Registered No litigation declared Residential / Group Housing project

Mulund Laxmi Narayan CHSL

By Bhushan Anant Vichare

RG-MH-18136 · RERA P51800077435 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 27%
13 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Mulund Laxmi Narayan CHSL is a Residential / Group Housing project by Bhushan Anant Vichare in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077435 on 16 Aug 2024. Possession is promised by 31 Mar 2027. 0 of the 13 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMulund Laxmi Narayan CHSL
  • TypeResidential / Group Housing
  • Location
    • R H B Road
    • Mulund West
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077435
  • ReraGenie IDRG-MH-18136

Builder

  • NameBhushan Anant Vichare
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

0%0 of 13 units booked
17.7%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mulund Laxmi Narayan CHSLNA8713013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 27%.

Mulund Laxmi Narayan CHSL: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area836 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025
LandownerVillageDistrict
Mulund Laxmi Narayan Co-Operative Housing SocieGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2478.8
Proposed, not sanctioned1,117 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKrishna Tower Sector 5 Charkop Kandivali West Mumbai 400067
Estimated costRs 9.22 cr
Cost incurredRs 1.63 cr
Work done17.69%
BuildingWingEstimatedIncurred
Mulund Laxmi Narayan CHSLNARs 9.22 crRs 1.63 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkit U Jain
EngineerKirtikumar H Shah
Chartered AccountantVishwas R Mhaske
Chartered AccountantR H POTHIWAL & ASSOCIATES
PartnerRole in project
Bhushan Anant Vichare-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2_Dec 25.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2_Dec 25.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1-Sep-25.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2-Sep-25.pdf31 Oct 2025
Withdrawal Update Form 3File: Form 3 Sep-25.pdf31 Oct 2025
Form 1File: Form 1_Sep 24.pdf25 Aug 2025
Form 2File: Form 2_Sep 24.pdf25 Aug 2025
Form 3File: CA Certificate_Sept 24.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Sep 24.pdf25 Aug 2025
Form 1File: Form 1_Dec 24.pdf25 Aug 2025
Form 2File: Form 2_Dec 24.pdf25 Aug 2025
Form 3File: CA Certificate_Dec 24.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Dec 24.pdf25 Aug 2025
Form 1File: Form 1_March 25.pdf25 Aug 2025
Form 2File: Form 2_March 25.pdf25 Aug 2025
Form 3File: Form 3_March 25.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_March 25.pdf25 Aug 2025
Withdrawal Update Form 1File: Architect Certificate-June-25.pdf25 Aug 2025
Withdrawal Update Form 1File: Architect Certificate-June-25.pdf25 Aug 2025
Withdrawal Update Form 1File: Architect Certificate-June-25.pdf25 Aug 2025
Withdrawal Update Form 2File: Engineer Certificated-June-25.pdf25 Aug 2025
Withdrawal Update Form 2File: Engineer Certificated-June-25.pdf25 Aug 2025
Withdrawal Update Form 2File: Engineer Certificated-June-25.pdf25 Aug 2025
Withdrawal Update Form 3File: CA Certificate June-25.pdf25 Aug 2025
Withdrawal Update Form 3File: CA Certificate June-25.pdf25 Aug 2025
Withdrawal Update Form 3File: CA Certificate June-25.pdf25 Aug 2025
Disclosure of sold/ booked inventoryFile: Disclosure_March 25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 25.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_March 25.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 25.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sept 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sep 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Sep 24.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Dec 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VE - Form 3 -020824.pdf12 Aug 2024
Proforma of Allotment letterFile: Allotment Letter .pdf12 Aug 2024
Copy of the legal title reportFile: Legal title report_1 (3 files merged).pdf5 Aug 2024
Copy of the legal title reportFile: TITLE REPORT.pdf5 Aug 2024
CERSAI detailsFile: Declaration nil cersai report .pdf5 Aug 2024
Proforma of Agreement for saleFile: AFS_Final.pdf5 Aug 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf5 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS.pdf5 Aug 2024
Other - TechnicalFile: Declaration of plot one registration .pdf5 Aug 2024
Details of encumbrances concerned to FinanceFile: VE - Encumberance Certificate.pdf20 Jul 2024
Details of encumbrances concerned to LegalFile: VE - Encumberance Certificate.pdf20 Jul 2024
Layout approvalFile: VE - Sanction Layout.pdf22 May 2024
Building plan approvalFile: VE - Sanction Layout.pdf22 May 2024
Copy of Layout Approval (in case of layout)File: VE - Sanction Layout.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: VE - Sanction Layout.pdf22 May 2024
Details of encumbrances concerned to FinanceFile: VE Encumbrance Certificate.pdf18 May 2024
Details of encumbrances concerned to LegalFile: VE Encumbrance Certificate.pdf18 May 2024
Declaration in FORM BFile: Form B.pdf18 May 2024
Declaration about Commencement CertificateFile: Declaration for CC.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate.pdf24 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Entity.pdf24 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration - Bank.pdf24 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: laxmi Architect Certificate Form 1.pdf13 Apr 2024
PAN CardFile: Pan card.pdf11 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Beacon CHSLPlot no 18B Survey No 33 CTS 290A Lourdes Colony Marve Road Malad west1CompletedJun 2018Late, Oct 2020

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mulund Laxmi Narayan CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmMulund Laxmi Narayan CHSCompleted 114Lapsed / revoked 98Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 356 registered projects within 2 km.

Builder: Bhushan Anant Vichare

BHUSHAN ANANT VICHARE has 2 registrations on MahaRERA, including BEACON CHSL and Mulund Laxmi Narayan CHSL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Mulund Laxmi Narayan CHSL is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mulund Laxmi Narayan CHSL?

The registered promoter entity is Bhushan Anant Vichare, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mulund Laxmi Narayan CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mulund Laxmi Narayan CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mulund Laxmi Narayan CHSL?

The professionals named in the filing: Architect: Ankit U Jain; Engineer: Kirtikumar H Shah; Chartered Accountant: Vishwas R Mhaske; Chartered Accountant: R H POTHIWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mulund Laxmi Narayan CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mulund Laxmi Narayan CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mulund Laxmi Narayan CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.