Home / Browse projects / Mumbai Suburban, Maharashtra / MAYFAIR AANGAN
MAYFAIR AANGAN
By MAYFAIR HOUSING PRIVATE LIMITED
RG-MH-37436 · RERA PR1180002601809 · Last updated on MahaRERA portal: 26 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 80.00 crore secured on the land, in favour of India Real Estate Investment Fund Series II
- Allotment letter deviates from the model form
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAYFAIR AANGAN is a Residential / Group Housing project by MAYFAIR HOUSING PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002601809 on 7 Sep 2026. Possession is promised by 31 Dec 2032. 0 of the 196 units on this registration are recorded sold or booked, and 0 of 40 construction stages are filed complete.
At a glance
Project
- NameMAYFAIR AANGAN
- TypeResidential / Group Housing
- Location
- Mandpeshwar Road
- CTS No. 57 at village Mandpeshwar
- at Laxman Mhatre Road
- Navagaon
- Dahisar (West)
- Madpeshwar
- Borivali
- Mumbai Suburban
- 400103
- Pincode400103
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1180002601809
- ReraGenie IDRG-MH-37436
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Sep 2026
- Promised completion31 Dec 2032
- Revised completionNone
- Buildings4 building records
- Documents filed17 files
Current status
Figures as on 26 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing: A; B; C & D | Wing "A" | 14 | 12 | 29 | 11 | 40 |
| Wing: A; B; C & D | Wing "B" | 14 | 12 | 29 | 19 | 48 |
| Wing: A; B; C & D | Wing "C" | 17 | 15 | 47 | 0 | 47 |
| Wing: A; B; C & D | Wing "D" | 23 | 21 | 61 | 0 | 61 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 40 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.
Wing: A; B; C & D · wing Wing "A"0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing: A; B; C & D · wing Wing "B"0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing: A; B; C & D · wing Wing "C"0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing: A; B; C & D · wing Wing "D"0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | Not applicable |
Parking filed310
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Podiums / Upper Parking Floor | Total |
|---|---|---|---|
| Wing: A; B; C & D Wing "A" | 21 | 54 | 75 |
| Wing: A; B; C & D Wing "B" | 28 | 67 | 95 |
| Wing: A; B; C & D Wing "C" | 23 | 48 | 71 |
| Wing: A; B; C & D Wing "D" | 23 | 46 | 69 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| GANESH PRASAD CO OPERATIVE HOUSING SOCIETY LIMITED | Madpeshwar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAI MISTRY |
| Architect | AR Design Studio |
| Architect | Kaushik Patel Architects |
| Engineer | Mr Sanjeev Basavantappa Tigadi |
| Engineer | AVP SRTUCTURAL CONSULTANTS |
| Chartered Accountant | HEMANT JAIN |
| Chartered Accountant | M/S M.D.DUMASIA & CO |
| Partner | Role in project |
|---|---|
| MAYFAIR HOUSING PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalNot on the file
The planning authority's approval of how the plots and buildings sit on the land.
- Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Aug 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2032
Documents filed17
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration and undertaking (Annexure A)File: Annexure A Declaration cum Undertaking.pdf | 26 Aug 2026 |
| Building plan approvalFile: IOD Letter of Ganesh Prasad CHSL.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 1.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 2.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 3.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 4.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 5.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 6.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 7.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 8.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 9.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 10.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 11.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 12.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 13.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 14.pdf | 26 Aug 2026 |
| Building plan approvalFile: Ganesh Prasad IOD Plan 15.pdf | 26 Aug 2026 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MAYFAIR ASTRAL | Patel Estate Road Jogeshwari West Mumbai 400 102 | 25 | Completed | Jun 2017 | Mar 2017 |
| MAYFAIR VISHWARAJA BUILDING C | Ganesh Mandir Road Titwala East Taluka Kalyan Dist Thane 421 605 | 35 | Completed | Mar 2017 | Mar 2017 |
| MAYFAIR MYSTIC | R B Mehta Marg Ghatkopar East Mumbai 400 077 | 28 | Completed | Jun 2016 | Jun 2015 |
| MAYFAIR VISHWARAJA BUILDING D AND E | Ganesh Mandir Road Titwala East Taluka Kalyan Dist Thane 421 605 | 62 | Completed | Mar 2016 | Mar 2016 |
| MAYFAIR SHYAM | Kastur Park Shimpoli Road Borivali West Mumbai 400 092 | 13 | Completed | Jan 2016 | Sep 2015 |
| MAYFAIR GREENS | Near Poisar Subway Kandivali West Mumbai 400 067 | 92 | Completed | Dec 2015 | Late, Mar 2016 |
| MAYFAIR AKSHAY | Cross Road No 1 Swami Samarth Nagar Andheri West Mumbai 400 053 | 31 | Completed | Dec 2015 | Dec 2015 |
| MAYFAIR SERENE | 28th Road Near Guru Nanak Park Bandra West Mumbai 400 050 | 4 | Completed | Dec 2014 | Dec 2014 |
| MAYFAIR BOULEVARD | Main Avenue Santacruz West Mumbai 400 054 | 6 | Completed | Jun 2014 | Late, Sep 2014 |
| MAYFAIR HERITAGE | Besant Road Off S V Road Santacruz West Mumbai 400 054 | 29 | Completed | Mar 2014 | Late, Sep 2014 |
| MAYFAIR KUMKUM | S. V. ROAD ANDHERI WEST MUMBAI 400058 | 22 | Completed | Jun 2013 | Late, Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 17 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAYFAIR AANGAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CTS No. 57 at village Mandpeshwar, at Laxman Mhatre Road, Navagaon, Dahisar (West)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 244 registered projects within 2 km.
THE CASTLE
SOLIDAGO REALTY
103 West
M/s. RELCON ZP JE CONSTRUCTION LLP
HAPPY HOME CHSL
SUMUKH INFRA
Romell Ariana
ROMELL REAL ESTATE PRIVATE LIMITED
Kamla Borivali Lucky
Kamla Homes and Lifestyles Private Limited
RISHABRAJ PHOENIX
RISHABRAJ ESTATE DEVELOPERS PVT LTD
See every Mumbai Suburban project, with the district possession charts
Builder: MAYFAIR HOUSING PRIVATE LIMITED
MAYFAIR HOUSING PRIVATE LIMITED has 6 registrations on MahaRERA, including MAYFAIR VISHWARAJA and MAYFAIR AASAAN. Its filings disclose 11 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MAYFAIR AANGAN is delayed beyond 31 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAYFAIR AANGAN?
The registered promoter entity is MAYFAIR HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U70100MH1986PTC041829 and GSTIN 27AAACM5158N1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAYFAIR AANGAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAYFAIR AANGAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAYFAIR AANGAN?
The professionals named in the filing: Architect: JAI MISTRY; Architect: AR Design Studio; Architect: Kaushik Patel Architects; Engineer: Mr Sanjeev Basavantappa Tigadi; Engineer: AVP SRTUCTURAL CONSULTANTS; Chartered Accountant: HEMANT JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAYFAIR AANGAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback