Home / Browse projects / Mumbai Suburban, Maharashtra / Romell Ariana

Registered No litigation declared Residential / Group Housing project

Romell Ariana

By ROMELL REAL ESTATE PRIVATE LIMITED

RG-MH-18689 · RERA PR1180002400010 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 70.00 crore secured on the land, in favour of YES BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 18Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
103 of 110Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 33 documents Report an error

Romell Ariana is a Residential / Group Housing project by ROMELL REAL ESTATE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002400010 on 20 Sep 2024. Possession is promised by 31 Dec 2028. 7 of the 110 units on this registration are recorded sold or booked, and 6 of 18 construction stages are filed complete.

At a glance

Project

  • NameRomell Ariana
  • TypeResidential / Group Housing
  • Location
    • IC colony road
    • Borivali(West)
    • Eksar
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002400010
  • ReraGenie IDRG-MH-18689

Builder

  • NameROMELL REAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDominic Savio Romell, Jude Boniface Romell
  • Other registrations14 more →
  • Completed13 of 15
  • Declared earlier projects5 →

Key dates

this monthRegisteredSep 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed33 files

Current status

6%7 of 110 units booked
36.4%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BuildingWing A121249655
BuildingWing B121249655

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Building · wing Wing A42%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building · wing Wing B42%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered117
BuildingClosed/CoveredTotal
Building Wing A5959
Building Wing B5858

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,797 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofYES BANK LIMITED
Secured amountRs 70.00 crore
Declared on1 Jul 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12877.0
Proposed, not sanctioned7,362 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SHOP NOS. 1, 1A, 2, 3, 4, VIRESHWAR JYOT BUILDING, PLOT NO. 89, TPS NO. 1, JUNCTION OF TEJPAL ROAD - HANUMAN ROAD, VILE PARLE EAST, MUMBAI 400057
Estimated costRs 97.71 cr
Cost incurredRs 35.59 cr
Work done36.43%
BuildingWingEstimatedIncurred
BuildingWing ARs 48.85 crRs 17.80 cr
BuildingWing BRs 48.85 crRs 17.80 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGirish Chaudhari
EngineerMayuresh Bapat
EngineerPundalik Joshi
Chartered AccountantP Raj & Co.
Chartered Accountantt t
Chartered AccountantAjay Shobha & Co
Chartered AccountantM. R. Sharma & Co.
PartnerRole in project
ROMELL REAL ESTATE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed33

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Full CC.pdf11 Jun 2026
Layout approvalFile: Drawing Plan 1 to 3.pdf11 Jun 2026
Layout approvalFile: Drawing Plan 4 to 7.pdf11 Jun 2026
Layout approvalFile: Drawing Plan 8 to 10.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1 Ariana March 2026.pdf11 Jun 2026
Withdrawal Update Form 2File: Form 2 Ariana March 2026.pdf11 Jun 2026
Withdrawal Update Form 3File: Form 3 Ariana March 2026.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1 Ariana Dec2025.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 Ariana Dec2025.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 Ariana Dec2025.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 Ariana 30092025.pdf15 Nov 2025
Withdrawal Update Form 2File: Form 2 Ariana 30092025.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3 Ariana 30092025.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: RREPL Form 5 - Ariana FY 24-25.pdf18 Aug 2025
Building plan approvalFile: Amended Approval Letter 29032025.pdf8 Jul 2025
Commencement certificateFile: FurtherCC.pdf8 Jul 2025
Layout approvalFile: Amended Layout 29032025.pdf8 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Ariana_Pundalik Joshi.pdf4 Jul 2025
Form 1File: Form-1 Architects Certificate_Ariana.pdf10 Jun 2025
Form 2File: Form 2 Engineer's Certificate -Ariana.pdf10 Jun 2025
Form 3File: Form 3 CA Certificate_Ariana.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Ariana_Disclosure of Sold inventory Revised.pdf10 Jun 2025
Form 1File: Form 1 at the time of Registration.pdf10 Jun 2025
Form 2File: Form 2_ at the time of Registration.pdf10 Jun 2025
Form 3File: Form 3_ at the time of Registration.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Ariana_Disclosure of Sold inventory.pdf10 Jun 2025
Form 1File: Form-1 Architect Certificate.pdf10 Jun 2025
Form 2File: Form 2 Engineer's Certificate.pdf10 Jun 2025
Form 3File: Form 3.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Ariana_Disclosure of Sold inventory.pdf10 Jun 2025
Layout approvalFile: Layout Approval Proforma A.pdf11 Sep 2024
Building plan approvalFile: Sale Bldg-IOD Plans.pdf11 Sep 2024
Building plan approvalFile: Sale Bldg-IOD letter.pdf11 Sep 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ROMELL DIVA PHASE II - 17TH TO 20TH FLOORSOMWARI BAZAR MALAD EAST28CompletedDec 2024Apr 2019
ROMELL EMPRESS C WING PHASE I - UPTO 13TH FLOOREKSAR VILLAGE BORIVALI WEST MUMBAI 40010338CompletedDec 2022May 2019
ROMELL EMPRESS C WING PHASE II - 14TH TO 17TH FLOOREKSAR VILLAGE I C COLONY BORIVALI EAST11CompletedJun 2022Mar 2020
ROMELL DIVA PHASE I - UPTO 16TH FLOORROMELL DIVA VILLAGE MALAD SOMVAR BAZAR MALAD WEST MUMBAI106CompletedJun 2015Late, Apr 2017
Romell Umiya Grandeur Phase I - Upto 19th FloorROMELL UMIYA GRANDEUR VILLAGE PAHAI VISHWESHWAR ROAD GOREGAON E MUMBAI 400063118CompletedDec 2014Late, Oct 2016

How this compares with Mumbai Suburban

6%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Romell Ariana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali(West)6,700+ in Mumbai Suburban

2 kmRomell ArianaCompleted 78Lapsed / revoked 55Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 243 registered projects within 2 km.

Builder: ROMELL REAL ESTATE PRIVATE LIMITED

ROMELL REAL ESTATE PRIVATE LIMITED has 15 registrations on MahaRERA, including TRIMURTI CHSL PHASE I - UPTO 15TH FLOOR and TRIMURTI CHSL PHASE II - 16TH TO 18TH FLOOR. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Romell Ariana is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Romell Ariana?

The registered promoter entity is ROMELL REAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Romell Ariana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Romell Ariana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Romell Ariana?

The professionals named in the filing: Architect: Girish Chaudhari; Engineer: Mayuresh Bapat; Engineer: Pundalik Joshi; Chartered Accountant: P Raj & Co.; Chartered Accountant: t t; Chartered Accountant: Ajay Shobha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Romell Ariana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Romell Ariana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Romell Ariana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.