ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / NABHRAJ NIKUNJ

Registered No litigation declared Others project

NABHRAJ NIKUNJ

By NABHRAJ BUILDERS AND DEVELOPERS PVT LTD

RG-MH-15460 · RERA P51500049264 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
14 of 55Construction stages doneacross 5 buildings; furthest along: Sanitary Fittings within the flats /..., 80%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

NABHRAJ NIKUNJ is a Others project by NABHRAJ BUILDERS AND DEVELOPERS PVT LTD in Aurangabad, Maharashtra, registered with MahaRERA as P51500049264 on 3 Feb 2023. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameNABHRAJ NIKUNJ
  • TypeOthers
  • Location
    • JALNA ROAD
    • SHENDRA
    • Kubhephal
    • Aurangabad
    • 431154
  • Pincode431154
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500049264
  • ReraGenie IDRG-MH-15460

Builder

  • NameNABHRAJ BUILDERS AND DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU70200MH2021PTC360567
  • GSTIN27AAHCN6011E1ZR
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsRAJESH BUTOLE, AKASH BUTOLE
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-01 BUILDINGNA98000
A-02 BUILDINGNA98000
A-03 BUILDINGNA98000
A-04 BUILDINGNA98000
B TYPE ROW HOUSENA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

A-01 BUILDING5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A-02 BUILDING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A-03 BUILDING84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
A-04 BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
B TYPE ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed698

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots698
Closed/Covered4
Open Space694
BuildingClosed/CoveredOpen SpaceTotal
A-01 BUILDING1170171
A-02 BUILDING1170171
A-03 BUILDING1170171
A-04 BUILDING1170171
B TYPE ROW HOUSE01414

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,529 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024
LandownerVillageDistrict
PRIDE CONSTRO VENTURES LLPAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAMRDA, Aurangabad
Permissible FSI19743.84
Proposed, not sanctioned17,444 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIFB Branch ABC East Chikalthana MIDC Aurangabad

