ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Horizon View Exotic

Registered No litigation declared Others project

Horizon View Exotic

By Nasir Abdul Rehaman Khot

RG-MH-02754 · RERA P52800019936 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 67 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 67 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
213 of 250Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Horizon View Exotic is a Others project by Nasir Abdul Rehaman Khot in Ratnagiri, Maharashtra, registered with MahaRERA as P52800019936 on 13 Mar 2019. Possession is promised by 31 Dec 2030. The completion date has moved by 67 months from the original filing. 37 of the 250 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameHorizon View Exotic
  • TypeOthers
  • Location
    • Mumbai Goa Bypass
    • Mirjoli
    • Chiplun (M Cl)
    • Chiplun
    • Ratnagiri
    • 415605
  • Pincode415605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800019936
  • ReraGenie IDRG-MH-02754

Builder

  • NameNasir Abdul Rehaman Khot
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2019First promiseMay 2025Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Mar 2019
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 May 2025)
  • Buildings1 building record
  • Documents filed71 files

Current status

15%37 of 250 units booked
17.8%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Horizon View ExoticNA11720149250

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

Horizon View Exotic: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed268

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots268
Closed/Covered66
Open Space202

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,229 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySub Divisional Office Chiplun
Permissible FSI12229.28
Proposed, not sanctioned12,229 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAt Lal Baug Village , Bhom
Estimated costRs 28.35 cr
Cost incurredRs 5.05 cr
Work done17.81%
BuildingWingEstimatedIncurred
Horizon View ExoticNARs 25.77 crRs 4.40 cr
-NARs 2.58 crRs 65.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAJID ABDUL MAJID ALWARE
EngineerRAVINDRA MAHADEO PATIL
Chartered AccountantSaurabh Dattaram Gawali
Chartered AccountantOmkar A Sardesai
Chartered AccountantShahid Parkar
PartnerRole in project
Nasir Abdul Rehaman Khot-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04072501947May 2025 → Dec 2030

Reason as filed by the promoterAfter the Covid-19 pandemic, the project work had to be completely stopped due to severe financial crises and unexpected disruptions in cash flow, labour availability, and material supply. These unforeseen circumstances made it extremely difficult to continue the project as originally planned. However, from August 2024, we have resumed the project work in a full-fledged manner, making every effort to bring the project back on track and complete it as early as possible. Due to the prolonged financial challenges and unavoidable interruptions during and after the pandemic period, the overall proj

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate 30-09-2025.pdf23 Jun 2026
Withdrawal Update Form 1File: Architect Certificate 31-12-2025.pdf23 Jun 2026
Withdrawal Update Form 1File: Architect Certificate 31-03-2026.pdf23 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 30-09-2025.pdf23 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 31-12-2025.pdf23 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 31-03-2026.pdf23 Jun 2026
Withdrawal Update Form 3File: CA Certificate 30-09-2025.pdf23 Jun 2026
Withdrawal Update Form 3File: CA Certificate 31-12-2025.pdf23 Jun 2026
Withdrawal Update Form 3File: CA Certificate 31-03-2026.pdf23 Jun 2026
Form 1File: Architect Certificate 31-03-2024.pdf1 Jul 2025
Form 2File: Engineer Certificate 31-03-2024.pdf1 Jul 2025
Form 3File: CA Certificate 31-03-2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold 31-03-2024.pdf1 Jul 2025
Form 1File: Architect Certificate 30-06-2024.pdf1 Jul 2025
Form 2File: Engineer Certificate 30-06-2024.pdf1 Jul 2025
Form 3File: CA Certificate 30-06-2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold 30-06-2024.pdf1 Jul 2025
Form 1File: Architect Certificate 30-09-2024.pdf1 Jul 2025
Form 2File: Engineer Certificate 30-09-2024.pdf1 Jul 2025
Form 3File: CA Certificate 30-09-2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold 30-09-2024.pdf1 Jul 2025
Form 1File: Architect Certificate 31-12-2024.pdf1 Jul 2025
Form 2File: Engineer Certificate 31-12-2024.pdf1 Jul 2025
Form 3File: CA Certificate 31-12-2024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold 31-12-2024.pdf1 Jul 2025
Form 1File: Architect Certificate 31-03-2025.pdf25 Jun 2025
Form 2File: Engineer Certificate 31-03-2025.pdf25 Jun 2025
Form 3File: CA Certificate 31-03-2025.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold 31-03-2025.pdf25 Jun 2025
Form 5 (FY 2020-2021)File: Form 5 F Y 2020-21.pdf17 Jun 2025
Form 5 (FY 2021-2022)File: Form 5 F Y 2021-22.pdf17 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 F Y 2022-23.pdf17 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 F Y 2023-24.pdf17 Jun 2025
Form 5 (FY 2024-2025)File: Form 5 F Y 2024-25.pdf17 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 1.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 3.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 4.pdf18 Aug 2021
Certificates of CA (Form 3)File: CA Certificate.pdf18 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Horizon View Exotic (19-20).pdf18 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Horizon View Exotic (19-20).pdf18 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Horizon View Exotic (19-20).pdf18 Aug 2021
Declaration about Commencement CertificateFile: Format D.pdf17 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf17 Aug 2021
Copy of the legal title reportFile: Chougle Search Report_compressed.pdf23 Feb 2019
Copy of the legal title reportFile: Dalwai Land Search Report-compressed.pdf23 Feb 2019
Proforma of Allotment letterFile: AGREEMENT OF SALE HV Exotic.pdf23 Feb 2019
Building plan approvalFile: 1(1) copy.pdf22 Feb 2019
Building plan approvalFile: 1(2).pdf22 Feb 2019
Building plan approvalFile: 1(3).pdf22 Feb 2019
Building plan approvalFile: 1(4).pdf22 Feb 2019
Building plan approvalFile: 1(5).pdf22 Feb 2019
Layout approvalFile: 1(1) copy.pdf22 Feb 2019
Layout approvalFile: 1(2).pdf22 Feb 2019
Layout approvalFile: 1(3).pdf22 Feb 2019
Layout approvalFile: 1(4).pdf22 Feb 2019
Layout approvalFile: 1(5).pdf22 Feb 2019
Details of encumbrancesFile: Non Encumbrance Certificate.pdf22 Feb 2019
Copy of Layout Approval (in case of layout)File: 1(1) copy.pdf22 Feb 2019
Copy of Layout Approval (in case of layout)File: 1(2).pdf22 Feb 2019
Copy of Layout Approval (in case of layout)File: 1(3).pdf22 Feb 2019
Copy of Layout Approval (in case of layout)File: 1(4).pdf22 Feb 2019
Copy of Layout Approval (in case of layout)File: 1(5).pdf22 Feb 2019
Building Plan Approval (IOD)File: 1(1) copy.pdf22 Feb 2019
Building Plan Approval (IOD)File: 1(2).pdf22 Feb 2019
Building Plan Approval (IOD)File: 1(3).pdf22 Feb 2019
Building Plan Approval (IOD)File: 1(4).pdf22 Feb 2019
Building Plan Approval (IOD)File: 1(5).pdf22 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: Exotic NA Order.pdf22 Feb 2019
Declaration in FORM BFile: Exotic Affidavit Cum Declaration.pdf22 Feb 2019
Certificates of CA (Form 3)File: C A Certificate.pdf22 Feb 2019

How this compares with Ratnagiri

15%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 67 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Horizon View Exotic on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mirjoli1,100+ in Ratnagiri

2 kmHorizon View ExoticCompleted 38Lapsed / revoked 27Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 75 registered projects within 2 km.

Builder: Nasir Abdul Rehaman Khot

Nasir Abdul Rehaman Khot has 2 registrations on MahaRERA, including Horizon View Exotic and KNK BUILDERS AND DEVELOPERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Horizon View Exotic is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Horizon View Exotic?

The registered promoter entity is Nasir Abdul Rehaman Khot, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Horizon View Exotic?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Horizon View Exotic?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Horizon View Exotic?

The professionals named in the filing: Architect: SAJID ABDUL MAJID ALWARE; Engineer: RAVINDRA MAHADEO PATIL; Chartered Accountant: Saurabh Dattaram Gawali; Chartered Accountant: Omkar A Sardesai; Chartered Accountant: Shahid Parkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon View Exotic?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon View Exotic. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon View Exotic to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.