Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Litigation declared, 2 cases
  • 4 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2024Possession promised22 months past this date
43 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 95%
461 of 577Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

SHREEPATI CASTLE is a Residential / Group Housing project by SHREEPATI CASTLE in Grant Road, 400004, registered with MahaRERA as P51900002235 on 31 Jul 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 116 of the 577 units on this registration are recorded sold or booked, and 43 of 55 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSHREEPATI CASTLE
  • TypeResidential / Group Housing
  • Location
    • Khetwadi Back Road
    • Grant Road
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900002235
  • ReraGenie IDRG-MH-20067

Builder

  • NameSHREEPATI CASTLE
  • Entity typeOthers
  • MembersRAJENDRA CHATURVEDI CHATURVEDI, TAPAS CHATURVEDI CHATURVEDI, VEENA CHATURVEDI CHATURVEDI, PALLAVI PANDEY PANDEY, SHRIKANT MERCHANT Merchant, HRIDAYA RAMESH MERCHANT Merchant, BARKHA MERCHANT Merchant, SHRUTI MERCHANT Merchant

Key dates

22 months past promisethis monthRegisteredJul 2017PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed100 files

Current status

20%116 of 577 units booked

Figures as on 7 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING DNA88181735
WING D1NA232311112123
WING B,CNA181822812240
BUILDING 2NA161602424
WING ANA434314510155

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

43 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

WING D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B,C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Open Space172
BuildingOpen SpaceTotal
WING D166
WING A166166

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,623 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Mar 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI62136.3
Proposed, not sanctioned29,183 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOWALIA TANK, MUMBAI-400036

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLD SHAH
ArchitectKalpesh Shah
EngineerBhagwan Shingala
Chartered AccountantShah & Vejani Chartered Accountants
Chartered AccountantDarshan Kishor Shah
Chartered AccountantChintan Patel and Co
PartnerRole in project
SHREEPATI CASTLE-

Litigation declared2

CaseCourtStatus
1154/2012HIGH COURTADMISSION
RAD200048/2012SMALL CAUSES COURTPART HEARD

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000000052Shrikant MerchantRajendra R Chaturvedi02/08/2017
CC006000000196220Mr. Jimmy Pesi DamaniaShreepati Castle an AOP consisting of 1) Rajendra Chaturvedi and 2) Ramesh Merchant and others02/03/2021
CC006000000292326Shantilal Mangilal ShahRajendra R. Chaturvedi13/08/2022
CC006000000480389Jimmy Pesi DamaniaShreepati Castle, Association of Persons through it's Associate members16/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jul 2025

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing B gr fl and wing C gr to 5th floor dt 16 06 2005_11zon.pdf7 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SC - Architect Certificate - Rera.pdf28 Jan 2025
Certificates of CA (Form 3)File: Final Form 3 Signed.pdf28 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SC - Engineer Certificate - Rera.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shreepati Castle AOP_Form 5.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shreepati Castle AOP_Form 5.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: S_Castle_Architect_Certificate.pdf16 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S_Castle_Engineer_Certificate.pdf16 Nov 2024
Certificates of CA (Form 3)File: RERA_Form_3_(Shreepati_Castle)_September_24.pdf16 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: S_Castle_Architect_Certificate.pdf16 Nov 2024
Certificates of CA (Form 3)File: RERA_Form_3_(Shreepati_Castle)_September_24.pdf16 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S_Castle_Engineer_Certificate.pdf16 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf22 Jul 2024
Certificates of CA (Form 3)File: RERA Form 3 (Shreepati Castle)_June 24 Final.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate - 2023-2024.pdf18 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate (Shreepati Castle) MARCH 24.pdf24 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - Shreepati Castle.pdf24 Apr 2024
Certificates of CA (Form 3)File: RERA Form 3 (Shreepati Castle)_March 24 Final.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 1.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate.pdf20 Jan 2024
Certificates of CA (Form 3)File: DS -Scastle Form 3 Final Signed.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 1 - 30-09-2023 Signed.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - 30-09-2023.pdf20 Oct 2023
Certificates of CA (Form 3)File: Final Form 3 (upload).pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 final.pdf9 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf23 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf23 Aug 2023
Certificates of CA (Form 3)File: Final Form 3 Signed.pdf23 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate dated 31-03-2023_compressed.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate dated 31-03-2023.pdf2 May 2023
Certificates of CA (Form 3)File: Form 3 signed.pdf2 May 2023
Other - TechnicalFile: Quality Assurance Certificate - Form 2A.pdf2 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate BC.pdf13 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate Building 2.pdf13 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg No 2- OC- 20-02-2008.pdf11 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing B- OC-04-02-2008.pdf11 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing C- OC- 16-06-2005.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2018 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2019 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2020 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2021 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2022 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2022 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept 2022 compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2022 compressed.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2018.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2019.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2020.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2021.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2022.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June 2022.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2022.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 2022.pdf10 Apr 2023
Certificates of CA (Form 3)File: Form 3 2018 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 2019 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 2020 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 2021 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 December 2021 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 March 2022 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 June 2022 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 Sept 2022 Esigned.pdf10 Apr 2023
Certificates of CA (Form 3)File: Final Form 3 Dec 2022 Esigned.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2018.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2019.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Final Form 5 2022 Signed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CASTLE_BLDG2.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CASTLE_WING A.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CASTLE_WING BC.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CASTLE_WING D.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CASTLE_WING D1.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf31 Oct 2017
Certificates of CA (Form 3)File: SHREEPATI CASTLE.pdf31 Oct 2017
Declaration in FORM BFile: FORM B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing A.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WING B C.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing D.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing D1.pdf25 Jul 2017

Keep SHREEPATI CASTLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Grant Road

2 kmSHREEPATI CASTLECompleted 13Lapsed / revoked 23Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: SHREEPATI CASTLE

SHREEPATI CASTLE has 1 registration on MahaRERA, including SHREEPATI CASTLE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What does it mean that SHREEPATI CASTLE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREEPATI CASTLE is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEPATI CASTLE?

The registered promoter entity is SHREEPATI CASTLE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEPATI CASTLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREEPATI CASTLE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREEPATI CASTLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEPATI CASTLE?

The professionals named in the filing: Architect: LD SHAH; Architect: Kalpesh Shah; Engineer: Bhagwan Shingala; Chartered Accountant: Shah & Vejani Chartered Accountants; Chartered Accountant: Darshan Kishor Shah; Chartered Accountant: Chintan Patel and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEPATI CASTLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEPATI CASTLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEPATI CASTLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.