Home / Browse projects / Mumbai Suburban, Maharashtra / MULUND GIRIRAJ CHSL

Registration lapsed No litigation declared Residential / Group Housing project

MULUND GIRIRAJ CHSL

By ANON DEVELOPERS

RG-MH-63202 · RERA P51800050695 · Last updated on MahaRERA portal: 2 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Staircases, 90%
31 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

MULUND GIRIRAJ CHSL is a Residential / Group Housing project by ANON DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050695 on 28 Apr 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 5 of the 36 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMULUND GIRIRAJ CHSL
  • TypeResidential / Group Housing
  • Location
    • B.P.CROSS ROAD NO.2 & 3
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050695
  • ReraGenie IDRG-MH-63202

Builder

  • NameANON DEVELOPERS
  • Entity typePartnership
  • PartnersHASMUKH PUNSHI NISHAR, FENIL MANSUKH MOTA
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

10 months past promisethis monthRegisteredApr 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

14%5 of 36 units booked

Figures as on 2 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MULUND GIRIRAJ CHSNA9936036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

MULUND GIRIRAJ CHS: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area860 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2317.27
Proposed, not sanctioned1,966 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 6 AND 7 P E S THANE WEST 400602

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAMJIBHAI POPATBHAI ASUNDARIA
EngineerPRASHANT SANE
Chartered AccountantBIMAL RATHI & CO
Chartered AccountantBIMAL V RATHI
PartnerRole in project
ANON DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Rera Form 1_SIGNED.pdf2 Apr 2026
Form 2File: FORM 2.pdf2 Apr 2026
Form 3File: FORM 3 TILL 31122025.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf2 Apr 2026
Self-declaration of Quarterly ProgressFile: RERA EXTENSION PROJECT COMPLETION LETTER - ANON DEVELOPERS.pdf2 Apr 2026
OthersFile: GIRIRAJ OC CERTIFICATE.pdf2 Apr 2026
Form 1File: Form 1 - Architect certificate.pdf25 Mar 2026
Form 2File: FORM 2.pdf25 Mar 2026
Form 3File: FORM 3 CA CERTIFICATE_compressed.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf25 Mar 2026
Form 1File: GIRIRAJ RERA FORM 1.pdf12 Feb 2026
Form 2File: Form 2 SIGNED.pdf12 Feb 2026
Form 3File: Signed Stamped form3.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf12 Feb 2026
Form 1File: FORM 1-Architect certificate.pdf31 Oct 2025
Form 2File: FORM 2 ENG CERTIFICATE.pdf31 Oct 2025
Form 3File: FORM 3-CA CERTIFICATE.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf31 Oct 2025
Form 1File: FORM 1-Architect certificate.pdf31 Oct 2025
Form 2File: FORM 2 ENG CERTIFICATE.pdf31 Oct 2025
Form 3File: FORM 3-CA CERTIFICATE.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf31 Oct 2025
Form 1File: FORM 1 Q-1.pdf28 Oct 2025
Form 2File: FORM 2 -25-26-Q1.pdf28 Oct 2025
Form 3File: FORM 3-CA CERTIFICATE-GIRIRAJ APRIL'25-JUNE'25_DSC_compressed.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf28 Oct 2025
Form 3File: Signed & Stamped form3.pdf19 Jul 2025
Form 1File: GIRIRAJ RERA FORM 1.pdf19 Jul 2025
Form 2File: Form 2 SIGNED.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf15 Jul 2025
Form 1File: GIRIRAJ FORM 1.pdf19 Jun 2025
Form 2File: GIRIRAJ FORM 2 SIGNED.pdf19 Jun 2025
Form 3File: FORM 3.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold 14062025.pdf19 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GIRIRAJ FORM 2.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GIRIRAJ FORM 1.pdf11 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 2428934_Full FurtherCC_signed-Giriraj.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-30 JUNE 2023.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-30 SEPT 2023.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Architect certificate.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE UPTO 30TH JUNE23.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-CA CERTIFICATE.pdf4 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2379086_FurtherCC_signed-2.pdf2 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-FORM 1-Architect certificate.pdf2 Jan 2024
Other - TechnicalFile: FORM 3.pdf25 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-CA CERTIFICATE.pdf24 Apr 2023
Other - TechnicalFile: DECLRATION FOR AREA BIFURCATION.pdf13 Apr 2023
Other - TechnicalFile: BIFURCATION.pdf13 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Apr 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf18 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: CHANKIT MOTA ANNEXURE A.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: HASMUKH NISAR ANNEXURE A.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: FENIL MOTA ANNEXUTRE A.pdf14 Mar 2023
Details of encumbrances concerned to FinanceFile: Declaration about no legal encumbrances.pdf4 Mar 2023
Details of encumbrances concerned to LegalFile: Declaration about no legal encumbrances.pdf4 Mar 2023
Declaration in FORM BFile: DECLARATION IN FORM B.pdf28 Feb 2023
Copy of the legal title reportFile: Legal Title Report.pdf25 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf25 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf25 Feb 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale-UPLOAD.pdf25 Feb 2023
Building plan approvalFile: Copy of Layout Approval-PAGE 1.pdf22 Feb 2023
Building plan approvalFile: Copy of Layout Approval -PAGE 2.pdf22 Feb 2023
Building plan approvalFile: Copy of Layout Approval-PAGE 3.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Copy of Layout Approval-PAGE 1.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Copy of Layout Approval -PAGE 2.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Copy of Layout Approval-PAGE 3.pdf22 Feb 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf22 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf22 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf22 Feb 2023
CERSAI detailsFile: CERSAI_REPORT GIRIRAJ.pdf4 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account0001.pdf4 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng certificate.pdf30 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2359065_FirstCC_signed.pdf28 Jan 2023
Layout approvalFile: 1-IOD PLAN.pdf12 Dec 2022
Copy of Layout Approval (in case of layout)File: 1-IOD PLAN.pdf12 Dec 2022
PAN CardFile: Anon Developers PAN Card.pdf15 Sep 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ANON SAPPHIREP51800026293MULUND WEST, Mumbai Suburban-Sep 2020CompletedJun 2024Jun 2023
ANON AVENUEP51800026858Mulund (West), Mumbai Suburban-Oct 2020CompletedOct 2023Feb 2023
SHREE GANESH PRASADP51800002888MULUND WEST, Mumbai Suburban-Aug 2017CompletedDec 2021Nov 2018
BRAMHARAJ HERITAGEPLOT NO 54ASECTOR 8A AIROLI NAVI MUMBAI 40060326-CompletedMay 2013Dec 2012

How this compares with Mumbai Suburban

14%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MULUND GIRIRAJ CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmMULUND GIRIRAJ CHSLCompleted 99Lapsed / revoked 72Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 308 registered projects within 2 km.

Builder: ANON DEVELOPERS

ANON DEVELOPERS has 4 registrations on MahaRERA, including SHREE GANESH PRASAD and ANON SAPPHIRE. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that MULUND GIRIRAJ CHSL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MULUND GIRIRAJ CHSL is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MULUND GIRIRAJ CHSL?

The registered promoter entity is ANON DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MULUND GIRIRAJ CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MULUND GIRIRAJ CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MULUND GIRIRAJ CHSL?

The professionals named in the filing: Architect: RAMJIBHAI POPATBHAI ASUNDARIA; Engineer: PRASHANT SANE; Chartered Accountant: BIMAL RATHI & CO; Chartered Accountant: BIMAL V RATHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MULUND GIRIRAJ CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MULUND GIRIRAJ CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MULUND GIRIRAJ CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.