Home / Browse projects / Thane, Maharashtra / MY CITY - PHASE II - CLUSTER 4

Completed Litigation declared Residential / Group Housing project

MY CITY - PHASE II - CLUSTER 4

By HORIZON PROJECTS PVT LTD

RG-MH-47674 · RERA P51700008440 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 51 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedregistration recorded completed
98 of 132Construction stages doneacross 12 buildings; furthest along: Internal walls, 95%
51Complaints at MahaRERAon this registration
Jump to the 577 documents Report an error

MY CITY - PHASE II - CLUSTER 4 is a Residential / Group Housing project by HORIZON PROJECTS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700008440 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2028. 51 complaints are on record with the regulator.

At a glance

Project

  • NameMY CITY - PHASE II - CLUSTER 4
  • TypeResidential / Group Housing
  • Location
    • Diva Manpada Road
    • Usarghar
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008440
  • ReraGenie IDRG-MH-47674

Builder

  • NameHORIZON PROJECTS PVT LTD
  • Entity typeCompany
  • CINU45400MH2011PTC213029
  • GSTIN27AAFCR1404F1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsSaurabh Natu, Deepak Lohia, Sameer Parasmal Nahar, Saurabh Natu, Sameer Parasmal Nahar, Saurabh Natu
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings12 building records
  • Documents filed577 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 01NA240000
TOWER 02NA240000
TOWER 03NA240000
TOWER 04NA240000
TOWER 05NA240000
TOWER 06NA240000
TOWER 07NA240000
TOWER 08NA240000
TOWER 09NA240000
TOWER 10NA240000
TOWER 11NA240000
TOWER 12NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building12

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

98 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Internal walls, at 95%.

TOWER 01100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 02100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 03100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 04100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 05100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 0696%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
TOWER 0789%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
TOWER 0880%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
TOWER 0981%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
TOWER 1080%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
TOWER 1179%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
TOWER 1282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes33%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1317

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,317
Closed/Covered907
Open Space410
BuildingClosed/CoveredOpen SpaceTotal
TOWER 0110085185
TOWER 0210059159
TOWER 03522981
TOWER 048026106
TOWER 05522779
TOWER 0610054154
TOWER 078022102
TOWER 08801191
TOWER 09512879
TOWER 108026106
TOWER 11522981
TOWER 12801494

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,285 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI72229.62
Proposed, not sanctioned40,314 sq m
Buildings approved12
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9 and 10 MARYLAND CORNER NEAR SION CIRCLE SION EAST MUMBAI MAHARASHTRA 400022

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaakaar Architects
Architectprashant parte
ArchitectPALLAVI MATKARI
EngineerUTTAM RANGNATH KAWATHANKAR
EngineerATUL WAMAN BAPAT
Chartered AccountantM B Agarwal and Co
Chartered AccountantKshirsagar and Associates
PartnerRole in project
HORIZON PROJECTS PVT LTD-

Litigation declared5

CaseCourtStatus
11/2017Tehsildar KalyanDisposed off
553/2015Civil Judge Junior Division KalyanPending
2028/2021Bombay High CourtPending
377/2020Civil Court Jr Div KalyanPending
392/2020Civil Court Jr Div KalyanPending

Complaints filed with MahaRERA51

Case no.ComplainantRespondentFiled
CC006000000054832Bhanudas Narayan ShindeHorizon Projects Pvt Ltd18/11/2019
CC006000000198277Mr Vivek Joshi and anotherHorizon Projects Pvt Ltd06/09/2021
CC006000000044368Samir SainiHorizon Project Pvt. Ltd.15/05/2018
CC006000000001751Gulab SomayaHorizon Projects Private Limited28/11/2017
CC006000000001767VIPIN SINGH & NAMRATA SINGHHORIZON PROJECTS PRIVATE LTD04/02/2018
CC006000000012162makarand apte & madhumati apteS.S.Runwal26/11/2017
CC006000000012640Anil Rameshchandra GuptaHORIZON PROJECT PVT LTD13/01/2018
CC006000000044140ANIL RAMESHACHANDRA GUPTAHORIZON PROJECT PVT LTD19/04/2018
CC006000000012808Sandeep Acharya , Munmun JainHorizon Projects Private Limited ( My City, Phase - 2, Kalyan)18/01/2018
CC006000000022951ABHINAV SINGHhorizon projects pvt ltd24/01/2018
CC006000000022954ALOK PANKAJHORIZON PROJECTS PRIVATE LIMITED24/01/2018
CC006000000022962SUSHIL KUMAR GARGHORIZON PROJECTS PVT LTD24/01/2018
CC006000000023073PRAKASH CHANDRA NATHHORIZON PROJECT PVT LTD25/01/2018
CC006000000023080ATUL RAMDAS TRIMUKHEHORIZON PROJECTS PVT LTD24/01/2018
CC006000000023089UMESH DINESH SONIHORIZON PROJECTS PVT LTD24/01/2018
CC006000000023117Dinesh BandelkarS. S. Runwal28/01/2018
CC006000000056555Shivangi VengurlekarHorizon Projects Pvt. Ltd.13/10/2018
CC006000000181975Shivangi Ramesh VengurlekarHorizon Projects Pvt. Ltd.26/12/2019
CC006000000209824Shivangi Ramesh VengurlekarHorizon Projects Pvt. Ltd.26/01/2022
CC006000000056606sudarshan KathiHorizan Projects Pvt Ltd (Mycity phase II Cluster 04)20/10/2018
CC006000000171921SUJEET N KORIHORIZON PROJECTS PVT LTD19/12/2019
CC006000000182076My City Phase IIHorizon Projects Private Limited13/01/2020
CC006000000193910HORIZON PROJECTS PVT LTDMR. KUMAR KRISHNAIYA DESHWAN & MRS. PRIYA KUMAR DESHWAN17/09/2020
CC006000000193912HORIZON PROJECTS PVT LTDNARENDRA SINGH NEGI17/09/2020
CC006000000193913HORIZON PROJECTS PVT LTDMRS. NUTAM UMESH PAWAR & MR. UMESH SUBHEDAR PAWAR17/09/2020
CC006000000193914HORIZON PROJECTS PVT LTDMR. ROHAN SADANAND DEVE17/09/2020
CC006000000194242HORIZON PROJECTS PVT LTDMRS. MONALI RAHUL CHAVAN & MR. RAHUL SHRAVAN CHAVAN07/10/2020
CC006000000194246HORIZON PROJECTS PVT LTDMRS. VANI BALKRISHNA POTAGEVAN MR. BALKRISHNA SHIVLINGAM POTAGEVAN07/10/2020
CC006000000194247HORIZON PROJECTS PVT LTDMR. VARGHESE ABRAHAM PULIMOOTTIL, MRS. LISA VARGHESE PULIMOOTTIL & MR. VINU VARGHESE PULIMOOTTIL07/10/2020
CC006000000194280HORIZON PROJECTS PVT LTDMR. ANIL KUMAR RAMJI GUPTA & MRS. JYOTI ANILKUMAR GUPTA07/10/2020
CC006000000198200HORIZON PROJECTS PVT LTDBADRI PRASAD TRIPATHI & JWALA PRASAD03/09/2021
CC006000000198223HORIZON PROJECTS PVT LTDPAWANKUMAR YOGENDRA YADAV AND YOGENDRA YADAV03/09/2021
CC006000000198224HORIZON PROJECTS PVT LTDPRADEEP R. JAISWAL AND SANGEETA P. JAISWAL03/09/2021
CC006000000198226HORIZON PROJECTS PVT LTDPRASHANT SHYAMDHAR UPADHYAY AND SADHNA UPADHYAY03/09/2021
CC006000000198227HORIZON PROJECTS PVT LTDRAMSHISH JOKHANPRASAD GUPTA AND RENU RAMASHISH GUPTA03/09/2021
CC006000000198228HORIZON PROJECTS PRIVATE LIMITEDSAVITRI U. MAURUA03/09/2021
CC006000000194331Suraj JungadeM/s Horizon Projects Pvt. Ltd.08/10/2020
CC006000000194958Amitkumar UpadhyayHorizon project private limited19/11/2020
CC006000000197577VISHAL RAJNIKANT SHAHRUNWAL10/07/2021
CC006000000209828Prathamesh DeshpandeHorizon Projects Pvt Limited06/02/2022
CC006000000210357ROHIT UNNIKRISHNAN NAIRHORIZON PROJECTS PRIVATE LIMITED16/04/2022
CC006000000374939Gururaj Yogesh KiniM/s Horizon Projects Pvt. Ltd16/05/2023
CC006000000395835MRS NIDHI THAKKAR AND MR ASHISH MENGARM/S HORIZON PROJECTS PVT LTD30/05/2023
CC006000000396062CHETTIAR G BALASUBRAMANIANHORIZON PROJECT PVT LTD03/06/2023
CC006000000408571Mrs. Pritiy MohantyMr. Jyotirmoy MohantyM/s Horizon Projects Pvt Ltd30/12/2023
CC006000000429062Hrishikesh Vilas DesaiHorizon Projects Pvt Ltd06/02/2024
CC12400128SWATI ChauhanHORIZON PROJECTS PVT LTD17/09/2024
CC12400174GANESH MANOHAR BHOSALEHORIZON PROJECTS PVT LTD21/09/2024
CC12501415AVINASH RAMESH BAVASKARHORIZON PROJECTS PVT LTD27/04/2025
CC12502393vasudev PalavHORIZON PROJECTS PVT LTD15/07/2025
CC12502585Vihar Jayant DayalaHORIZON PROJECTS PVT LTD27/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jul 2024

Documents filed577

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 577 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Binder1_Page_01.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_01.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_02.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_03.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_04.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_05.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_06.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_07.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_08.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_09.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_10.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_11.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_12.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_13.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_14.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_15.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_16.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_17.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_18.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_19.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_20.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_21.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_22.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_23.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_24.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_25.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_26.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_27.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_28.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_29.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_30.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_31.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_32.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_33.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_34.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_35.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_36.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_37.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_38.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_39.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_40.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_41.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_42.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_43.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_44.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_45.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_35.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_24.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_25.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_26.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_27.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_28.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_29.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_30.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_31.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_32.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_33.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_34.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_23.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_36.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_37.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_38.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_39.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_40.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_41.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_42.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_43.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_44.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_45.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_12.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_01.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_02.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_03.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_04.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_05.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_06.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_07.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_08.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_09.pdf7 Oct 2024
Other - TechnicalFile: Binder1_Page_10.pdf7 Oct 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MY CITY - PHASE II - CLUSTER 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Usarghar7,600+ in Thane

2 kmMY CITY - PHASE II - CLUCompleted 15Lapsed / revoked 9Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: HORIZON PROJECTS PVT LTD

HORIZON PROJECTS PVT LTD has 10 registrations on MahaRERA, including MY CITY - PHASE I - PART I and MY CITY - PHASE I - PART III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MY CITY - PHASE II - CLUSTER 4 is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MY CITY - PHASE II - CLUSTER 4?

The registered promoter entity is HORIZON PROJECTS PVT LTD, a company as per the filing. Its CIN U45400MH2011PTC213029 and GSTIN 27AAFCR1404F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MY CITY - PHASE II - CLUSTER 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MY CITY - PHASE II - CLUSTER 4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MY CITY - PHASE II - CLUSTER 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MY CITY - PHASE II - CLUSTER 4?

The professionals named in the filing: Architect: Saakaar Architects; Architect: prashant parte; Architect: PALLAVI MATKARI; Engineer: UTTAM RANGNATH KAWATHANKAR; Engineer: ATUL WAMAN BAPAT; Chartered Accountant: M B Agarwal and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MY CITY - PHASE II - CLUSTER 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MY CITY - PHASE II - CLUSTER 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MY CITY - PHASE II - CLUSTER 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.