Home / Browse projects / Thane, Maharashtra / MY CITY- PHASE II -CLUSTER 05 - PART I

Completed Litigation declared Residential / Group Housing project

MY CITY- PHASE II -CLUSTER 05 - PART I

By HORIZON PROJECTS PVT LTD

RG-MH-49388 · RERA P51700019085 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 10 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
64 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 85%
10Complaints at MahaRERAon this registration
Jump to the 307 documents Report an error

MY CITY- PHASE II -CLUSTER 05 - PART I is a Residential / Group Housing project by HORIZON PROJECTS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700019085 on 4 Jan 2019. The registration is recorded completed; possession was promised by 30 Mar 2025. 10 complaints are on record with the regulator.

At a glance

Project

  • NameMY CITY- PHASE II -CLUSTER 05 - PART I
  • TypeResidential / Group Housing
  • Location
    • DIVA MANPADA ROAD
    • USARGHAR
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700019085
  • ReraGenie IDRG-MH-49388

Builder

  • NameHORIZON PROJECTS PVT LTD
  • Entity typeCompany
  • CINU45400MH2011PTC213029
  • GSTIN27AAFCR1404F1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsSaurabh Natu, Deepak Lohia, Sameer Parasmal Nahar, Saurabh Natu, Sameer Parasmal Nahar, Saurabh Natu
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jan 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings6 building records
  • Documents filed307 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA290000
TOWER 2NA290000
TOWER 3NA290000
TOWER 4NA290000
TOWER 5NA290000
TOWER 6NA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

64 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

TOWER 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 499%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 598%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 6100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes55%
Street LightingYes5%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes5%
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed279

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots279
Closed/Covered5
Open Space274
BuildingClosed/CoveredOpen SpaceTotal
TOWER 103535
TOWER 216869
TOWER 313435
TOWER 413536
TOWER 513435
TOWER 616869

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,756 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI63311.0
Proposed, not sanctioned49,824 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP 9, 10 MARYLAND CORNER, NEAR SION CIRCLE, NEXT TO NEXTSHOW ROOM, SION EAST, MUMBAI, MAHARASHTRA

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASHANT PARTE
ArchitectPALLAVI MATKARI
EngineerATUL WAMAN BAPAT
Chartered AccountantKshirsagar and Associates
PartnerRole in project
HORIZON PROJECTS PVT LTD-

Litigation declared1

CaseCourtStatus
11/2017Tehsildar KalyanDisposed off

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000194261EbenezerHorizon project pvt ltd02/10/2020
CC006000000195091RUNWAL MY CITY CLUSTER 5 ( HORIZON PROJECTS PVT LTDmayur bhanushali09/12/2020
CC006000000195860NIKHIL ASHOK DIVEKARHORIZON PROJECT PRIVATE LIMITED03/02/2021
CC006000000210539Hemant Jagdeesh DubeyHorizon Project Pvt. Ltd.28/03/2022
CC006000000303388Vinod Kumar Mahendra MauryaHorizon Project Pvt Ltd07/01/2023
CC006000000500604Mrs. Madhavi Mahadik Mr. Manish MahadikM/S. Horizon Projects Pvt. Ltd05/06/2024
CC006000000591133VISHAL SADASHIV GAIKWADHORIZON PROJECTS PVT LTD11/07/2024
CC12500597suhas Shantaram ShelarHORIZON PROJECTS PVT LTD21/02/2025
CC12602178HORIZON PROJECTS PVT LTDAkshay Kumar Mahesh Mali13/04/2026
CC12603817HORIZON PROJECTS PVT LTDVishakha Rohit Pawar20/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed307

