NAVKAR HILLS - RAINBOW VIEW - PART 1
By NAVKAR HOLIDAY HOMES & WATER PARK LLP
RG-MH-54070 · RERA P99000049526 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAVKAR HILLS - RAINBOW VIEW - PART 1 is a Plotted project by NAVKAR HOLIDAY HOMES & WATER PARK LLP in Palghar, Maharashtra, registered with MahaRERA as P99000049526 on 15 Feb 2023. Possession is promised by 31 Dec 2027. 3 of the 20 units on this registration are recorded sold or booked.
At a glance
Project
- NameNAVKAR HILLS - RAINBOW VIEW - PART 1
- TypePlotted
- Location
- KALAMBHE
- VADA
- Palghar
- 421303
- Pincode421303
- RERA no.P99000049526
- ReraGenie IDRG-MH-54070
Builder
- NameNAVKAR HOLIDAY HOMES & WATER PARK LLP
- Entity typeOthers
- Named personsNAVKAR HOLIDAY HOMES AND WATER PARK LLP, NAVKAR HOLIDAY HOMES AND WATER PARK LLP, NAVKAR HOLIDAY HOMES AND WATER PARK LLP
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2023
- Promised completion31 Dec 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed88 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 20% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJESH R C |
| Engineer | CSE CONSULTANT |
| Chartered Accountant | R D LUKAD |
| Partner | Role in project |
|---|---|
| NAVKAR HOLIDAY HOMES & WATER PARK LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 Rainbow view Part-1 Sign.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Form 2- Rainbow view.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Rainbow View Part 1 o.pdf | 22 Apr 2026 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A ).pdf | 23 Jan 2026 |
| Form 2A (FY 2025-2026)File: Navkar Hills Rainbow View_compressed.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_11zon.pdf | 12 Jan 2026 |
| Form 5 (FY 2024-2025)File: 526.pdf | 10 Jan 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 16 Oct 2025 |
| Form 2A (FY 2024-2025)File: Navkar Hills Rainbow View_compressed.pdf | 1 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_15th_issue__Rainbow_view_Part-1_.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Navkar Hills Rainbow View Part 1_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navkar hills Rainbow View Part 1_compressed.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1Rainbow.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rainbow View.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E - Rainbow View.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-13th-issue-Rainbow_view.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rainbow View.pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rainbow View.pdf | 11 Dec 2024 |
| Other - TechnicalFile: Rainbow View.pdf | 15 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rainbow View.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rainbow View - P 1.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rainbow_view_Part-1_.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rainbow View.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 rainbow.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 rainbow.pdf | 20 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RAINBOW VIEW PART-1.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RAINBOW VIEW PART-1.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate holiday homes .pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 8 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE HOLIDAY HOMES RAINBOW VIEW.pdf | 8 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf | 8 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate holiday homes.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi- Mar- 23.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi- Jun- 23.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARch - Sep- 23.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng- Mar- 23.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng-Jun- 23.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng- Sep- 23.pdf | 28 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List (1).pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Mar 23.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-JUNE23.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-SEP.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA FORM 5.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rainbow Mar 23.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rainbow Jun 23.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rainbow Sep 23.pdf | 25 Nov 2023 |
| Layout approvalFile: Layout.pdf | 6 Feb 2023 |
| Building plan approval or NA orderFile: scan0105.pdf | 6 Feb 2023 |
| Building plan approval or NA orderFile: scan0106.pdf | 6 Feb 2023 |
| Building plan approval or NA orderFile: scan0107.pdf | 6 Feb 2023 |
| Building plan approval or NA orderFile: scan0108.pdf | 6 Feb 2023 |
| Building plan approval or NA orderFile: scan0109.pdf | 6 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 6 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0105.pdf | 6 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0106.pdf | 6 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0107.pdf | 6 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0108.pdf | 6 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan0109.pdf | 6 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Wada Phase V - NA scan copy_compressed.pdf | 6 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc declaration.pdf | 6 Feb 2023 |
| Other - TechnicalFile: cc declaration.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Self declaration -FINANCE.pdf | 20 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Legal.pdf | 20 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Self declaration -FINANCE.pdf | 20 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Legal.pdf | 20 Jan 2023 |
| Proforma of Allotment letterFile: Allotment letter_compressed.pdf | 20 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: mODEL aGREEMENT-dECLARATION.pdf | 20 Jan 2023 |
| Copy of the legal title reportFile: Legal.pdf | 16 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form no 3-lAXMAN.pdf | 16 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A NJ.pdf | 16 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 16 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure letter Suresh Jain_compressed.pdf | 16 Jan 2023 |
| Proforma of Agreement for saleFile: Navkar Wada.pdf | 16 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration form.pdf | 16 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation-Allotment.pdf | 16 Jan 2023 |
| Other - TechnicalFile: CERSAI_Search_Report_200257630428_For_Asset_Based_Search_16_01_2023_13_55_44_877.pdf | 16 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NAVKAR HILLS - RAINBOW VIEW - PART 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VADA3,200+ in Palghar
WOLLYWOOD PHASE VI
NIRVANA LIFESTYLE VENTURES
Greenway
Greenway Properties
Rajeshree Plaza
Liva Infra Builders and Developers
ELEMENTS
MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE
BALKRUSHNA SANKUL
Sai Construction
Sontakke Arcade
SIDDHIVINAYAK DEVELOPERS
See every Palghar project, with the district possession charts
Builder: NAVKAR HOLIDAY HOMES & WATER PARK LLP
Navkar Holiday Homes & Water Park LLP has 4 registrations on MahaRERA, including Navkar Hills River Bay View-Part-1 and Navkar Hills Sunset View Part-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if NAVKAR HILLS - RAINBOW VIEW - PART 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAVKAR HILLS - RAINBOW VIEW - PART 1?
The registered promoter entity is NAVKAR HOLIDAY HOMES & WATER PARK LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAVKAR HILLS - RAINBOW VIEW - PART 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NAVKAR HILLS - RAINBOW VIEW - PART 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAVKAR HILLS - RAINBOW VIEW - PART 1?
The professionals named in the filing: Architect: RAJESH R C; Engineer: CSE CONSULTANT; Chartered Accountant: R D LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAVKAR HILLS - RAINBOW VIEW - PART 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.