Home / Browse projects / Pune, Maharashtra / MOUNT BRISA PHASE II

Registered No litigation declared Others project

MOUNT BRISA PHASE II

By SIDDHANT REALTIES

RG-MH-37775 · RERA P52100018901 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 60 months from the original
16 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 90%
145 of 187Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

MOUNT BRISA PHASE II is a Others project by SIDDHANT REALTIES in Pune, Maharashtra, registered with MahaRERA as P52100018901 on 11 Dec 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 60 months from the original filing. 42 of the 187 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete.

At a glance

Project

  • NameMOUNT BRISA PHASE II
  • TypeOthers
  • Location
    • YAWALEWADI KONDHVA RAOD
    • KAMTHE WASTI
    • YAWALEWADI
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • RERA no.P52100018901
  • ReraGenie IDRG-MH-37775

Builder

  • NameSIDDHANT REALTIES
  • Entity typePartnership
  • PartnersSUNIL SOPAN POKALE, URMILA TULSHIRAM KALBHOR, SANDEEP DATTATRAY KHEDEKAR
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2018First promiseDec 2023Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2023)
  • Buildings3 building records
  • Documents filed93 files

Current status

22%42 of 187 units booked

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA311489157
C BUNGLOWNA22202
D WINGNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 90%.

B WING63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor90%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C BUNGLOW33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes80%
Street LightingYes40%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,311 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024
LandownerVillageDistrict
RAMCHANDRA PANDURANG KAMTHEYAWALEWADIPune
PANDURANG SOPAN KAMTHEYAWALEWADIPune
MADHUKAR LAXMAN KAMTHEYAWALEWADIPune
SANTOSH HIRAMAN KAMTHEYAWALEWADIPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI6445.45
Proposed, not sanctioned1,664 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATE BANK OF INDIA IF BRANCH PIMPARI PUNE NEAR HOTEL KALASAGAR PIMPARI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerYUVRAJ VITTHAL SONAR
Chartered AccountantJOSHI & RAYKAR CHARTERED ACCOUNTANTS
Chartered AccountantMS JOSHI AND ASSOCIATES
Chartered AccountantAghav Wavhal & Associates
PartnerRole in project
SIDDHANT REALTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018945Dec 2023 → Dec 2028

Reason as filed by the promoterProposed Extended Date of Completion 31/12/2028

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Phase 2-Final.pdf15 Apr 2026
Form 2File: Form2 Phase 2.pdf15 Apr 2026
Form 3File: Form 3 Phase 2.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Phase-2.pdf15 Apr 2026
Form 1File: Form-1.pdf18 Jul 2025
Form 2File: Form-2 P-2.pdf18 Jul 2025
Form 3File: Form-3 phase-2.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold -P2.pdf18 Jul 2025
Certificates of CA (Form 3)File: form 3 phase 2.pdf27 Jun 2025
Certificates of CA (Form 3)File: FROM 3 SIDDHANT REALTIES MARCH 25 PHASE 2 P52100018901.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC PHASE 2.pdf13 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG PHASE 2.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD PHASE 2.pdf13 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 (phase-2)31Dec24.pdf16 Jan 2025
Certificates of CA (Form 3)File: CA.pdf16 Jan 2025
Certificates of CA (Form 3)File: CA.pdf15 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf15 Jan 2025
Certificates of CA (Form 3)File: CA.pdf5 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC.pdf25 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf25 Oct 2024
Certificates of CA (Form 3)File: Siddhant Realities Phase 2 Form 3 Phase 2 31-3-24.pdf13 Aug 2024
Certificates of CA (Form 3)File: Siddhant realties, form-3,phase-2 30-6-24.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Siddhant Realities Form 5 Phase1-2, 1-4-23 to 31-3-24.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 2 form 1 30624.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: siddhant realties phase2 form2.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: phase-2 form2A.pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase II 31-3-24_compressed.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2.pdf20 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BRISSA 2 BNANK.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: NEW SOLD UNSOLD.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -30-6-22_page-0001 (1).pdf14 Mar 2024
Certificates of CA (Form 3)File: Form3 Phase2 31-12-2023_page-0001.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: sold bookes inventry.pdf7 Mar 2024
Certificates of CA (Form 3)File: Form3 Phase2 31-12-2023 page-0001.pdf6 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -31-3-23.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Phase2 2A 31-03-2022_page-0001.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase2 2A 31092022.pdf27 Feb 2024
Certificates of CA (Form 3)File: form 3 -31092023 phase 2.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory B Wing.pdf19 Feb 2024
Declaration in FORM BFile: form B Phase II.pdf3 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-23 170 (1).pdf3 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Siddhant Realities 1-4-22 to 31-3-23.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory D Wing.pdf27 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-3-2021.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-6-2021.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-9-2021.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-12-2021.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-3-2022_page-0001 (2).pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-6-2022_page-0001.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-9-2022_page-0001.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-12-2022_page-0001.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-9-2023_page-0001.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2 - 31-3-2023_page-0001 (1).pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -30-6-22.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -30-9-22.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -31-12-22.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -30-6-23.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -30-9-23.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase 2 -31-12-23.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 2- 30-6-22.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 2- 30-9-22.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 2- 31 -12-22.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 2- 30-6-23.pdf20 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ANNEXURE A phase -2.pdf27 Oct 2023
CERSAI detailsFile: Cersai.pdf14 Oct 2023
Certificates of CA (Form 3)File: Form 3 phase 2.pdf14 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Realties Disclosure of Interest in Other Real Estate Organizations.pdf14 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2022-23.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate - Phase II.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf7 Dec 2022
Details of encumbrancesFile: 9 Cr Index.pdf31 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Form 5 phase II.pdf31 Mar 2022
Declaration about Commencement CertificateFile: CC Declaration R.pdf20 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance 19-20 B.pdf20 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance 20-21 B.pdf20 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Phase 2.pdf14 Dec 2020
Annual Audit Report of Statutory CA (Form 5)File: Form 5.pdf30 Sep 2019
Annual Audit Report of Statutory CA (Form 5)File: FORM5.pdf30 Sep 2019

How this compares with Pune

22%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MOUNT BRISA PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMTHE WASTI13,700+ in Pune

Builder: SIDDHANT REALTIES

SIDDHANT REALTIES has 2 registrations on MahaRERA, including MOUNT BRISA - PHASE I and MOUNT BRISA PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MOUNT BRISA PHASE II is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOUNT BRISA PHASE II?

The registered promoter entity is SIDDHANT REALTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOUNT BRISA PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOUNT BRISA PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOUNT BRISA PHASE II?

The professionals named in the filing: Engineer: YUVRAJ VITTHAL SONAR; Chartered Accountant: JOSHI & RAYKAR CHARTERED ACCOUNTANTS; Chartered Accountant: MS JOSHI AND ASSOCIATES; Chartered Accountant: Aghav Wavhal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOUNT BRISA PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOUNT BRISA PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOUNT BRISA PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.