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 307 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE CLUSTER 5 P1 31 03 25.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: MY CITY- PHASE II CLUSTER 05 PART I Inventory Details.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: MY CITY- PHASE II CLUSTER 05 PART I Inventory Details.pdf23 Apr 2025
Certificates of CA (Form 3)File: Form 3 Cluster 5 phase 1.pdf18 Apr 2025
OtherFile: Form 4 cluster 5 part 1 final.pdf2 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Cluster 5 Tower 1 6 31 Dec 24.pdf6 Feb 2025
Certificates of CA (Form 3)File: Form 3 CLUSTER 05 PART I.pdf3 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate CL 5 Part 1 Dec 24.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: MY CITY PHASE II CLUSTER 05 PART I.pdf1 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CLU 5- PART I.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 3 - Cluster 5- 01.pdf29 Oct 2024
Form 2AFile: CLUSTER 5 PART I-rotated.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CL05_T1 to T6.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: MY CITY- PHASE II -CLUSTER 05 - PART I.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CLUSTER 5- PART 1-signed.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CLUSTER 5- PART 1.pdf8 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cl-05 T1 - T6.pdf17 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -Cluster 5 - Tower 1 to 6.pdf25 Jul 2024
Certificates of CA (Form 3)File: Form 3 Cluster 5 01.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -Cluster 5 - Tower 1 to 6.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cluster 5 Part I - Tower 1 to 6.pdf23 Apr 2024
Certificates of CA (Form 3)File: Form 3 Cluster 5 Part 1.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cl-05 Engineer Certificate T1 to T-6.pdf16 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -Cluster 5 - Tower 1 to 6.pdf22 Jan 2024
Certificates of CA (Form 3)File: Form 3 Cluster 5 - Part 1.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Cluster 5 - 1 to 6.pdf27 Oct 2023
Certificates of CA (Form 3)File: Form 3 Cluster 5- 1 to 6.pdf27 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T1 to T6.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - My City Phase II - Cluster 5 - Part 1.pdf4 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MY City - Cluster 5 Part 1 - Engineer Certificate.pdf23 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Cluster 5 Part1.pdf24 Jul 2023
Certificates of CA (Form 3)File: Form 3 Cl 5 Part 1.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -1_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -2_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -3_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -4_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -5_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -6_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -7_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -8_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -9_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -10_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -11_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TOWER -12_CL05_JULY 2023.pdf10 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cluster 5 - PART- 1.pdf17 Jun 2023
Certificates of CA (Form 3)File: FORM 3 - Cluster 5 - Part 1.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: P51700019085 PART I.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TOWER-01 - Cluster 5 - Part 1.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TOWER-02 - Cluster 5 - Part 1.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TOWER-03 - Cluster 5 - Part 1.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TOWER-04 - Cluster 5 - Part 1.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TOWER-05 - Cluster 5 - Part 1.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 TOWER-06 - Cluster 5 - Part 1.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CL5_T1 FORM 1.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CL5_T2_FORM 1.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CL5_T3_ FORM 1.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CL5_T4_FORM 1.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CL5_T5_FORM 1.pdf21 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Cluster 5 Part 1 Signed_compressed.pdf21 Jan 2023
Certificates of CA (Form 3)File: Cluster 5 Part 1 (Part1).pdf21 Jan 2023
Certificates of CA (Form 3)File: Cluster 5 Part 1 (Part2).pdf21 Jan 2023
Certificates of CA (Form 3)File: Cluster 5 Part 1 (Part3).pdf21 Jan 2023
Certificates of CA (Form 3)File: Cluster 5 Part 1 (Part4).pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- CLUSTER 5-TOWER-1.pdf21 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- CLUSTER 5-TOWER-2.pdf21 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- CLUSTER 5-TOWER-3.pdf21 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- CLUSTER 5-TOWER-4.pdf21 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- CLUSTER 5-TOWER-5.pdf21 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CLUSTER 5 - I FORM 2.pdf21 Oct 2022
Certificates of CA (Form 3)File: Form 3 My City Cluster 5 Part 1 reduced.pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 My City Cluster 5 Part 1 2020 2021.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 My City Cluster 5 Part I 2021 2022.pdf19 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Cluster 5 Part I 30 06 2021.pdf12 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Cluster 5 Part I 30 09 2021.pdf12 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Cluster 5 Part I 31 12 2021.pdf12 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 My City Ph 2 CL05 Pt 1 300919.pdf8 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 My City Ph-2 CL05 Pt 1 311219.pdf8 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory My City Ph II CL05 Pt 1 30 06 21.pdf8 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory My City Ph II CL05 Pt 130 09 21.pdf8 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Cluster 5 Part I 30062019.pdf6 Sep 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MY CITY- PHASE II -CLUSTER 05 - PART I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near USARGHAR7,600+ in Thane

Builder: HORIZON PROJECTS PVT LTD

HORIZON PROJECTS PVT LTD has 10 registrations on MahaRERA, including MY CITY - PHASE I - PART I and MY CITY - PHASE I - PART III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MY CITY- PHASE II -CLUSTER 05 - PART I is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MY CITY- PHASE II -CLUSTER 05 - PART I?

The registered promoter entity is HORIZON PROJECTS PVT LTD, a company as per the filing. Its CIN U45400MH2011PTC213029 and GSTIN 27AAFCR1404F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MY CITY- PHASE II -CLUSTER 05 - PART I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MY CITY- PHASE II -CLUSTER 05 - PART I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MY CITY- PHASE II -CLUSTER 05 - PART I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MY CITY- PHASE II -CLUSTER 05 - PART I?

The professionals named in the filing: Architect: PRASHANT PARTE; Architect: PALLAVI MATKARI; Engineer: ATUL WAMAN BAPAT; Chartered Accountant: Kshirsagar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MY CITY- PHASE II -CLUSTER 05 - PART I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MY CITY- PHASE II -CLUSTER 05 - PART I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MY CITY- PHASE II -CLUSTER 05 - PART I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.