Home / Browse projects / Aurangabad, Maharashtra / NARAYANA RESIDENCY

Completed No litigation declared Residential / Group Housing project

NARAYANA RESIDENCY

By SHRI NARAYANA BUILDERS

RG-MH-08664 · RERA P51500022026 · Last updated on MahaRERA portal: 7 Apr 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

NARAYANA RESIDENCY is a Residential / Group Housing project by SHRI NARAYANA BUILDERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500022026 on 25 Aug 2019. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameNARAYANA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • HIRAPUR
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • RERA no.P51500022026
  • ReraGenie IDRG-MH-08664

Builder

  • NameSHRI NARAYANA BUILDERS
  • Entity typePartnership
  • PartnersPRATAPSING NARSING KAKARWAL, NARAYANRAO BHUJANGRAO JADHAV, SANJEEVKUMAR RATANLAL GUPTA, SUSHMA GAJANAN SURYAVANSHI, PRALHAD BABURAO CHAVAN, ABHAY BHAGWAN CHATE, RAVIKANT PURUSHOTTAM SONAVANE
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2019PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2019
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NARAYANA RESIDENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

NARAYANA RESIDENCY: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 7 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area542 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI615.92
Proposed, not sanctioned616 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAGHUVIR COMPLEX OPP DIST COURT AURANGABAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR B Associates
EngineerR B Associates
Chartered AccountantShamkant Borde
PartnerRole in project
SHRI NARAYANA BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Apr 2022

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A P-37,40,41 HIRAPUR.pdf7 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate (1).pdf7 Apr 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM-04 P-37,40,41 HIRAPUR (5).pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_architect_row house _31-03-2021.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -_Engineer_ row house _31-03-2021_ -3.pdf20 Oct 2021
Disclosure of sold/ booked inventoryFile: Narayana Builders.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf18 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shree 19-20.pdf18 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf18 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -_Engineer_ row house _31-03-2021_ -3.pdf16 Oct 2021
Layout approvalFile: copy of layout approal 4.pdf10 Aug 2019
Building plan approvalFile: N A ORDER LAYOUT for plotted development_compressed.pdf10 Aug 2019
Copy of the legal title reportFile: PLOT SEARCH REPORT 18_compressed (3).pdf10 Aug 2019
Details of encumbrancesFile: detail of encumbrances.pdf10 Aug 2019
Copy of Layout Approval (in case of layout)File: copy of layout approal 4.pdf10 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: N A ORDER LAYOUT for plotted development_compressed.pdf10 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf10 Aug 2019
Declaration in FORM BFile: FORM B.pdf10 Aug 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cetificate.pdf10 Aug 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf10 Aug 2019
Proforma of Allotment letterFile: agrement to sale speciman.pdf10 Aug 2019
Status of ConveyanceFile: Deed of Declaration.pdf10 Aug 2019
OtherFile: CERTIFICATE OF REGESTRATIONN 3.pdf10 Aug 2019
OtherFile: ICIC BAN AC 26.pdf10 Aug 2019
OtherFile: PARTNERSHIP DEED.pdf10 Aug 2019
OtherFile: RENT AGREEMENT.pdf10 Aug 2019
PAN CardFile: PAN.pdf9 Aug 2019

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep NARAYANA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HIRAPUR1,400+ in Aurangabad

Builder: SHRI NARAYANA BUILDERS

SHRI NARAYANA BUILDERS has 2 registrations on MahaRERA, including NARAYANA RESIDENCY and SHRI NIWASA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if NARAYANA RESIDENCY is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NARAYANA RESIDENCY?

The registered promoter entity is SHRI NARAYANA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NARAYANA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NARAYANA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NARAYANA RESIDENCY?

The professionals named in the filing: Architect: R B Associates; Engineer: R B Associates; Chartered Accountant: Shamkant Borde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NARAYANA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NARAYANA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NARAYANA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.