RG-MH-15997 · RERA P51500051052 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NAVKAR RESIDENCY is a Residential / Group Housing project by NAVKAR BUILDCON in Aurangabad, Maharashtra, registered with MahaRERA as P51500051052 on 22 May 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameNAVKAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • JAI NAGARI AT SATARA
    • SATARA PARISAR
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500051052
  • ReraGenie IDRG-MH-15997

Builder

  • NameNAVKAR BUILDCON
  • Entity typePartnership
  • PartnersSACHIN RANGNATH ADMANE, SUDIP DILIP BAKHALE, SIDDHANT SANTOSH MANDLECHA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NAVKAR RESIDENCYNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

NAVKAR RESIDENCY: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area532 sq m
Land owned byThe promoter
Named landownersNone
Declared on5 Jun 2025

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI1702.05
Proposed, not sanctioned1,702 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBEED BY PASS ROAD AURANGABAD 431001

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD NARALE
EngineerCORE CONSULTANTS
Chartered AccountantA A sakala & Co
Chartered AccountantANAND UTTAMCHAND LODHA
Chartered AccountantSHAIKH HAKEEM SHAIKH HABEEB
Chartered AccountantSAURABH RAJENDRA KARNAWAT
PartnerRole in project
NAVKAR BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q4.pdf1 Jun 2026
Form 2File: Form 2 Q4.pdf1 Jun 2026
Form 3File: Form 3 Q4.pdf1 Jun 2026
Disclosure of Sold and Booked InventoryFile: Mar26.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf1 Jun 2026
Form 1File: Form 1 Q1.pdf28 Feb 2026
Form 2File: Form 2 Q1.pdf28 Feb 2026
Form 3File: Form 3 Q1.pdf28 Feb 2026
Disclosure of Sold and Booked InventoryFile: June 25.pdf28 Feb 2026
Form 1File: Form 1 Q2.pdf28 Feb 2026
Form 2File: Form 2 Q2.pdf28 Feb 2026
Form 3File: Form 3 Q2.pdf28 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sept 25.pdf28 Feb 2026
Form 1File: Form 1 Q3.pdf28 Feb 2026
Form 2File: Form 2 Q3.pdf28 Feb 2026
Form 3File: Form 3 Q3.pdf28 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dec 25.pdf28 Feb 2026
Form 1File: FORM 1 -Q4 - Navkar Buildcon.pdf7 Oct 2025
Form 2File: FORM-2 - Q4 - Navkar buildcon.pdf7 Oct 2025
Form 3File: FORM-3 -Q4- Navkar Buidcon_compressed.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: Navakar Buildcon - Booking Disclousures.pdf7 Oct 2025
Form 2A (FY 2024-2025)File: FORM-2A - Navkar Buildcon.pdf7 Oct 2025
Form 5 (FY 2024-2025)File: Signed FORM 5.pdf7 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2_11zon.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3_11zon.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June24_11zon.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep24_11zon.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec24_11zon.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: June 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sep 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Dec 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Mar 24.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Q4.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q4.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIGNED FORM 1 Q1.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIGNED FORM 1 Q2.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIGNED FORM 1 Q 3.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: June 23.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Sep 23.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Dec 23.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 Q1.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 Q2.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 Q3.pdf23 Feb 2024
CERSAI detailsFile: CERSAI declaration.pdf12 May 2023
Details of encumbrances concerned to FinanceFile: Declaration About No Encumbrances.pdf28 Mar 2023
Details of encumbrances concerned to LegalFile: Declaration About No Encumbrances.pdf28 Mar 2023
Declaration about Commencement CertificateFile: Declaration About Commenment Certificate.pdf28 Mar 2023
Declaration in FORM BFile: FORM B Affidavit Cum declaration.pdf28 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200264686591_For_Asset_Based_Search_28_03_2023_17_55_49_833.pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA Certificate signed_compressed.pdf28 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sudip Bhakale.pdf28 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Siddhant Mandlecha.pdf28 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sheru Deshmukh.pdf28 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sachin Adamane.pdf28 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account for real estate project.pdf28 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation report with respect to alltment letter.pdf28 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of agreement to sal.pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate of Navkar buildcon_compressed.pdf24 Mar 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf24 Mar 2023
Layout approvalFile: Sanction Plan 155.pdf11 Mar 2023
Building plan approvalFile: N A Order_compressed_compressed-compressed.pdf11 Mar 2023
PAN CardFile: PAN Card Navkar buildcon.pdf11 Mar 2023
Copy of the legal title reportFile: ADVOCATE search report_compressed.pdf11 Mar 2023
Copy of Layout Approval (in case of layout)File: Sanction Plan 155.pdf11 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: N A Order_compressed_compressed-compressed.pdf11 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Permission Certificate.pdf11 Mar 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SIDDHIVINAYAK PARKP51500048444MITMITA, Aurangabad36Jan 2023OngoingMar 2027Not due yet
OM SAI RAMLEELA RESIDENCYP51500034466KINKORBEN NAGAR, Aurangabad-Apr 2022Certificate SignedMar 2023Mar 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep NAVKAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA PARISAR1,400+ in Aurangabad

2 kmNAVKAR RESIDENCYCompleted 18Lapsed / revoked 14Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: NAVKAR BUILDCON

Navkar Buildcon has 2 registrations on MahaRERA, including Navkar Plaza and NAVKAR RESIDENCY. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if NAVKAR RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAVKAR RESIDENCY?

The registered promoter entity is NAVKAR BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAVKAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAVKAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAVKAR RESIDENCY?

The professionals named in the filing: Architect: PRAMOD NARALE; Engineer: CORE CONSULTANTS; Chartered Accountant: A A sakala & Co; Chartered Accountant: ANAND UTTAMCHAND LODHA; Chartered Accountant: SHAIKH HAKEEM SHAIKH HABEEB; Chartered Accountant: SAURABH RAJENDRA KARNAWAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVKAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVKAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVKAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.