MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.

By MAVERICK REALTORS

RG-MH-24220 · RERA P51800003411 · Last updated on MahaRERA portal: 4 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 69 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 69 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
16 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD. is a Residential / Group Housing project by MAVERICK REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003411 on 5 Aug 2017. Possession is promised by 30 Mar 2027. The completion date has moved by 69 months from the original filing. 38 of the 54 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameMULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.
  • TypeResidential / Group Housing
  • Location
    • MULUND
    • MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003411
  • ReraGenie IDRG-MH-24220

Builder

  • NameMAVERICK REALTORS
  • Entity typeOthers
  • Named personsPARESH KANTILAL SHAH, HARSH PARESH SHAH, TUSHAR BABULAL KUVADIA, Maverick Real Estate Pvt Ltd
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion30 Mar 2027
  • Revised completionRevised to 30 Mar 2027 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed97 files

Current status

70%38 of 54 units booked
99.9%Work done, per cost certificate

Figures as on 4 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MULUND MAHAVIRDHAM CHS LTDNA222254054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

MULUND MAHAVIRDHAM CHS LTD: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,668 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Aug 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI5629.5
Proposed, not sanctioned5,117 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKARDHAN PLAZA,OPP MEHUL CINEMA,JUNCTION OF M M ROAD AND NAHUR ROADMULUND WESTMUMBAI-400 080
Estimated costRs 28.56 cr
Cost incurredRs 28.53 cr
Work done99.9%
BuildingWingEstimatedIncurred
MULUND MAHAVIRDHAM CHS LTDNARs 26.12 crRs 26.12 cr
-NARs 2.43 crRs 2.41 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV. S. VAIDYA & ASSOCIATES
EngineerGAUTAM CHANDE
EngineerPravin Pitale Corporate Engineers
EngineerKunwarji Raghavji Ratnani
Chartered AccountantS K RAMBHIA & ASSOCIATES
Chartered AccountantSachin Sunil and Associates
Chartered AccountantNehal Mitul Faria
PartnerRole in project
MAVERICK REALTORS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009515Jun 2021 → Jun 2022

Reason as filed by the promoterOn account of restrictions imposed on Construction activities and Real Estate sector due to Covid 19 since Mar’ 2020 & thereafter due to low demand & overall slowdown in economy, in Real Estate Sector there is a delay in completion of Project. And due to the same it is expected that Project would get completed by Sep 2021 and Occupancy Certificate shall be obtained on or before 31st May 2022. Kindly, therefore, grant extension till 30th June, 2022

EXT51800012934Jun 2021 → Oct 2023

Reason as filed by the promoterIt’s a redevelopment project on account of restrictions imposed on Construction activities and Real Estate sector due to Covid 19 since Mar’ 2020 & thereafter due to low demand & overall slowdown in economy, in Real Estate Sector there is a delay in completion of Project. And due to the same it is expected that Project would get completed by Aug’ 2023 and Occupancy Certificate shall be obtained on or before 30th Sep’ 2023. Kindly, therefore, grant extension till 31st Oct, 2023.

EA11082622096Jun 2021 → Nov 2026

Reason as filed by the promoterDear Sir/Madam We have received Occupancy Certificate/Completion Certificate of the project, the same was received post Rera completion date, so we request your goodself to please allow us extension till 30.11.2026.

P51800003411/WarJun 2021 → Mar 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jun 2025

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: MULUNDMAHAVIRDHAMDT05042024C.pdf4 Sep 2026
Withdrawal Update Form 1File: MULUNDMAHAVIRDHAMDT05042024C.pdf4 Sep 2026
Withdrawal Update Form 1File: MULUNDMAHAVIRDHAMDT05042024C.pdf4 Sep 2026
Withdrawal Update Form 1File: MULUNDMAHAVIRDHAMDT05042024C.pdf4 Sep 2026
Withdrawal Update Form 1File: MULUNDMAHAVIRDHAMDT05042024C.pdf4 Sep 2026
Withdrawal Update Form 2File: MMDForm231032024compressed.pdf4 Sep 2026
Withdrawal Update Form 2File: MMDForm231032024compressed.pdf4 Sep 2026
Withdrawal Update Form 2File: MMDForm231032024compressed.pdf4 Sep 2026
Withdrawal Update Form 2File: MMDForm231032024compressed.pdf4 Sep 2026
Withdrawal Update Form 2File: MMDForm231032024compressed.pdf4 Sep 2026
Withdrawal Update Form 3File: MMD Form3 31-03-2024 With Sign.pdf4 Sep 2026
Withdrawal Update Form 3File: MMD Form3 31-03-2024 With Sign.pdf4 Sep 2026
Withdrawal Update Form 3File: MMD Form3 31-03-2024 With Sign.pdf4 Sep 2026
Withdrawal Update Form 3File: MMD Form3 31-03-2024 With Sign.pdf4 Sep 2026
Withdrawal Update Form 3File: MMD Form3 31-03-2024 With Sign.pdf4 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A MMD March 2026.pdf4 Sep 2026
Form 2A (FY 2023-2024)File: Form 2A MMD March 2024.pdf4 Sep 2026
Form 2A (FY 2024-2025)File: Form 2A MMD March 2025.pdf4 Sep 2026
Form 5 (FY 2023-2024)File: RERA Form-5_FY23-24_Mahavir Dham (1).pdf4 Sep 2026
Form 5 (FY 2024-2025)File: RERA Form-5_FY23-24_Mahavir Dham (1).pdf4 Sep 2026
Form 5 (FY 2025-2026)File: RERA Form-5_FY23-24_Mahavir Dham (1).pdf4 Sep 2026
Form 1File: Form 1 MULUND MAHAVIR DHAM JUN23.pdf1 Sep 2026
Form 2File: MMDForm230062023 - Ratnani.pdf1 Sep 2026
Form 3File: Form 3 Mahavir Dham June 2023.pdf1 Sep 2026
Disclosure of Sold and Booked InventoryFile: MMD Sold Unsold Inventory June 2023.pdf1 Sep 2026
Form 1File: Form 1 MULUND MAHAVIR DHAM SEP23.pdf1 Sep 2026
Form 2File: MMD Form2 SEP23.pdf1 Sep 2026
Form 3File: MMDForm330092023.pdf1 Sep 2026
Disclosure of Sold and Booked InventoryFile: MMD Sold Unsold Inventory Sep 2023.pdf1 Sep 2026
Form 1File: Form 1 MMD 31122023.pdf1 Sep 2026
Form 2File: MMD Form2 31122023.pdf1 Sep 2026
Form 3File: MMD Form3 31122023.pdf1 Sep 2026
Disclosure of Sold and Booked InventoryFile: MMD Sold Unsold Inventory Dec 2023.pdf1 Sep 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Mahavir Dham Full OC.pdf30 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm231122022.pdf19 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm231032023.pdf19 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm230062023.pdf19 Feb 2025
Certificates of CA (Form 3)File: MulundMahavirDhamFrom331032023.pdf17 Feb 2025
Certificates of CA (Form 3)File: Form3MahavirDhamcompressed.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MMDFrom131122023.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MULUNDMAHAVIRDHAMDT05042024C.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MULUNDMAHAVIRDHAMDT30062024C.pdf7 Feb 2025
Certificates of CA (Form 3)File: MMDForm330092023.pdf7 Feb 2025
Certificates of CA (Form 3)File: MMDForm331122023comps.pdf7 Feb 2025
Certificates of CA (Form 3)File: MMDForm331032024comps.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm230092023Comps.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm231122023Comps.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm231032024compressed.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MMD Mar'24 Form2A Done with both signature_compressed.pdf7 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form-5_FY23-24_Mahavir Dham (1).pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MULUND MAHAVIR DHAMDT.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MULUND MAHAVIR DHAM.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MULUND MAHAVIR DHAM.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MULUND MAHAVIR DHAM.pdf2 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: MMD Mar'23 Form2A-compressed.pdf2 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form-5_FY22-23_Mahavir Dham.pdf2 Mar 2024
Certificates of CA (Form 3)File: Form 3 MMD 31-12-2022.pdf23 May 2023
Commencement Certificates / NA Order for plotted developmentFile: fullCCMMD15122021.pdf25 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 2020 MMD.pdf25 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 2021 MMD.pdf25 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2022 MMD.pdf25 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMDForm230092022.pdf31 Mar 2023
Certificates of CA (Form 3)File: Form3MMD30092022.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Mulund Mahavirdham (2018-19).pdf30 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 Mulund Mahavirdham Soc.pdf30 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 For annual report of CA - MMD - Final (Fy-2020-21).pdf30 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J5149 C12 LS CERT MULUND MAHAVIR DHAM DT 30 09 22_DSC.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MAHARERA FORM 5 For annual report of CA - MMD - Final.pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory MMD.pdf29 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MMD - J5149 C11 LS Certificate DT 31 03 2022 Form 1.pdf16 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MMD Mar22 Form2.pdf16 Jul 2022
Certificates of CA (Form 3)File: Mahavirdham 31 03 22 From 3.pdf16 Jul 2022
Details of encumbrancesFile: MMD RERA ENCUMBRANCES DECLARATON.pdf29 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 MMD.pdf9 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 MMD.pdf9 Mar 2021
Certificates of CA (Form 3)File: Form 3 MMD.pdf9 Mar 2021
Certificates of CA (Form 3)File: Form 3.pdf14 Dec 2019
Certificates of CA (Form 5)File: Form 5 Mulund Mahavirdham (2018-19).pdf6 Dec 2019
Certificates of CA (Form 5)File: Mulund Mahavirdham CHS.pdf26 Oct 2018
Details of encumbrancesFile: no encumbrances MD.pdf29 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
OM SAKTHIVALJI LADDHA ROAD MULUND WEST MUMBAI-40008031CompletedNov 2015Late, Dec 2019

How this compares with Mumbai Suburban

70%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 69 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI6,700+ in Mumbai Suburban

2 kmMULUND MAHAVIRDHAM CO. OCompleted 96Lapsed / revoked 72Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: MAVERICK REALTORS

MAVERICK REALTORS has 9 registrations on MahaRERA, including NEELKANTH TIRTH CO. OP. HOUSING SOC. LTD. and MAVERICK MOOLDEEP. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD. is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.?

The registered promoter entity is MAVERICK REALTORS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.?

The professionals named in the filing: Architect: V. S. VAIDYA & ASSOCIATES; Engineer: GAUTAM CHANDE; Engineer: Pravin Pitale Corporate Engineers; Engineer: Kunwarji Raghavji Ratnani; Chartered Accountant: S K RAMBHIA & ASSOCIATES; Chartered Accountant: Sachin Sunil and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.