Home / Browse projects / Pune, Maharashtra / MUKUND
MUKUND
By Kotibhaskar Infrastructures &Developers Pvt.Ltd.
RG-MH-80953 · RERA P52100045860 · Last updated on MahaRERA portal: 13 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 27 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MUKUND is a Residential / Group Housing project by Kotibhaskar Infrastructures &Developers Pvt.Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100045860 on 15 Jun 2022. The registration is recorded completed; possession was promised by 31 May 2024.
At a glance
Project
- NameMUKUND
- TypeResidential / Group Housing
- Location
- HINGNE BUDRUK
- MAHARSHI KARVENAGAR
- Karve Nagar
- Haveli
- Pune
- 411052
- Pincode411052
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045860
- ReraGenie IDRG-MH-80953
Builder
- NameKotibhaskar Infrastructures &Developers Pvt.Ltd.
- Entity typeCompany
- CINU45209PN2011PTC140254
- GSTIN27AAQCS2145B1ZG
- Managing DirectorsDilip Shivanand Kotibhaskar, Dilip Shivanand Kotibhaskar, Dilip Shivanand Kotibhaskar, Dilip Shivanand Kotibhaskar
- ChairpersonsChidambar Shivanand kotibhaskar, Chidambar Shivanand kotibhaskar, Chidambar Shivanand kotibhaskar, Chidambar Shivanand kotibhaskar
- Other registrations27 more →
- Completed15 of 28
- No longer live1 lapsed, de-registered or revoked
- Past their filed date2
- Declared earlier projects11 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jun 2022
- Promised completion31 May 2024
- Revised completionNone
- Buildings1 building record
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MUKUND | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
MUKUND: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MUKUND PRABHAKAR KARVE | Karve Nagar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIRUDDHA SHINDE |
| Architect | SHINDE JOSHI AND ASSOCIATES |
| Engineer | SHRIDHAR SHET |
| Engineer | SHRIDHAR - SHET |
| Chartered Accountant | OMKAR CHANDK |
| Chartered Accountant | O.S.CHANDAK & CO. |
| Chartered Accountant | AMIT ANIL SHENDE |
| Partner | Role in project |
|---|---|
| Kotibhaskar Infrastructures &Developers Pvt.Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 May 2024
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mukund Form-5_0001.pdf | 13 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate- Form-2 A-2022-2023.pdf | 24 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate- Form-2 A_2023-2024.pdf | 24 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Mukund- Form 4.pdf | 23 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Mukund Full Completion.pdf | 22 May 2024 |
| Disclosure of sold/ booked inventoryFile: LG-Mukund-SoldUnsold-31042024.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Mukund Form-2-30032024.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mukund Form 3- 30032024.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Mukund Form 1-31032024.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Mukund Sold Unsold_0001.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-Mukund-31122023.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mukund Form 3_0001.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mukund-A_0001.pdf | 10 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LG-Mukund-Form 5-FY-22-23.pdf | 22 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Mukund-Form 1-30092023.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Mukund-Form 2-30092023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Mukund-Sold Unsold Inventory-30092023.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Mukund- Form 3-30092023.pdf | 19 Oct 2023 |
| Declaration about Commencement CertificateFile: LG-Mukund-CC Declaration-30062023.pdf | 26 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Mukund-Form 1-30062023.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Mukund-Form 2-30062023.pdf | 26 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Mukund-Sold Unsold Inventory-30062023.pdf | 26 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Mukund-Form 3-30062023.pdf | 26 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Mukund-Form 1-16052023_0001.pdf | 27 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Mukund-Form 2-16052023_0001.pdf | 27 May 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Mukund-Sold Unsold Inventory_0001.pdf | 27 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Mukund-Form 3-12052023_0001.pdf | 27 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MUKUND FORM 1.pdf | 2 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Mukund-Form2-28012023.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Mukund-Sold Unsold Inventory-28012023.pdf | 31 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Mukund-Form3-28012023.pdf | 31 Jan 2023 |
| Building plan approvalFile: DWG1.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration Mukund.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Declaration Mukund.pdf | 31 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: DWG1.pdf | 31 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC1.pdf | 31 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Account MUKUND.pdf | 31 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MUKUND FORM 1.pdf | 21 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MUKUND FORM 2.pdf | 21 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MUKUND FORM 3.pdf | 21 Dec 2022 |
| PAN CardFile: 5 KIDPL PAN CARD 1.pdf | 9 Jun 2022 |
| Copy of the legal title reportFile: 20220609_14582265.pdf | 9 Jun 2022 |
| Building plan approvalFile: MUKUND DWG1_compressed (1).pdf | 4 Jun 2022 |
| Details of encumbrancesFile: No Encumbrance Declaration.pdf | 4 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MUKUND DWG1_compressed (1).pdf | 4 Jun 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate_0001.pdf | 4 Jun 2022 |
| Declaration in FORM BFile: Form _B (Notarised)_0001.pdf | 4 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MUKUND.pdf | 4 Jun 2022 |
| Proforma of Allotment letterFile: Agreement.pdf | 4 Jun 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 4 Jun 2022 |
| Layout approvalFile: Demarcation -Karve Banglow_compressed.pdf | 2 Jun 2022 |
| Details of encumbrancesFile: No Encumbrance Declaration.pdf | 2 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Demarcation -Karve Banglow_compressed.pdf | 2 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: MUKUND CC111.pdf | 2 Jun 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200238722647_For_Asset_Based_Search_02_06_2022_15_27_21_610.pdf | 2 Jun 2022 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| INDUKIRAN CO-OP HOUSING SOCIETY LIMITEDP52100046237 | KOTHRUD, Pune | 1 | Jun 2022 | Completed | Nov 2025 | Oct 2024 |
| SARITA CHSLP52100034229 | KOTHRUD, Pune | 70 | Mar 2022 | Completed | Oct 2025 | May 2025 |
| Purva HeightsP53100034113 | Warnali, Sangli | 36 | Mar 2022 | Completed | Sep 2025 | Mar 2025 |
| PRABHAKAR CHSLP52100049315 | Pune, Pune | - | Feb 2023 | Completed | Jul 2025 | Apr 2025 |
| Kajal Co operative Housing Society LtdP52100032652 | Kothrud, Pune | 67 | Jan 2022 | Ongoing | Dec 2024 | Not delivered |
| SHUBHASHREEP52100045350 | PUNE, Pune | - | May 2022 | Completed | Mar 2024 | Late, Jun 2024 |
| Annapurna | Hingane Budruk Haveli Pune | 5 | - | Completed | Dec 2017 | Jun 2017 |
| Ankoorshree Co-operative Housing Society | Happy Colony Lane 3 Kothrud Pune | 21 | - | Completed | Oct 2017 | May 2017 |
| Snehvardhan Co-operative Housing Society | Patwardhan Co-operative Housing Society | 20 | - | Completed | May 2017 | Jan 2017 |
| Chinar Co-operative Housing Society | Kothrud Pune | 24 | - | Completed | Mar 2014 | Mar 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 27 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
Keep MUKUND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHARSHI KARVENAGAR13,700+ in Pune
Filed coordinates, straight-line distance. 193 registered projects within 2 km.
LE SKYLARK
KAKADE GREEN ESTATES PRIVATE LIMITED
River Dale Residency
Maha Anand Pinnac Associates
Studio06
KARVENAGAR STUDIO LLP
1 GOLDLEAF
GOLDLEAF REALTORS
G M Mahika
G M DEVELOPERS
SIDDHIVINAYAK RESIDENCY
KELKAR PINNAC HOUSING LLP
Builder: Kotibhaskar Infrastructures &Developers Pvt.Ltd.
Kotibhaskar Infrastructures &Developers Pvt.Ltd. has 28 registrations on MahaRERA, including Sugam Cooperative Housing Society Limited and Vasant Vihar Co-operative Housing Society. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MUKUND is delayed beyond 31 May 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MUKUND?
The registered promoter entity is Kotibhaskar Infrastructures &Developers Pvt.Ltd., a company as per the filing. Its CIN U45209PN2011PTC140254 and GSTIN 27AAQCS2145B1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MUKUND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MUKUND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MUKUND?
The professionals named in the filing: Architect: ANIRUDDHA SHINDE; Architect: SHINDE JOSHI AND ASSOCIATES; Engineer: SHRIDHAR SHET; Engineer: SHRIDHAR - SHET; Chartered Accountant: OMKAR CHANDK; Chartered Accountant: O.S.CHANDAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MUKUND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback