Home / Browse projects / MOUNTAIN VIEW

Registered No litigation declared Others project

MOUNTAIN VIEW

By SUDHAKAR DADSAHEB BHOSALE

RG-MH-52449 · RERA P52100055748 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2029Possession promisedmoved 23 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 25%
49 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

MOUNTAIN VIEW is a Others project by SUDHAKAR DADSAHEB BHOSALE in DIGHI PUNE, 411015, registered with MahaRERA as P52100055748 on 16 Apr 2024. Possession is promised by 31 Dec 2029. The completion date has moved by 23 months from the original filing. 9 of the 58 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameMOUNTAIN VIEW
  • TypeOthers
  • Location
    • ALANDI ROAD
    • DIGHI PUNE
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055748
  • ReraGenie IDRG-MH-52449

Builder

  • NameSUDHAKAR DADSAHEB BHOSALE
  • Entity typeIndividual
  • GSTIN27AMMPB3648M3ZM
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024First promiseJan 2028Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Jan 2028)
  • Buildings1 building record
  • Documents filed79 files

Current status

16%9 of 58 units booked
25.1%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MOUNTAIN VIEWNA77382058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 25%.

MOUNTAIN VIEW: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered55
Open Space133

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
SAVITA SANJAY CHAVAN-Pune
BHUMIKA SANJAY CHAVAN-Pune
HEMA SHARAD CHAUREPune (M Corp.)Pune
KSHAMA NIVRUTTI CHAVAN-Pune
INDUBAI NIVRUTTI CHAVAN-Pune
VIJAY NIVRUTTI CHAVANPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI8108.38
Proposed, not sanctioned3,792 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalbhor Corporate, Tulaji Vasti, Near Forse Motors, Akurdi, Pune - 411035
Estimated costRs 11.69 cr
Cost incurredRs 2.93 cr
Work done25.05%
BuildingWingEstimatedIncurred
MOUNTAIN VIEWNARs 11.11 crRs 2.93 cr
-NARs 58.47 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAashoke Pawar Architect & Engineers
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantCA Rutuja Narsingh & Associates
PartnerRole in project
SUDHAKAR DADSAHEB BHOSALE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23072621849Jan 2028 → Dec 2029

Reason as filed by the promoterWe, Sudhakar Dadsaheb Bhosale, the promoter of the project Mountain View (Registration No. P52100055748) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project. The delay occurred primarily due to difficulties in carrying out excavation work, as the project plot is situated within a densely populated residential area with small households surrounding the site. Owing to the proximity of these residential structures, blasting could not be undertaken for safety reasons. Consequently, the exc

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf3 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 FY 2025-26.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf23 Jul 2026
Withdrawal Update Form 1File: Arc Certificate.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2 June 2024.pdf23 Jul 2026
Withdrawal Update Form 2File: Engineering Certificate 30-06-2026.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 3 June 2024.pdf23 Jul 2026
Withdrawal Update Form 3File: CA certificate (1)_compressed.pdf23 Jul 2026
Form 2A (FY 2024-2025)File: Quality Assurance Certificate 01-For the ending 2024-25.pdf23 Jul 2026
Form 2A (FY 2025-2026)File: Quality Assurance Certificate 02-2025-2026.pdf23 Jul 2026
Form 1File: Form 1 - Mountain View as on June 2026.pdf14 Jul 2026
Form 2File: Form 2 - Mountain View as on June 2026.pdf14 Jul 2026
Form 3File: Form 3 - Mountain View as on June 2026.pdf14 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain View as on June 2026.pdf14 Jul 2026
Form 1File: Form 1 - Mountain View as on March 2026.pdf16 Apr 2026
Form 2File: Form 2 - Mountain View - 31-03-2026.pdf16 Apr 2026
Form 3File: Form 3 Mountain View as on 31-03-2026.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain View as on 31st March 2026.pdf16 Apr 2026
Form 1File: Form 1 - Mountain View as on Dec 2025.pdf16 Jan 2026
Form 2File: Form 2 - Mountain View as on Dec 2025.pdf16 Jan 2026
Form 3File: Form 3 - Mountain View as on Dec 2025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain View as on Dec 2025.pdf16 Jan 2026
Form 1File: Form 1 - Mountain View as on Sep 2025.pdf18 Oct 2025
Form 2File: Form 2 - Mountain View as on Sep 2025.pdf18 Oct 2025
Form 3File: Form 3 - Mountain View as on Sep 2025.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain View as on Sep 2025.pdf18 Oct 2025
Form 1File: Form 1 - Mountain View as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Mountain View as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 Mountain View as on 30-06-2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mountain View as on June 2025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mountain View as on March 2025.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain View as on March 2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain View as on March 2025.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mountain View as on 31-12-2024.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mountain View as on December 2024.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mountain View as on December 2024.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Circular 29 (4).pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024_11zon (2).pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 June 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Mail.pdf9 Mar 2024
Other - TechnicalFile: CC Verification Mail.pdf9 Mar 2024
Other - TechnicalFile: Annexure A - Order No 50.pdf9 Mar 2024
CERSAI detailsFile: CERSAI details.pdf24 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf24 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation - Allotment.pdf24 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf24 Dec 2023
Layout approvalFile: plan1.pdf23 Dec 2023
Building plan approvalFile: plan1.pdf23 Dec 2023
Building plan approvalFile: plan2.pdf23 Dec 2023
Building plan approvalFile: plan3.pdf23 Dec 2023
Building plan approvalFile: plan4.pdf23 Dec 2023
Building plan approvalFile: plan5.pdf23 Dec 2023
Building plan approvalFile: plan6.pdf23 Dec 2023
PAN CardFile: PAN CARD SUDHAKAR BHOSALE.pdf23 Dec 2023
Copy of the legal title reportFile: Search report rera 1.pdf23 Dec 2023
Details of encumbrances concerned to FinanceFile: NO LITIGATION LETTER.pdf23 Dec 2023
Details of encumbrances concerned to LegalFile: NO LITIGATION LETTER.pdf23 Dec 2023
Copy of Layout Approval (in case of layout)File: plan1.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan1.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan2.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan3.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan4.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan5.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan6.pdf23 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC RERA 1.pdf23 Dec 2023
Declaration about Commencement CertificateFile: COMM CERT ANNX D.pdf23 Dec 2023
Declaration in FORM BFile: AFFIDAVIT B.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT RERA 1.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT 22-12-23.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 - 08-04-24_11zon.pdf23 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OTHER RERA 1.pdf23 Dec 2023
Proforma of Agreement for saleFile: AFS_Mountain View_Aditya Developers_06032024.pdf23 Dec 2023
Proforma of Allotment letterFile: Allotment_Mountain View_Aditya Developers_06032024.pdf23 Dec 2023
Other - LegalFile: N A ORDER RERA 1.pdf23 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI CHANDRA RESIDENCYS NO 18 DIGHI PUNE 41101520CompletedJun 2022Dec 2021

Keep MOUNTAIN VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIGHI PUNE

2 kmMOUNTAIN VIEWCompleted 23Lapsed / revoked 13Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: SUDHAKAR DADSAHEB BHOSALE

SUDHAKAR DADSAHEB BHOSALE has 1 registration on MahaRERA, including MOUNTAIN VIEW. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if MOUNTAIN VIEW is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOUNTAIN VIEW?

The registered promoter entity is SUDHAKAR DADSAHEB BHOSALE, an individual as per the filing. Its GSTIN 27AMMPB3648M3ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOUNTAIN VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOUNTAIN VIEW?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOUNTAIN VIEW?

The professionals named in the filing: Architect: Aashoke Pawar Architect & Engineers; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: CA Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOUNTAIN VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOUNTAIN VIEW. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOUNTAIN VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.