Earth Enclave
RG-MH-29823 · RERA P51900046831 · Last updated on MahaRERA portal: 9 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 50.00 crore secured on the land, in favour of EARTH GRAPHICS
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Earth Enclave is a Residential / Group Housing project by Earth Graphics in Girgaon, 400004, registered with MahaRERA as P51900046831 on 10 Sep 2022. Possession is promised by 31 Dec 2027. 45 of the 238 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameEarth Enclave
- TypeResidential / Group Housing
- Location
- Vithalbhai Patel Road
- Girgaon
- 400004
- Pincode400004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900046831
- ReraGenie IDRG-MH-29823
Builder
- NameEarth Graphics
- Entity typePartnership
- PartnersBhupesh Jain, Bharat Jain
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Sep 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 9 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 55 | 45 | 209 | 29 | 238 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
A Wing: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 90% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 20% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed333
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Wing | NA | Rs 140.00 cr | Rs 155.50 cr |
| - | NA | Rs 10.00 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | P R Dharia& Associates |
| Architect | P R DHARIA & ASSOCIATES |
| Engineer | Thornton Tomasetti |
| Engineer | HEMENDR BIDAMIA |
| Chartered Accountant | D P J & CO |
| Chartered Accountant | Meghal jain & associates |
| Partner | Role in project |
|---|---|
| Earth Graphics | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form -2A Vintage.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Earth Graphics form 1.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Graphic march 2026 (1).pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: Form -3 Earth Graphics March 2026.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Earth graphic form 1 december 25.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: Graphic form-2 December 2025.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: earth ghrapics form 3 December 25.pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: Earth graphic form 1 june 25.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: earth graphics fomr 1 sept 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: Graphic form-2 June 2025.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: Graphic form-2 september 2025.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: Graphic form-3 June 2025.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: Graphic form-3 October 2025 (2).pdf | 27 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Earth Graphics.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 earth Graphics.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 graphics dec 2024.pdf | 22 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: R K WADI FURTHER CC UP TO 42ND FLOOR.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN 2023 TO MARCH 2023.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY 2024 TO SEPT 2024.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OCT22 -DEC 22.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JULY 2023 TO SEPT 2023.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JULY 2024 TO SEPT 2024.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 July to Sept 2024.pdf | 7 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A 2022-2023.pdf | 7 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A 2023-2024.pdf | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Graphics Form 5.pdf | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Graphics Form 5.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Graphics Form 5.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 Earth Graphics.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 12 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (3).pdf | 10 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E Graphics Form 2.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E Graphics Form-3.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 architect certificate OCT 2023.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE DEC 2023.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 engineer certificate OCT 2023.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE DEC 2023.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE DECC 23.pdf | 16 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE ABFL.pdf | 12 Dec 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE ABFL.pdf | 12 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: E Graphics Form -5 (01-04-2022 To 31-03-2023).pdf | 7 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC UP TO 18TH FLOOR A WING AND FULL CC FOR B WING.pdf | 10 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF UNSOLD INVENTORY JUNE QUARTER.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EARTH ENCLAVE MARCH 23.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Earth Graphics.pdf | 27 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 December 2022.pdf | 27 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 2023.pdf | 27 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Earth Graphics No Encumbrance.pdf | 25 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Earth Graphics No Encumbrance.pdf | 25 Aug 2022 |
| CERSAI detailsFile: Earth Graphics Cersai Declaration.pdf | 25 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered accountants certificate 3.pdf | 25 Aug 2022 |
| Proforma of Allotment letterFile: maharera agreement.pdf | 25 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details letter.pdf | 25 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation report on Agreement for sale.pdf | 25 Aug 2022 |
| Layout approvalFile: RK WADI PLAN FOR RERA.pdf | 27 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: RK WADI PLAN FOR RERA.pdf | 27 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 27 Jul 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 26 Jul 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Letter.pdf | 26 Jul 2022 |
| Building plan approvalFile: Building Layout Approval.pdf | 23 Jul 2022 |
| PAN CardFile: Earth Graphics Pan.pdf | 23 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout Approval.pdf | 23 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2330366_FirstCC_signed.pdf | 23 Jul 2022 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 23 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architect certificate.pdf | 23 Jul 2022 |
| Copy of the legal title reportFile: Title Report.pdf | 15 Jun 2021 |
| Declaration in FORM BFile: Form B.pdf | 13 May 2021 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Earth Vintage | Senapati Bapat Marg Dadar West Mumbai 400 028 | 37 | Completed | Dec 2021 | Oct 2021 |
| Earth Baug | 116 Shamaldas Gandhi Marg Princess Street Mumbai | 37 | Completed | Dec 2017 | Late, Mar 2018 |
| Earth Classic | Dr Babasaheb Ambedkar Road Matunga East Mumbai | 29 | Completed | Oct 2017 | Late, Nov 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Earth Enclave on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Girgaon
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
SHREEPATI CASTLE
SHREEPATI CASTLE
Meadows
Celestial Globe (A.O.P.)
SHREEPATI BAYVIEW
SHREEPATI BUILD INFRA INVESTMENT LIMITED
NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS
CHANDULAL JORAVARMALJI MEHTA
Chandan Signature
PAVAN KUMAR BACHHRAJ CHANDAN
Jayant Sky
Jayantilal Lunkad
Builder: Earth Graphics
Earth Graphics has 1 registration on MahaRERA, including Earth Enclave. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Earth Enclave is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Earth Enclave?
The registered promoter entity is Earth Graphics, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Earth Enclave?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Earth Enclave?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Earth Enclave?
The professionals named in the filing: Architect: P R Dharia& Associates; Architect: P R DHARIA & ASSOCIATES; Engineer: Thornton Tomasetti; Engineer: HEMENDR BIDAMIA; Chartered Accountant: D P J & CO; Chartered Accountant: Meghal jain & associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Earth Enclave?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.