Home / Browse projects / SHREEPATI BAYVIEW

De-registered Litigation declared Residential / Group Housing project

SHREEPATI BAYVIEW

By SHREEPATI BUILD INFRA INVESTMENT LIMITED

RG-MH-95589 · RERA P51900010019 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • De-registered
  • Litigation declared, 3 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
399 of 399Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

SHREEPATI BAYVIEW is a Residential / Group Housing project by SHREEPATI BUILD INFRA INVESTMENT LIMITED in 400004, registered with MahaRERA as P51900010019 on 23 Aug 2017. Possession is promised by 30 Dec 2026. 0 of the 399 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHREEPATI BAYVIEW
  • TypeResidential / Group Housing
  • Location
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900010019
  • ReraGenie IDRG-MH-95589

Builder

  • NameSHREEPATI BUILD INFRA INVESTMENT LIMITED
  • Entity typeCompany
  • Managing DirectorRAJENDRA RAMEHCHANDRA CHATURVEDI
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on23 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings5 building records
  • Documents filed61 files

Current status

0%0 of 399 units booked

Figures as on 8 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GIRGAON EKTA SOCIETYNA2424000
WING BNA20201550155
WING CNA24242370237
WING DNA2323707
WING ENA2424000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

GIRGAON EKTA SOCIETY0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Open Space133
BuildingOpen SpaceTotal
GIRGAON EKTA SOCIETY2626
WING B3131
WING C3030
WING D2828
WING E1818

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,583 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityMumbai Municipal Corporation
Permissible FSI58229.96
Proposed, not sanctioned10,437 sq m
Buildings approved5
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOWALIA TANK, MUMBAI-400036

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKALPESH SHAH
EngineerSunil Sohani
Chartered AccountantJain Ashwani & Co.
Chartered AccountantM B Agarwal & Co.
Chartered AccountantPunit B. Gupta & Associates
Chartered AccountantBansal & Co. LLP
PartnerRole in project
SHREEPATI BUILD INFRA INVESTMENT LIMITED-

Litigation declared3

CaseCourtStatus
WP/209/2015/2015HIGH COURTPREADMISSION
978/2018High CourtPre admission
978/2018High CourtClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000056636PROZONE DEVELOPERS & REALTORS PRIVATE LIMITEDShreepati Build Infra Investment Private Limited19/10/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Q1 24-25.pdf8 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Q2 24-25_compressed.pdf8 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Q3 24-25_compressed.pdf8 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Q1 03-07-2023.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Q2 02-10-2023.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Q3 02-01-2024.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Q4 03-04-2024.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Q1 03-07-2023.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Q2 02-10-2023.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Q3 03-01-2024.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Q4 02-04-2024.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: fORM-5 22-23.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5 Bayview.pdf2 May 2024
Certificates of CA (Form 3)File: bayview.pdf19 Mar 2024
Certificates of CA (Form 3)File: Shreepati Bayview MARCH 2023_compressed.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate ( Kalpesh Shah) 16-04-2022.pdf8 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginners Certificate Form 2 bayview M22.pdf8 May 2023
Certificates of CA (Form 3)File: shreepati Bayview form-3_compressed.pdf8 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Bayview Report with Annex 1_compressed.pdf8 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Bayview Report with Annex 1_compressed.pdf8 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bayview Architect certificate M 21.pdf19 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Final Engineers Certificate_Bay View 2021.pdf19 Sep 2022
Certificates of CA (Form 3)File: Form 3 bayview M 21_compressed.pdf19 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Bayview M 21.pdf19 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 RERA.pdf4 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2.pdf4 Dec 2021
Certificates of CA (Form 3)File: Form3 RERA.pdf4 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5.pdf4 Dec 2021
OtherFile: Penalty Payment Ack.pdf6 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect certificate.pdf14 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bayview_Engineer_Form_2.pdf14 Nov 2019
Certificates of CA (Form 3)File: Bayview_Form_3.pdf14 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual audit repoet_FORM 5.pdf14 Nov 2019
Certificates of CA (Form 5)File: Form -5 Bay View.pdf23 Nov 2018
OtherFile: LEGAL CERTIFICATE.pdf27 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rvised Engineers Certificates.pdf16 Oct 2018
Certificates of CA (Form 3)File: CA CER_SHREEPATI BAY VEIW_REVISED.pdf16 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cerrificate-compressed.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf15 Oct 2018
Certificates of CA (Form 3)File: CA CSR BAY VIEW.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf31 Oct 2017
Certificates of CA (Form 3)File: SHREEPATI BAY VIEW.pdf31 Oct 2017
Building plan approvalFile: IOD PLAN.pdf29 Jul 2017
Layout approvalFile: BAYVIEW.pdf29 Jul 2017
Layout approvalFile: KRANTI NAGER Approved plan.pdf29 Jul 2017
PAN CardFile: PAN SBIIL.pdf29 Jul 2017
Copy of the legal title reportFile: TITLE KRANTINAGAR.pdf29 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: BAYVIEW.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: KRANTI NAGER Approved plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD PLAN.pdf29 Jul 2017
Declaration in FORM BFile: FORM B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certitificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM 3.pdf29 Jul 2017
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf29 Jul 2017
OtherFile: CIVIL AIRPORT NOC DT 08-02-2013.pdf29 Jul 2017
OtherFile: REVISED NOC 11-12-2013-.pdf29 Jul 2017
OtherFile: MMRDA NOC DT-11-05-2015-.pdf29 Jul 2017
OtherFile: CFO NOC.pdf29 Jul 2017

Keep SHREEPATI BAYVIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmSHREEPATI BAYVIEWCompleted 13Lapsed / revoked 23Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: SHREEPATI BUILD INFRA INVESTMENT LIMITED

SHREEPATI BUILD INFRA INVESTMENT LIMITED has 3 registrations on MahaRERA, including SHREEPATI ARADHANA and SHREEPATI CORONET. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What does it mean that SHREEPATI BAYVIEW shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREEPATI BAYVIEW is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEPATI BAYVIEW?

The registered promoter entity is SHREEPATI BUILD INFRA INVESTMENT LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEPATI BAYVIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREEPATI BAYVIEW?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREEPATI BAYVIEW?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEPATI BAYVIEW?

The professionals named in the filing: Architect: KALPESH SHAH; Engineer: Sunil Sohani; Chartered Accountant: Jain Ashwani & Co.; Chartered Accountant: M B Agarwal & Co.; Chartered Accountant: Punit B. Gupta & Associates; Chartered Accountant: Bansal & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEPATI BAYVIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEPATI BAYVIEW. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEPATI BAYVIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.