Home / Browse projects / Pune, Maharashtra / INDUKIRAN CO-OP HOUSING SOCIETY LIMITED
INDUKIRAN CO-OP HOUSING SOCIETY LIMITED
By Kotibhaskar Infrastructures &Developers Pvt.Ltd.
RG-MH-96164 · RERA P52100046237 · Last updated on MahaRERA portal: 13 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 27 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INDUKIRAN CO-OP HOUSING SOCIETY LIMITED is a Residential / Group Housing project by Kotibhaskar Infrastructures &Developers Pvt.Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100046237 on 20 Jun 2022. The registration is recorded completed; possession was promised by 18 Nov 2025. 0 of the 1 unit on this registration is recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameINDUKIRAN CO-OP HOUSING SOCIETY LIMITED
- TypeResidential / Group Housing
- Location
- IDIAL COLONY
- KOTHRUD
- Pune (M Corp.)
- Pune City
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046237
- ReraGenie IDRG-MH-96164
Builder
- NameKotibhaskar Infrastructures &Developers Pvt.Ltd.
- Entity typeCompany
- CINU45209PN2011PTC140254
- GSTIN27AAQCS2145B1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsDilip Shivanand Kotibhaskar, Dilip Shivanand Kotibhaskar, Dilip Shivanand Kotibhaskar, Dilip Shivanand Kotibhaskar
- ChairpersonsChidambar Shivanand kotibhaskar, Chidambar Shivanand kotibhaskar, Chidambar Shivanand kotibhaskar, Chidambar Shivanand kotibhaskar
- Other registrations27 more →
- Completed15 of 28
- No longer live1 lapsed, de-registered or revoked
- Past their filed date2
- Declared earlier projects11 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on20 Jun 2022
- Promised completion18 Nov 2025
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Current status
Figures as on 13 Dec 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| INDUKIRAN COOPERATIVE HOUSING SOCIETY LTD | NA | 11 | 11 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
INDUKIRAN COOPERATIVE HOUSING SOCIETY LTD: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| KOTIBHASKAR INFRASTRUCTURES AND DEVELOPERS PVT LTD | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIRUDDHE SHINDE |
| Architect | SHINDE JOSHI AND ASSOCIATES |
| Engineer | Shridhar M Shet |
| Engineer | SHRIDHAR - SHET |
| Chartered Accountant | OMKAR CHANDAK |
| Chartered Accountant | O.S.CHANDAK & CO. |
| Chartered Accountant | AMIT ANIL SHENDE |
| Partner | Role in project |
|---|---|
| Kotibhaskar Infrastructures &Developers Pvt.Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Nov 2024
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Indukiran- Form- 5_0001.pdf | 13 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Indukiran Form-4-26102024.pdf | 13 Nov 2024 |
| Building plan approvalFile: Scan 2024-10-8 (3,9,17)_1_11zon.pdf | 12 Nov 2024 |
| Building plan approvalFile: Scan 2024-10-8 (3,10,16)_2_11zon.pdf | 12 Nov 2024 |
| Building plan approvalFile: Scan 2024-10-8 (3,11,16)_3_11zon.pdf | 12 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC0961-24-11072024.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2024-10-8 (3,9,17)_1_11zon.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2024-10-8 (3,10,16)_2_11zon.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2024-10-8 (3,11,16)_3_11zon.pdf | 12 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Indukiran-Full OC-14102024.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indukiran Form-3-301022024.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Indukiran Form-2-30092024.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Indukiran- Sold-Unsold Inventory_0001.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Indukiran Form 1-30092024.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: LG-Indukiran- Unsold Inventory-30062024 (1).pdf | 6 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran-Form 2-30062024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Indukiran-Form 3-30062024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Indukiran Form-1_0001.pdf | 12 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: LG-Unsold Inventory- Indukiran-31032024.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran Form-2-30032024.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indukiran-Form 3-28032024_compressed.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG_Indukiran Form 1-31032024.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Indukiran Sold Unsold_0001.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran- Form 2-31112023.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Indukiran- Form 3-31112023.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Indukiran CHSL-A_0001.pdf | 10 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LG-Indukiran-Form 5-FY-22-23.pdf | 22 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran-Form 2-Engineer-05102023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Indukiran-Sold Unsold Inventory-05102023.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Indukiran- Form 3-05102023.pdf | 19 Oct 2023 |
| Declaration about Commencement CertificateFile: LG-Indukiran-CC Declaration-30062023.pdf | 29 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Indukiran-Sold Unsold Inventory-11072023.pdf | 29 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Indukiran-Form 1-11072023.pdf | 18 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran-Form 2-11072023.pdf | 18 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Indukiran-Form 3-11072023.pdf | 18 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Mukund-Form 1-16052023_0001.pdf | 27 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Mukund-Form 2-16052023_0001.pdf | 27 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Mukund-Form 3-12052023_0001.pdf | 27 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LG-Indukiran-Form1-15032023.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran-Form2-27032023.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Indukiran-Sold Unsold Inventory-31032023.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Indukiran-Form3-27032023.pdf | 19 Apr 2023 |
