ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / My Home

Completed No litigation declared Residential / Group Housing project

My Home

By SIMAR PRIDE VENTURES LLP

RG-MH-08431 · RERA P51500019553 · Last updated on MahaRERA portal: 16 Dec 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 10 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
37 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 159 documents Report an error

My Home is a Residential / Group Housing project by SIMAR PRIDE VENTURES LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500019553 on 8 Feb 2019. The registration is recorded completed; possession was promised by 30 Mar 2025.

At a glance

Project

  • NameMy Home
  • TypeResidential / Group Housing
  • Location
    • Darga Road
    • Shahnoorwadi
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500019553
  • ReraGenie IDRG-MH-08431

Builder

  • NameSIMAR PRIDE VENTURES LLP
  • Entity typePartnership
  • PartnersNITIN VENUPRASAD BAGADIYA, RAJENDRA SING DHARAM SINGH RAJPAL
  • Other registrations9 more →
  • Completed8 of 10
  • Declared earlier projects10 →

Key dates

this monthRegisteredFeb 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Feb 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed159 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA130000
Building BNA130000
Building CNA130000
Building DNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 16 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

37 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building D73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 16 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes90%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Club HouseNoNot applicable

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Closed/Covered57
Open Space103
BuildingClosed/CoveredOpen SpaceTotal
Building A162844
Building B162844
Building C162844
Building D91928

Land and ownership18

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,770 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
LandownerVillageDistrict
Satish Trimbakdas PatelAurangabad (M Corp.)Aurangabad
Kalpana Satish PatelAurangabad (M Corp.)Aurangabad
Kavita Narendra PatelAurangabad (M Corp.)Aurangabad
Ajeeta Gaurang ModyAurangabad (M Corp.)Aurangabad
Anurita Ameet PatelAurangabad (M Corp.)Aurangabad
Rajula Satish PatelAurangabad (M Corp.)Aurangabad
Panabai Uttamchand RunwalAurangabad (M Corp.)Aurangabad
Santosh Uttamchand RunwalAurangabad (M Corp.)Aurangabad
Sandip Uttamchand RunwalAurangabad (M Corp.)Aurangabad
Leelabai Madanlal JainAurangabad (M Corp.)Aurangabad
Vikram Madanlal JainAurangabad (M Corp.)Aurangabad
Sandeepkumar Madanlal JainAurangabad (M Corp.)Aurangabad
Dharamchand Uttamchand BothraAurangabad (M Corp.)Aurangabad
Rupeshkumar Uttamchand BothraAurangabad (M Corp.)Aurangabad
Kamalkumar Umedlal JainAurangabad (M Corp.)Aurangabad
Popatlal Umedlal JainAurangabad (M Corp.)Aurangabad
Shakuntala Mansukh JainAurangabad (M Corp.)Aurangabad
Harsh Mansukh JainAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI15382.79
Proposed, not sanctioned14,660 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKranti Chowk, Aurangabad

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKW Associates
EngineerCore Consultant
PartnerRole in project
SIMAR PRIDE VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jun 2023

