND HEARING

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000056401Satyanarayan Beniprasad ChaurasiaM/s Rubberwala Realty04/10/2018
CC006000000056431Ramesh Babulal ShuklaM/s Rubberwala Realty04/10/2018
CC006000000056433Rajesh Baijnath ChaurasiaM/s Rubberwala Realty04/10/2018
CC006000000056435Pushpa Laxmikant ShuklaM/s Rubberwala Realty04/10/2018
CC006000000056438Pranay Kishor ShahRubberwala Realty04/10/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch cert NEb mar26.pdf18 May 2026
Withdrawal Update Form 2File: Eng cert neb mar26.pdf18 May 2026
Withdrawal Update Form 3File: CA CERT MAR26 NEB.pdf18 May 2026
Withdrawal Update Form 1File: Arch cet neb dec25.pdf24 Apr 2026
Withdrawal Update Form 2File: ENG CER NEB DEC25.pdf24 Apr 2026
Withdrawal Update Form 3File: CA DEC25 NEB.pdf24 Apr 2026
Withdrawal Update Form 1File: Arch cert neb 25 - Copy.pdf26 Mar 2026
Withdrawal Update Form 2File: Eng Cert sep25_neb.pdf26 Mar 2026
Withdrawal Update Form 3File: CA CERT SEP25 NEB_compressed.pdf26 Mar 2026
Withdrawal Update Form 1File: Arch cert neb 25 - Copy.pdf2 Dec 2025
Withdrawal Update Form 2File: Engcert_june25neb.pdf2 Dec 2025
Withdrawal Update Form 3File: CA CERT NEB JUNE25.pdf2 Dec 2025
Form 5 (FY 2023-2024)File: FORM 5_NEB_2023-24.pdf26 Aug 2025
Form 1File: ARCH NEB MAR25.pdf17 Jul 2025
Form 2File: ENG CER NEB MAR25.pdf17 Jul 2025
Form 3File: CA CERT NEB MAR25.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: disc sold book_neb.pdf17 Jul 2025
Self-declaration of Quarterly ProgressFile: QPR_neb.pdf17 Jul 2025
Certificates of CA (Form 3)File: CA CERT NEB MAR25.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH NEB MAR25.pdf17 Apr 2025
Certificates of CA (Form 3)File: CA NEB DEC24_compressed.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER NEB MAR25.pdf17 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT-NEB_DEC24.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT_NEB_DEC24.pdf28 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT NEB SEP24.pdf6 Jan 2025
Certificates of CA (Form 3)File: CA Cert Neb sep24_compressed.pdf21 Nov 2024
Certificates of CA (Form 3)File: CA Cert Neb sep24_compressed.pdf21 Nov 2024
Certificates of CA (Form 3)File: CA CERT NEB DEC23_compressed.pdf13 Nov 2024
Certificates of CA (Form 3)File: CA CERT NEB 31 MAR 24_compressed.pdf13 Nov 2024
Certificates of CA (Form 3)File: CA CERT NEB JUNE 24_compressed.pdf13 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEBULA ENGINEERS CERTIFICATE (31-03-24).pdf9 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEBULA ENGINEERS CERTIFICATE (30-06-24).pdf9 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEBULA ENGINEERS CERTIFICATE (30-09-24).pdf9 Nov 2024
Certificates of CA (Form 3)File: FORM3-NEB-23.pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_neb_21-22.pdf27 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A_neb_22-23.pdf27 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A_neb_23-24.pdf27 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Nebula as on March 2024 (1).pdf11 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Nebula as on Dec 2023 (1).pdf11 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Nebula as on Dec 2023.pdf28 May 2024
Declaration about Commencement CertificateFile: Nebula Approved Revalidation Letter.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Cc 1 r.pdf21 Feb 2024
Proforma of Agreement for saleFile: Nebula - Agreement Draft.pdf8 Dec 2023
Certificates of CA (Form 3)File: NEBULA FORM 3_compressed.pdf23 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: nebula CC Revalidation till 25-06-24.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: upto March 2023 Nebula.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: upto June 2023 Nebula.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Nebula as on 11-10-2023.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Nebula-30-06-2023_compressed.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Nebula-30-09-2023_compressed.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nebula_Engineers Certificate.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nebula Arch Cert Jan 2023.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nebula EnggCert Jan 2023.pdf23 Jan 2023
Certificates of CA (Form 3)File: CA Certificate Nebula-New.pdf29 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nebula Arch Cert Sep 2022.pdf14 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nebula Engg Cert Sep 2022.pdf14 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate dated 11-07-22 - NEBULA.pdf19 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (Regulation 3)Licensed Certificate dated 07-04-22 - NEBULA.pdf19 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate new format dated 11-07-22 - NEBULA.pdf19 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate old format dated 07-04-22 - NEBULA.pdf19 Aug 2022
Building plan approvalFile: plans 1.pdf23 Jul 2022
Building plan approvalFile: plan 2.pdf23 Jul 2022
Building plan approvalFile: plans 3 to 4.pdf23 Jul 2022
Building plan approvalFile: plans 5 to 6.pdf23 Jul 2022
Building plan approvalFile: plans 7 to 8.pdf23 Jul 2022
Building plan approvalFile: plans 9 to 10.pdf23 Jul 2022
Building Plan Approval (IOD)File: plans 1.pdf23 Jul 2022
Building Plan Approval (IOD)File: plan 2.pdf23 Jul 2022
Building Plan Approval (IOD)File: plans 3 to 4.pdf23 Jul 2022
Building Plan Approval (IOD)File: plans 5 to 6.pdf23 Jul 2022
Building Plan Approval (IOD)File: plans 7 to 8.pdf23 Jul 2022
Building Plan Approval (IOD)File: plans 9 to 10.pdf23 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC 25th floor.pdf23 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nebula Engineer Cert Mar 22.pdf1 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Nebula Form 2A QC Certificate 2020-21.pdf1 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nubula Architect Certificate.pdf17 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nebula Engineer Certificate.pdf17 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A NEBULA 2019-20-compressed.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nebula form 5.pdf28 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Nebula CC dated 11-05-21.pdf14 Sep 2021

How this compares with Mumbai City

52%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEBULA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHULESHWAR780+ in Mumbai City

2 kmNEBULACompleted 32Lapsed / revoked 38Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: RUBBERWALA REALTY

RUBBERWALA REALTY has 1 registration on MahaRERA, including NEBULA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that NEBULA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NEBULA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEBULA?

The registered promoter entity is RUBBERWALA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEBULA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NEBULA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NEBULA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEBULA?

The professionals named in the filing: Architect: IRANI ARCHITECTS; Architect: SHAIKH & ASSOCIATES; Engineer: JW CONSULTANTS LLP; Engineer: IDRIS DOHADWALA; Engineer: DIpesh Joshi; Chartered Accountant: BSN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEBULA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEBULA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEBULA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.