ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / MUSKAN PALACE

Registration lapsed No litigation declared Residential / Group Housing project

MUSKAN PALACE

By Mukhlis Yakub Mukadam

RG-MH-53228 · RERA P52800048480 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
27 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

MUSKAN PALACE is a Residential / Group Housing project by Mukhlis Yakub Mukadam in Ratnagiri, Maharashtra, registered with MahaRERA as P52800048480 on 3 Jan 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 9 of the 36 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameMUSKAN PALACE
  • TypeResidential / Group Housing
  • Location
    • NA
    • Uktad
    • Chiplun
    • Ratnagiri
    • 415605
  • Pincode415605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800048480
  • ReraGenie IDRG-MH-53228

Builder

  • NameMukhlis Yakub Mukadam
  • Entity typeIndividual

Key dates

10 months past promisethis monthRegisteredJan 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

25%9 of 36 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MUSKAN PALACENA10436036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MUSKAN PALACE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area950 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityChiplun Municipal Council
Permissible FSI1393.54
Proposed, not sanctioned1,394 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIDHARBA KONKAN GRAMIN BANK,BRANCH OMKAR 113 C NEAR HOTEL VAIBHAV MUMBAI GOA HIGHWAY A P TAL DIST RA
Estimated costRs 3.24 cr
Cost incurredRs 3.24 cr
Work done100.0%
BuildingWingEstimatedIncurred
MUSKAN PALACENARs 3.04 crRs 3.04 cr
-NARs 20.00 lakhRs 20.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhay Ravindra Kaanekar
EngineerRavindra Mahadeo Patil
EngineerMohd Aves Sayad
Chartered AccountantFarheen Kazi & Associates Chartered Accountants
Chartered AccountantSaurabh Gawali
Chartered AccountantOmkar A Sardesai
Chartered AccountantSantosh Jadhav
PartnerRole in project
Mukhlis Yakub Mukadam-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate 30-06-2025.pdf20 Jun 2026
Withdrawal Update Form 1File: Architect Certificate 30-09-2025.pdf20 Jun 2026
Withdrawal Update Form 1File: Architect Certificate 31-12-2025.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 30-06-2025.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 30-09-2025.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 31-12-2025.pdf20 Jun 2026
Withdrawal Update Form 3File: CA Certificate 30-06-2025.pdf20 Jun 2026
Withdrawal Update Form 3File: CA Certificate 30-09-2025.pdf20 Jun 2026
Withdrawal Update Form 3File: CA Certificate 31-12-2025.pdf20 Jun 2026
Form 1File: Architect Certificate 31-03-2023.pdf28 Mar 2026
Form 2File: Engineer Certificate 31-03-2023.pdf28 Mar 2026
Form 3File: CA Certificate 31-03-2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 31-03-2023.pdf28 Mar 2026
Form 1File: Architect Certificate 30-06-2023.pdf28 Mar 2026
Form 2File: Engineer Certificate 30-06-2023.pdf28 Mar 2026
Form 3File: CA Certificate 30-06-2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30-06-2023.pdf28 Mar 2026
Form 1File: Architect Certificate 30-09-2023.pdf28 Mar 2026
Form 2File: Engineer Certificate 30-09-2023.pdf28 Mar 2026
Form 3File: CA Certificate 30-09-2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30-09-2023.pdf28 Mar 2026
Form 1File: Architect Certificate 31-12-2023.pdf28 Mar 2026
Form 2File: Engneer Certificate 31-12-2023.pdf28 Mar 2026
Form 3File: CA Certificate 31-12-2023.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 31-12-2023.pdf28 Mar 2026
Form 1File: Architect Certificate 31-03-2024.pdf28 Mar 2026
Form 2File: Engineer Certificate 31-03-2024.pdf28 Mar 2026
Form 3File: CA Certificate 31-03-2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 31-03-2024.pdf28 Mar 2026
Form 1File: Architect Certificate 30-06-2024.pdf28 Mar 2026
Form 2File: Engineer Certificate 30-06-2024.pdf28 Mar 2026
Form 3File: CA Certificate 30-06-2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30-06-2024.pdf28 Mar 2026
Form 1File: Architect Certificate 30-09-2024.pdf28 Mar 2026
Form 2File: Engineer Certificate 30-09-2024.pdf28 Mar 2026
Form 3File: CA Certificate 30-09-2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30-09-2024.pdf28 Mar 2026
Form 1File: Architect Certificate 31-12-2024.pdf28 Mar 2026
Form 2File: Engineer Certificate 31-12-2024.pdf28 Mar 2026
Form 3File: CA Certificate 31-12-2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 31-12-2024.pdf28 Mar 2026
Form 1File: Architect Certificate 31-03-2025.pdf28 Mar 2026
Form 2File: Engineer Certificate 31-03-2025.pdf28 Mar 2026
Form 3File: CA Certificate 31-03-2025.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 31-03-2025.pdf28 Mar 2026
Form 2A (FY 2022-2023)File: Form 2A- 31-03-2023.pdf10 Feb 2026
Form 5 (FY 2022-2023)File: Form 5 2023.pdf1 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 2023-2024.pdf1 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 2024-2025.pdf1 Feb 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Final.pdf19 Dec 2022
Other - FinanceFile: CA Certificate Final.pdf19 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Validation.pdf23 Nov 2022
Other - TechnicalFile: Commencement Validation.pdf23 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance 2.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance 2.pdf4 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf4 Nov 2022
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf4 Nov 2022
Deviation Report with respect to Allotment letterFile: No Deviation from Allotment Letter.pdf4 Nov 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation from Agreement for Sale.pdf4 Nov 2022
Copy of the legal title reportFile: Search Report.pdf2 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200251155564_For_Asset_Based_Search_02_11_2022_12_55_11_336.pdf2 Nov 2022
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf2 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Letter Head Declaration About Seprate Account.pdf2 Nov 2022
Layout approvalFile: Blueprint.pdf31 Oct 2022
Building plan approvalFile: Blueprint.pdf31 Oct 2022
PAN CardFile: PAN Card.pdf31 Oct 2022
Copy of Layout Approval (in case of layout)File: Blueprint.pdf31 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf31 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 Oct 2022
Declaration about Commencement CertificateFile: Form D.pdf31 Oct 2022
Declaration in FORM BFile: Form B.pdf31 Oct 2022

How this compares with Ratnagiri

25%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep MUSKAN PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Uktad1,100+ in Ratnagiri

2 kmMUSKAN PALACECompleted 43Lapsed / revoked 27Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: Mukhlis Yakub Mukadam

Mukhlis Yakub Mukadam has 1 registration on MahaRERA, including MUSKAN PALACE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What does it mean that MUSKAN PALACE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MUSKAN PALACE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MUSKAN PALACE?

The registered promoter entity is Mukhlis Yakub Mukadam, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MUSKAN PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MUSKAN PALACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MUSKAN PALACE?

The professionals named in the filing: Architect: Abhay Ravindra Kaanekar; Engineer: Ravindra Mahadeo Patil; Engineer: Mohd Aves Sayad; Chartered Accountant: Farheen Kazi & Associates Chartered Accountants; Chartered Accountant: Saurabh Gawali; Chartered Accountant: Omkar A Sardesai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUSKAN PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUSKAN PALACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUSKAN PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.