ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Modern Heights

Registered No litigation declared Residential / Group Housing project

Modern Heights

By Modern Construction

RG-MH-38399 · RERA P52800013654 · Last updated on MahaRERA portal: 2 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 88 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 88 months from the original
5 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 95%
95 of 96Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Modern Heights is a Residential / Group Housing project by Modern Construction in Ratnagiri, Maharashtra, registered with MahaRERA as P52800013654 on 16 Oct 2017. Possession is promised by 31 Dec 2030. The completion date has moved by 88 months from the original filing. 1 of the 96 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.

At a glance

Project

  • NameModern Heights
  • TypeResidential / Group Housing
  • Location
    • Kherdi Mohalla Road
    • Kherdi (CT)
    • Chiplun
    • Ratnagiri
    • 415605
  • Pincode415605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800013654
  • ReraGenie IDRG-MH-38399

Builder

  • NameModern Construction
  • Entity typePartnership
  • PartnersDattaram Gangaram Satam, Iqbal Umer Shaikh
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredOct 2017First promiseAug 2023Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2017
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 28 Aug 2023)
  • Buildings3 building records
  • Documents filed62 files

Current status

1%1 of 96 units booked

Figures as on 2 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA6432032
Wing BNA6432032
Wing CNA6432032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 95%.

Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 2 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15
BuildingClosed/CoveredTotal
Wing A1313
Wing B11
Wing C11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,960 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Latif Shaikh Hasan ChouguleKherdi (CT)Ratnagiri

Approvals and building plan

Sanctioning authoritySub Divisional Office Chiplun
Permissible FSI5389.12
Proposed, not sanctioned5,389 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCotton Green House Jackeria Bunder Road Mumbai 400033

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Ghorpade
Chartered AccountantSaurabh Dattaram Gawali
PartnerRole in project
Modern Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800018362Aug 2023 → Dec 2030

Reason as filed by the promoterDUE TO MARKET CONDITION NO SALE AND FINANCIAL CRISIS UNABLE TO WORK SO I WANT EXTENSION TO COMPLETE OUR PROJECT

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate 31-12-2023.pdf2 Jul 2025
Form 2File: Engineer Certificate 31-12-2023.pdf2 Jul 2025
Form 3File: CA Certificate 31-12-2023.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-12-2023.pdf2 Jul 2025
Form 1File: Architect Certificate 31-03-2024.pdf2 Jul 2025
Form 2File: Engineer Certificate 31-03-2024.pdf2 Jul 2025
Form 3File: CA Certificate 31-03-2024.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-03-2024.pdf2 Jul 2025
Form 1File: Architect Certificate 30-06-2024.pdf2 Jul 2025
Form 2File: Engineer Certificate 30-06-2024.pdf2 Jul 2025
Form 3File: CA Certificate 30-06-2024.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30-06-2024.pdf2 Jul 2025
Form 1File: Architect Certificate 30-09-2024.pdf2 Jul 2025
Form 2File: Engineer Certificate 30-09-2024.pdf2 Jul 2025
Form 3File: CA Certificate 30-09-2024.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30-09-2024.pdf2 Jul 2025
Form 1File: Architect Certificate 31-12-2024.pdf2 Jul 2025
Form 2File: Engineer Certificate 31-12-2024.pdf2 Jul 2025
Form 3File: CA Certificate 31-12-2024.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-12-2024.pdf2 Jul 2025
Form 1File: Architect Certificate 31-03-2025.pdf2 Jul 2025
Form 2File: Engineer Certificate 31-03-2025.pdf2 Jul 2025
Form 3File: CA Certificate 31-03-2025.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-03-2025.pdf2 Jul 2025
Form 5 (FY 2023-2024)File: FORM-5 FY-2023-2024.pdf25 Jun 2025
Form 5 (FY 2024-2025)File: FORM-5 FY-2024-2025.pdf25 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf22 Dec 2023
Declaration about Commencement CertificateFile: Modern Format D.pdf22 Dec 2023
Declaration in FORM BFile: Form B.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf22 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Form 2A.pdf22 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A.pdf22 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A.pdf22 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf22 Dec 2023
Disclosure of sold/ booked inventoryFile: Modern Sold 1.pdf22 Dec 2023
Disclosure of sold/ booked inventoryFile: Modern Sold 2.pdf22 Dec 2023
CERSAI detailsFile: CERSAI_Search_Report_200291006952_For_Asset_Based_Search_22_12_2023_16_44_43_418.pdf22 Dec 2023
Certificates of CA (Form 3)File: CA Certificate 30-09-2023.pdf22 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Modern Sold 1.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Modern Form 5 2017-18.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Modern Form 5 2018-19.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Modern Form 5 2019-20.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Modern Form 5 2020-21.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Modern Form 5 2021-22.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Modern Form 5 2022-23.pdf22 Dec 2023
Certificates of CA (Form 3)File: CA Certificate.pdf28 Sep 2017
Proforma of Allotment letterFile: Performa Sale Agreement.pdf28 Sep 2017
Building plan approvalFile: Blueprint 1.pdf27 Sep 2017
Building plan approvalFile: Blueprint 2.pdf27 Sep 2017
Layout approvalFile: NA Order.pdf27 Sep 2017
PAN CardFile: PAN Card.pdf27 Sep 2017
Copy of the legal title reportFile: Search Report.pdf27 Sep 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf27 Sep 2017
Copy of Layout Approval (in case of layout)File: NA Order.pdf27 Sep 2017
Building Plan Approval (IOD)File: Blueprint 1.pdf27 Sep 2017
Building Plan Approval (IOD)File: Blueprint 2.pdf27 Sep 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf27 Sep 2017
Declaration in FORM BFile: Form B Promoter.pdf27 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf27 Sep 2017
OtherFile: POA.pdf27 Sep 2017

How this compares with Ratnagiri

1%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 88 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Modern Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kherdi (CT)1,100+ in Ratnagiri

2 kmModern HeightsCompleted 12Lapsed / revoked 11Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Modern Construction

MODERN CONSTRUCTION has 2 registrations on MahaRERA, including SHASHWAT PARK and Modern Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Modern Heights is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Modern Heights?

The registered promoter entity is Modern Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Modern Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Modern Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Modern Heights?

The professionals named in the filing: Architect: Shirish Ghorpade; Chartered Accountant: Saurabh Dattaram Gawali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Modern Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Modern Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Modern Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.