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Yogesh Zavar
ArchitectAnurag R Butole
ArchitectYogesh P Zavar
EngineerARCH YOGESH ZAVAR
EngineerCore Consultant
EngineerKAILAS L SONWANE
Chartered Accountantbangad parjane & Co
Chartered AccountantK S B A and Co
Chartered AccountantR. B. Sharma & Co.
PartnerRole in project
NABHRAJ BUILDERS AND DEVELOPERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Nikunj Mar 26.pdf25 Apr 2026
Form 2File: Form 2 Nikunj Mar 26.pdf25 Apr 2026
Form 3File: Form 3 Nikunj Mar 26.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Nikunj Mar 26.pdf25 Apr 2026
Form 1File: Form 01 Nikunj Dec 25.pdf24 Feb 2026
Form 2File: Form 02 Nikunj Dec 25.pdf24 Feb 2026
Form 3File: Form 03 Nikunj Dec 25.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Nikunj Dec 25.pdf24 Feb 2026
Form 1File: Form 1 Arch Nikunj Sep 25.pdf13 Nov 2025
Form 2File: Form 2 Egg Nikunj Sep 25.pdf13 Nov 2025
Form 3File: Form 3 Nikunj Sep 25.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Nikunj Sep 25.pdf13 Nov 2025
Form 1File: 1 Form-1 Jun 25.pdf6 Aug 2025
Form 2File: 2 Form-2 Jun 25.pdf6 Aug 2025
Form 3File: 3 Form-3 June 25.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Unsold June 25.pdf6 Aug 2025
1 Form 1 Nikunj Dec 2429 Apr 2025
2 Form 1 Nikunj March 2529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 Nikunj Dec 24.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 Nikunj Mar 25.pdf29 Apr 2025
1 Form 2 Nikunj Dec 2429 Apr 2025
2 Form 2 Nikunj Mar 2529 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Sep 2024.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration Form 3.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert Jan to March 24.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert Apr to June 24 24.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert July to Sep 24.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Nikunj March 2024.pdf19 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Nikunj June 2024.pdf19 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Acc Declaration.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Nikunj.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed FOrm 3 _compressed.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2023_compressed.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Nikunj 22-23.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2023.pdf2 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2023.pdf2 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Archit March 23.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Archit June 23.pdf19 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg March 23.pdf19 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg June 23.pdf19 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Bookings March 23.pdf19 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Bookings June 23.pdf19 Aug 2023
Copy of the legal title reportFile: New Search report_compressed.pdf23 Jan 2023
Details of encumbrances concerned to FinanceFile: LEGAL NO ENC .pdf23 Jan 2023
Details of encumbrances concerned to FinanceFile: FIN NO ENC.pdf23 Jan 2023
Details of encumbrances concerned to LegalFile: LEGAL NO ENC .pdf23 Jan 2023
Details of encumbrances concerned to LegalFile: FIN NO ENC.pdf23 Jan 2023
Declaration about Commencement CertificateFile: Nabhraj Nikunj Format D.pdf23 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DeclarationAnnexure A Rajesh Butole.pdf23 Jan 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT NO DEVIATION 2.pdf23 Jan 2023
Deviation Report with respect to model copy of AgreementFile: ATS DEVIATION.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OK.pdf14 Jan 2023
Proforma of Allotment letterFile: Allotment Letter (1).pdf14 Jan 2023
Layout approvalFile: BP PLANS-5.pdf13 Jan 2023
Building plan approvalFile: BP PLANS-1.pdf13 Jan 2023
Building plan approvalFile: BP PLANS-2.pdf13 Jan 2023
Building plan approvalFile: BP PLANS-3.pdf13 Jan 2023
Building plan approvalFile: BP PLANS-4.pdf13 Jan 2023
PAN CardFile: PAN.pdf13 Jan 2023
Copy of Layout Approval (in case of layout)File: BP PLANS-5.pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BP PLANS-1.pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BP PLANS-2.pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BP PLANS-3.pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: BP PLANS-4.pdf13 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: BP CERTF (1).pdf13 Jan 2023
Declaration in FORM BFile: Form B - Land Developer.pdf13 Jan 2023
CERSAI detailsFile: 23012023CERSAI_Search_Report_200258346896_For_Asset_Based_Search_23_01_2023_13_10_02_034.p13 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSERAnnexure A - Disclosure Other Projects.pdf13 Jan 2023
Proforma of Agreement for saleFile: RERA Agreement Annexure A.pdf13 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A BANK.pdf13 Jan 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Nabhraj RYAN BUSINESS HUBP51500052587Mondha, Aurangabad160Sep 2023OngoingDec 2030Not due yet
NABHRAJ TRILOK HEIGHTSP51500032020Shahnoorwadi, Aurangabad-Dec 2021OngoingDec 2029Registered original: Dec 2026Not due yet
NABHRAJ NANDANVAN PHASE IIIP51500021357CHIKALTHANA, Aurangabad168Jun 2019OngoingJun 2026Registered original: Jul 2025Not delivered
Nabhraj TrimurtiP51500047311Shreyanagar, Osmanpura, Aurangabad-Oct 2022OngoingFeb 2025Not delivered
Nabhraj Nandanvan Phase IIP51500003126Aurangabad (M Corp.), Aurangabad-Aug 2017CompletedMay 2018May 2018

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep NABHRAJ NIKUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHENDRA1,400+ in Aurangabad

2 kmNABHRAJ NIKUNJCompleted 12Lapsed / revoked 6Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: NABHRAJ BUILDERS AND DEVELOPERS PVT LTD

NABHRAJ BUILDERS AND DEVELOPERS PVT LTD has 6 registrations on MahaRERA, including NABHRAJ TRILOK HEIGHTS and Nabhraj Trimurti. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if NABHRAJ NIKUNJ is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NABHRAJ NIKUNJ?

The registered promoter entity is NABHRAJ BUILDERS AND DEVELOPERS PVT LTD, a company as per the filing. Its CIN U70200MH2021PTC360567 and GSTIN 27AAHCN6011E1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NABHRAJ NIKUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NABHRAJ NIKUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NABHRAJ NIKUNJ?

The professionals named in the filing: Architect: Ar Yogesh Zavar; Architect: Anurag R Butole; Architect: Yogesh P Zavar; Engineer: ARCH YOGESH ZAVAR; Engineer: Core Consultant; Engineer: KAILAS L SONWANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NABHRAJ NIKUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NABHRAJ NIKUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NABHRAJ NIKUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.