Documents filed159

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3-My Home-Jun'22.pdf16 Dec 2023
Certificates of CA (Form 3)File: Form 3-My Home-Sep'22.pdf16 Dec 2023
Certificates of CA (Form 3)File: Form 3-My Home-Dec'22.pdf16 Dec 2023
Certificates of CA (Form 3)File: CA Certificate of My Home Dt311221_0001.pdf16 Dec 2023
Certificates of CA (Form 3)File: CA Certificate of My Home Dt310322_0001.pdf16 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 19553.pdf16 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE MY HOME-DEC'22.pdf28 Nov 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 My Home-1.pdf6 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A - Engineer's Certificate (Quality Assurance)-My Home-Dec'22.pdf30 Jun 2023
Disclosure of sold/ booked inventoryFile: corrigandum My Home A Type Building Dec'22 (4 files merged).pdf30 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2-14_13_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3-14_14_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4-14_2_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5-14_3_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6-14_4_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 7-14_5_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 8-14_6_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 9-14_7_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 10-14_8_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 11-14_9_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 12-14_10_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13-14_11_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 14-14_12_11zon.pdf24 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1-14_11zon.pdf19 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: My Home Society Pan Card.pdf17 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: My Home Society Certificate (2 files merged).pdf17 Jun 2023
Status of ConveyanceFile: Maha RERA - Declaration of Conveyance.pdf17 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: My Home OC Order copy (2).pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 My Home.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Dec'21.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Mar'22.pdf21 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Jun'22.pdf21 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Sep'22 (1).pdf21 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Sep'22.pdf21 Dec 2022
Disclosure of sold/ booked inventoryFile: corrigandum My Home A.pdf14 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Mar'22.pdf12 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Jun'22.pdf12 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Jun'22.pdf12 Nov 2022
Form 2AFile: Form - 2A - Engineer's Certificate (Quality Assurance)-My Home (1).pdf12 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Sep'21.pdf20 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Sep'21.pdf20 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Dec'21.pdf20 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My home-Mar'21.pdf9 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My home-Jun'21.pdf9 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-My Home Mar'21.pdf9 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-My Home Jun'21.pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: corrigandum My Home A Type Building 07-06-2022 (4 files merged).pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: corrigandum My HomE Building JUN 22 (4 files merged).pdf9 Aug 2022
Form 2AFile: Form - 2A - Engineer's Certificate (Quality Assurance)-My Home.pdf8 Aug 2022
Certificates of CA (Form 3)File: 0 MAR20 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Certificates of CA (Form 3)File: 1 JUN20 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Certificates of CA (Form 3)File: 2 SEP20 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Certificates of CA (Form 3)File: 3 DEC20 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Certificates of CA (Form 3)File: 4 MAR21 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Certificates of CA (Form 3)File: 5 JUN21 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Certificates of CA (Form 3)File: 6 sep21 FORM 3 - CA Cert MY HOME final.pdf5 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: my_home.pdf2 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A -My Home-MAr'22.pdf5 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Sep'21.pdf24 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Sep'21.pdf24 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Dec'21.pdf24 Feb 2022
Form 2AFile: Form 2A-Dec'21-My Home.pdf24 Feb 2022
Form 2AFile: My Home Sep'21 Form 2A.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure of SoldUnsold Inventory-My Home A Type-Jun'21.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure of SoldUnsold Inventory-My Home B Type-Jun'21.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure of SoldUnsold Inventory-My Home C Type-Jun'21.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: corrigandum My Home A Type Building (3 files merged).pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: corrigandum My Home A B C.pdf2 Feb 2022
Form 2AFile: Form - 2A - Engineer's Certificate (Quality Assurance)-My Home.pdf29 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-Mar'21-My Home.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 My Home.pdf15 Aug 2021
Form 2AFile: Form-2A My Home 6-21.pdf24 Jul 2021
Form 2AFile: Form 2A-Mar'21-My Home.pdf29 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Dec'20-My Home.pdf17 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate -Dec'20 -My Home.pdf17 Mar 2021
Form 2AFile: Form 2A -My Home-Dec'20.pdf23 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate My Home Sep'20.pdf19 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate My Home Sep'20.pdf19 Jan 2021
Building plan approvalFile: 7-12.pdf5 Jan 2021
Building Plan Approval (IOD)File: 7-12.pdf5 Jan 2021

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MY WORLD PLOT NO 2 BUILDING D1 TO D6P51500015862CHIKALTHANA, Aurangabad-Mar 2018CompletedDec 2026Jan 2023
MY WORLD BUILDING B1-B2-B3P51500015772CHIKALTHANA, Aurangabad-Mar 2018CompletedDec 2024Jan 2023
My World Building B 4-5-6Gut No 708 Chikalthana108-CompletedDec 2023Jul 2022
My World Building B 7-8-9Gut No 708 Chikalthana108-CompletedMar 2023Oct 2021
My World Building A4Gut No 708 Chikalthana36-CompletedMar 2023Oct 2021
My World Building A3Gut No 708 Chikalthana36-CompletedMar 2023Oct 2021
My World Building A1-A2Gut No 708 Chikalthana88-CompletedMar 2023Oct 2021
MANJEET PRIDE GLORYGUT NO 136P DEOLAI ROAD BEED BYPASS AURANGABAD74-CompletedJul 2017Jul 2017
manjeet prideplot no 361 316A 317 317A mahanagar1 cidco waluj aurangabad112-CompletedJul 2016Jun 2016
MANJEET PRIDE PRIMOGUT NO 81 P BEED BYPASS ROAD AURANGABAD70-CompletedMar 2015Mar 2015

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep My Home on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahnoorwadi1,400+ in Aurangabad

2 kmMy HomeCompleted 28Lapsed / revoked 23Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: SIMAR PRIDE VENTURES LLP

SIMAR PRIDE VENTURES LLP has 10 registrations on MahaRERA, including MY WORLD BUILDING A3 and MY WORLD BUILDING B1-B2-B3. Its filings disclose 10 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if My Home is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of My Home?

The registered promoter entity is SIMAR PRIDE VENTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in My Home?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for My Home?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at My Home?

The professionals named in the filing: Architect: AKW Associates; Engineer: Core Consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in My Home?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About My Home. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save My Home to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.