| Building plan approvalFile: Indukiran-Sanction Plan 1-30122022-1624_compressed.pdf | 31 Jan 2023 |
| Building plan approvalFile: Indukiran-Sanction Plan 2-30122022-1624_compressed.pdf | 31 Jan 2023 |
| Building plan approvalFile: Indukiran-Sanction Plan 3-30122022-1624_compressed.pdf | 31 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Indukiran-Sanction Plan 1-30122022-1624_compressed.pdf | 31 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Indukiran-Sanction Plan 2-30122022-1624_compressed.pdf | 31 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Indukiran-Sanction Plan 3-30122022-1624_compressed.pdf | 31 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Indukiran-Commencement Certificate-30122022-1624.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LG-Indukiran-Form2-28012023.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: LG-Indukiran-Sold Unsold Inventory-28012023.pdf | 31 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LG-Indukiran-Form3-28012023.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Indukiran Form 1.pdf | 7 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Indukiran Form 2.pdf | 7 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indukiran Form 3.pdf | 7 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Indukiran.pdf | 16 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indukiran Form 3.pdf | 16 Aug 2022 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 15 Jun 2022 |
| PAN CardFile: 5 KIDPL PAN CARD 1.pdf | 6 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: INDUKIRAN FORM 3.pdf | 6 Jun 2022 |
| Building plan approvalFile: INDUKIRAN SANCTION PLAN 1.pdf | 26 May 2022 |
| Building plan approvalFile: INDUKIRAN SANCTION PLAN.pdf | 26 May 2022 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 26 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: INDUKIRAN SANCTION PLAN 1.pdf | 26 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: INDUKIRAN SANCTION PLAN.pdf | 26 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: INDUKIRAN COMMENCEMENT.pdf | 26 May 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC_0001.pdf | 26 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200238228770_For_Asset_Based_Search_26_05_2022_16_06_24_434.pdf | 26 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 26 May 2022 |
| Proforma of Allotment letterFile: AGREEMENT - INDUKIRAN.pdf | 26 May 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 26 May 2022 |
| Layout approvalFile: NO LAYOUT DECLARATION.pdf | 23 May 2022 |
| Details of encumbrancesFile: NO ENCUMBRANCE DECLARATION.pdf | 23 May 2022 |
| Copy of Layout Approval (in case of layout)File: NO LAYOUT DECLARATION.pdf | 23 May 2022 |
| Declaration in FORM BFile: FORM B.pdf | 23 May 2022 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SARITA CHSLP52100034229 | KOTHRUD, Pune | 70 | Mar 2022 | Completed | Oct 2025 | May 2025 |
| Purva HeightsP53100034113 | Warnali, Sangli | 36 | Mar 2022 | Completed | Sep 2025 | Mar 2025 |
| PRABHAKAR CHSLP52100049315 | Pune, Pune | - | Feb 2023 | Completed | Jul 2025 | Apr 2025 |
| Kajal Co operative Housing Society LtdP52100032652 | Kothrud, Pune | 67 | Jan 2022 | Ongoing | Dec 2024 | Not delivered |
| MUKUNDP52100045860 | MAHARSHI KARVENAGAR, Pune | - | Jun 2022 | Completed | May 2024 | Late, Jun 2024 |
| SHUBHASHREEP52100045350 | PUNE, Pune | - | May 2022 | Completed | Mar 2024 | Late, Jun 2024 |
| Annapurna | Hingane Budruk Haveli Pune | 5 | - | Completed | Dec 2017 | Jun 2017 |
| Ankoorshree Co-operative Housing Society | Happy Colony Lane 3 Kothrud Pune | 21 | - | Completed | Oct 2017 | May 2017 |
| Snehvardhan Co-operative Housing Society | Patwardhan Co-operative Housing Society | 20 | - | Completed | May 2017 | Jan 2017 |
| Chinar Co-operative Housing Society | Kothrud Pune | 24 | - | Completed | Mar 2014 | Mar 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 27 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep INDUKIRAN CO-OP HOUSING SOCIETY LIMITED on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOTHRUD13,700+ in Pune
Filed coordinates, straight-line distance. 303 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: Kotibhaskar Infrastructures &Developers Pvt.Ltd.
Kotibhaskar Infrastructures &Developers Pvt.Ltd. has 28 registrations on MahaRERA, including Sugam Cooperative Housing Society Limited and Vasant Vihar Co-operative Housing Society. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if INDUKIRAN CO-OP HOUSING SOCIETY LIMITED is delayed beyond 18 Nov 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INDUKIRAN CO-OP HOUSING SOCIETY LIMITED?
The registered promoter entity is Kotibhaskar Infrastructures &Developers Pvt.Ltd., a company as per the filing. Its CIN U45209PN2011PTC140254 and GSTIN 27AAQCS2145B1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INDUKIRAN CO-OP HOUSING SOCIETY LIMITED?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INDUKIRAN CO-OP HOUSING SOCIETY LIMITED?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INDUKIRAN CO-OP HOUSING SOCIETY LIMITED?
The professionals named in the filing: Architect: ANIRUDDHE SHINDE; Architect: SHINDE JOSHI AND ASSOCIATES; Engineer: Shridhar M Shet; Engineer: SHRIDHAR - SHET; Chartered Accountant: OMKAR CHANDAK; Chartered Accountant: O.S.CHANDAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INDUKIRAN CO-OP HOUSING SOCIETY LIMITED?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback