ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / Nandan Vatika Wing A

Registered No litigation declared Residential / Group Housing project

Nandan Vatika Wing A

By Nandan Constructions

RG-MH-14713 · RERA P51500048921 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
32 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Nandan Vatika Wing A is a Residential / Group Housing project by Nandan Constructions in Aurangabad, Maharashtra, registered with MahaRERA as P51500048921 on 24 Jan 2023. Possession is promised by 31 Mar 2027. 0 of the 32 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNandan Vatika Wing A
  • TypeResidential / Group Housing
  • Location
    • Darga Road
    • Osmanpura
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500048921
  • ReraGenie IDRG-MH-14713

Builder

  • NameNandan Constructions
  • Entity typePartnership
  • PartnersVallabh Nandlal Bagla, Subhashchandra Bansidhar Lahoti
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredJan 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

0%0 of 32 units booked

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nandan Vatika Wing ANA101032032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

Nandan Vatika Wing A: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes85%
Street LightingYes20%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,232 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation, Aurangabad
Permissible FSI3627.68
Proposed, not sanctioned3,428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAurangabad

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj Kala & Associates
EngineerCore Consultants
EngineerADITYA ANIL PAWAR
Chartered AccountantD GABSS & ASSOCIATES
Chartered AccountantJAIN & GANGWAL
PartnerRole in project
Nandan Constructions-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Nandan Vatika W-A Form1 Dec 25.pdf18 Apr 2026
Form 2File: Nandan Vatika W-A Form2 Dec 25.pdf18 Apr 2026
Form 3File: Nandan Vatika W-A Form3 Dec25.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Nandan Vatika W-A Sold Dec 25.pdf18 Apr 2026
Form 1File: Nandan Vatika W-A Form-1 March 26.pdf18 Apr 2026
Form 2File: Nandan Vatika W-A Form-2 March 26.pdf18 Apr 2026
Form 3File: Nandan Vatika W-A Form-3 March 26.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Nandan Vatika W-A SOLD March 26.pdf18 Apr 2026
Form 5 (FY 2022-2023)File: VATIKA WING A - FORM 5 22-23.pdf31 Jan 2026
Form 5 (FY 2023-2024)File: Nandan Vatika W-A Form-5 CA March 2024.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Nandan Vatika W-A Form-5 CA March 2025.pdf6 Nov 2025
Form 1File: Nandan Vatika W-A Form-1 Sep 2025.pdf5 Nov 2025
Form 2File: Nandan Vatika W-A Form-2 Sep 2025.pdf5 Nov 2025
Form 3File: Nandan Vatika W-A Form-3 Sep 2025.pdf5 Nov 2025
Disclosure of Sold and Booked InventoryFile: Nandan Vatika W-A Sold Sep 2025.pdf5 Nov 2025
Form 1File: 1 Form-1 June 25.pdf6 Aug 2025
Form 2File: 2 Form-2 June 25.pdf6 Aug 2025
Form 3File: 3 Form-3 June 25.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold June 25.pdf6 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 MAR 25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 MAR 25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 MAR 25.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A Form 1 Nandan Vatika W-A Form-1 19-01-25.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A Nandan Vatika W-A Form3 Declaration 19-01-25.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A Form 2 Nandan Vatika W-A Form-2 19-01-25.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nandan Vatika W-A Form-Architect 19-Oct-24.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nandan Vatika W-A Form-3 Declaration 18-Oct-24.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nandan Vatika W-A Form-2 18-Oct-24.pdf4 Nov 2024
Disclosure of sold/ booked inventoryFile: Nandan Vatika W-A Sold 30-Sep-24.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nandan Vatika W-A Form-1 18-Jul-24.pdf18 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nandan Vatika W-A Form-2 18-Jul-24.pdf18 Aug 2024
Disclosure of sold/ booked inventoryFile: Nandan Vatika W-A Sold 30-Jun-24.pdf18 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nandan Vatika W-A Form-3 18-Jul-24.pdf18 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nandan Vatika Form-1 14-April-24.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nandan Vatika Form-2 14-April-24.pdf27 Apr 2024
Disclosure of sold/ booked inventoryFile: Nandan Vatika Discloser 31-March-24.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nandan Vatika Form -3 14-April-24.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ( Wing A ) 11-01-2024.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ( Wing A ).pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold ( Wing A ).pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration ( Wing A ).pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 of Nandan Vatika Wing A_0001.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 of Nandan Vatika Wing A_0001.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ( 05-04-2023 ) A Wing.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing 'A' Form -2 Date 05-04-2023.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing A Form 3 Date 01-07-2023 (1).pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Wing 'A'.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing A Form -2.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Wing 'A' Form -2A.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Wing 'A'.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing 'A' Form 3.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Wing 'A' Form 5.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing A Architect's Certificate.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing A Form -2.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Wing A Form -2A.pdf23 Sep 2023
Disclosure of sold/ booked inventoryFile: Wing A Disclosure Of Sold.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing A Chartered accountant Certificate.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing A_1.pdf20 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing A_2.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Wing A_3.pdf20 Sep 2023
Disclosure of sold/ booked inventoryFile: Wing A_4.pdf20 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No-3 Wing-A.pdf20 Sep 2023
Other - TechnicalFile: 1 (2 files merged).pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration.pdf9 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200253159184_For_Asset_Based_Search_25_11_2022_11_26_43_214.pdf25 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nandan vatika wing 'A'.pdf25 Nov 2022
Building plan approvalFile: pline Area Statement.pdf21 Oct 2022
Details of encumbrances concerned to FinanceFile: ENCUM.pdf21 Oct 2022
Details of encumbrances concerned to LegalFile: LEGAL ENCUM.pdf21 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: pline Area Statement.pdf21 Oct 2022
Declaration about Commencement CertificateFile: DECL CC.pdf21 Oct 2022
Declaration in FORM BFile: Wing A_FORM B.pdf21 Oct 2022
Proforma of Agreement for saleFile: model-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdf21 Oct 2022
Proforma of Allotment letterFile: model-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdf21 Oct 2022
Proforma of Allotment letterFile: allotmrnt letter new format.pdf21 Oct 2022
Proforma of Agreement for saleFile: allotmrnt letter new format.pdf21 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf21 Oct 2022
Deviation Report with respect to Allotment letterFile: DEV IN ALLO.pdf21 Oct 2022
Deviation Report with respect to model copy of AgreementFile: DEV IN AFS.pdf21 Oct 2022

How this compares with Aurangabad

0%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Nandan Vatika Wing A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Osmanpura1,400+ in Aurangabad

2 kmNandan Vatika Wing ACompleted 31Lapsed / revoked 20Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: Nandan Constructions

Nandan Constructions has 3 registrations on MahaRERA, including Nandan Vatika Wing C and Nandan Vatika Wing B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Nandan Vatika Wing A is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nandan Vatika Wing A?

The registered promoter entity is Nandan Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nandan Vatika Wing A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nandan Vatika Wing A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nandan Vatika Wing A?

The professionals named in the filing: Architect: Manoj Kala & Associates; Engineer: Core Consultants; Engineer: ADITYA ANIL PAWAR; Chartered Accountant: D GABSS & ASSOCIATES; Chartered Accountant: JAIN & GANGWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nandan Vatika Wing A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nandan Vatika Wing A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nandan Vatika Wing A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.