Home / Browse projects / Mumbai Suburban, Maharashtra / THE CASTLE

Registered No litigation declared Others project

THE CASTLE

By SOLIDAGO REALTY

RG-MH-52326 · RERA P51800047865 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
12 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
134 of 173Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

THE CASTLE is a Others project by SOLIDAGO REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047865 on 28 Nov 2022. Possession is promised by 30 Aug 2027. 39 of the 173 units on this registration are recorded sold or booked, and 12 of 44 construction stages are filed complete.

At a glance

Project

  • NameTHE CASTLE
  • TypeOthers
  • Location
    • Mount Poisar Road
    • Borivali west
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • RERA no.P51800047865
  • ReraGenie IDRG-MH-52326

Builder

  • NameSOLIDAGO REALTY
  • Entity typePartnership
  • PartnersJAYESH CHAUHAN, PRAVIN CHAUHAN
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2022PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2022
  • Promised completion30 Aug 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed122 files

Current status

23%39 of 173 units booked
47.8%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA141347754
B WINGNA141334438
C WINGNA141334640
D WINGNA141336541

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A WING68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B WING69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
C WING69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
D WING69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,985 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 May 2026
LandownerVillageDistrict
Stone Castle Co op Housing Society LimitedBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI14390.0
Proposed, not sanctioned11,886 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT, MUMBAI
Estimated costRs 80.00 cr
Cost incurredRs 38.25 cr
Work done47.81%
BuildingWingEstimatedIncurred
A WINGNARs 29.95 crRs 14.32 cr
B WINGNARs 19.64 crRs 9.39 cr
D WINGNARs 16.03 crRs 7.66 cr
C WINGNARs 14.39 crRs 6.88 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARIVARTAN ARCHITECT & ENGINEER
ArchitectPARIVARTAN ARCHITECTS & ENGINEERS
EngineerKACHA NILESH KALUBHAI
EngineerSURA & ASSOCIATES
Chartered AccountantNEHALI & CO
PartnerRole in project
SOLIDAGO REALTY-

Litigation declared3

CaseCourtStatus
4463 OF 2019/2019BOMBAY HIGH COURTTake Note that Developer is not party to Court proceedings suit and writ
1454 OF 2021/2021BOMBAY HIGH COURTTake Note that Developer is not party to Court proceedings suit and writ
16790 OF 2021/2021BOMBAY HIGH COURTTake Note that Developer is not party to Court proceedings suit and writ

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Aug 2027

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 17 04 2026.pdf4 Jul 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 NEW 20 04 2026.pdf4 Jul 2026
Withdrawal Update Form 3File: Signed CA Certificate Solidago m26.pdf4 Jul 2026
Withdrawal Update Form 1File: Form 1 30 06 2025.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1 30 09 2025.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1 01 01 2026.pdf3 Jul 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 NEW 18 072025.pdf3 Jul 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 NEW 16 10 2025.pdf3 Jul 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 NEW 15 01 2026.pdf3 Jul 2026
Withdrawal Update Form 3File: Signed CA Certificate Solidago June25.pdf3 Jul 2026
Withdrawal Update Form 3File: Signed CA Certificate Solidago Sept25.pdf3 Jul 2026
Withdrawal Update Form 3File: Signed CA Certificate Solidago dec 25.pdf3 Jul 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Solidago March25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 NEW.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Jul 2024
Layout approvalFile: FULL CC PLAN_1-1.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_2-2.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_3-3.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_4-4.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_5-5.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_6-6.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_7-7.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_8-8.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_9-9.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_10-10.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_11-11.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_12-12.pdf24 May 2024
Layout approvalFile: FULL CC PLAN_13-end.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_1-1.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_2-2.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_3-3.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_4-4.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_5-5.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_6-6.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_7-7.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_8-8.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_9-9.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_10-10.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_11-11.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_12-12.pdf24 May 2024
Copy of Layout Approval (in case of layout)File: FULL CC PLAN_13-end.pdf24 May 2024
Commencement Certificates / NA Order for plotted developmentFile: FULL CC CERTIFICATE.pdf24 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE FOR QUALITY ASSURANCE MARCH 2024.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 NEW - mar 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Solidago mar'24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: FINAL INVENTION SHEET FOR RERA.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised signed_CA Certificate Solidago Dec'23 (1).pdf23 Mar 2024
Disclosure of sold/ booked inventoryFile: FINAL INVENTION SHEET FOR RERA.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 DECEMBER 23 (1).pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final Signed CA Certificate Solidago Dec'23.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: RERA ENCUMBRANCE CERTIFICATE.pdf3 Jan 2024
Details of encumbrances concerned to LegalFile: RERA ENCUMBRANCE CERTIFICATE.pdf3 Jan 2024
Details of encumbrances concerned to FinanceFile: RERA ENCUMBRANCE SELF-DECLARATION.pdf25 Oct 2023
Details of encumbrances concerned to LegalFile: RERA ENCUMBRANCE SELF-DECLARATION.pdf25 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_Security_.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2 SEPTEMBER 23.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Solidago Realty September'23.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SOLIDAGO REALTY FORM 5 FY 2022-23.pdf29 Sep 2023
Layout approvalFile: output_1-3.pdf16 Sep 2023
Layout approvalFile: output_4-5.pdf16 Sep 2023
Layout approvalFile: output_6-7.pdf16 Sep 2023
Layout approvalFile: output_8-9.pdf16 Sep 2023
Layout approvalFile: output_10-end.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: output_1-3.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: output_4-5.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: output_6-7.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: output_8-9.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: output_10-end.pdf16 Sep 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CHAMUNDA DREAM CITYKoparli Rd Chharwada Besides St. Xaviers high school Vapi E Gujarat 396191350CompletedApr 2017Apr 2017
CHAMUNDA CLASSIC3 Siddhi Vinayak Nagar Mahajan Wadi Mira Road Mira Bhayandar Thane 401107132CompletedApr 2012Apr 2012

How this compares with Mumbai Suburban

23%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE CASTLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali west6,700+ in Mumbai Suburban

Builder: SOLIDAGO REALTY

SOLIDAGO REALTY has 1 registration on MahaRERA, including THE CASTLE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE CASTLE is delayed beyond 30 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE CASTLE?

The registered promoter entity is SOLIDAGO REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE CASTLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE CASTLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE CASTLE?

The professionals named in the filing: Architect: PARIVARTAN ARCHITECT & ENGINEER; Architect: PARIVARTAN ARCHITECTS & ENGINEERS; Engineer: KACHA NILESH KALUBHAI; Engineer: SURA & ASSOCIATES; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE CASTLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE CASTLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE CASTLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.