RG-MH-25174 · RERA P52100013259 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 72 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 72%
82 of 138Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

MOUNT BRISA - PHASE I is a Others project by SIDDHANT REALTIES in Pune, Maharashtra, registered with MahaRERA as P52100013259 on 21 Sep 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 72 months from the original filing. 56 of the 138 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMOUNT BRISA - PHASE I
  • TypeOthers
  • Location
    • KONDHVA-YAWALEWADI
    • kAMTHE WASTI
    • YAWALEWADI
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013259
  • ReraGenie IDRG-MH-25174

Builder

  • NameSIDDHANT REALTIES
  • Entity typePartnership
  • PartnersSUNIL SOPAN POKALE, URMILA TULSHIRAM KALBHOR, SANDEEP DATTATRAY KHEDEKAR
  • PartnerSUNIL SOPAN POKALE
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2017First promiseDec 2022Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Sep 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed140 files

Current status

41%56 of 138 units booked

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA171712018138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 72%.

A WING: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure72%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises72%
Sanitary Fittings within the flats / premises72%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.72%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered61

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,178 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024
LandownerVillageDistrict
PANDURANG SOPAN KAMTHEYAWALEWADIPune
MADHUKAR LAXMAN KAMTHEYAWALEWADIPune
RAMCHANDRA LAXMAN KAMTHEYAWALEWADIPune
SANTOSH HIRAMAN KAMTHEYAWALEWADIPune
RANJANA NANA PATHAREURULI DEVACHIPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI9073.91
Proposed, not sanctioned4,243 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATE BANK OF INDIA IF BRANCH PIMPARI PUNE NEAR HOTEL KALASAGAR

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL KSHIRSAGAR
EngineerYUVRAJ VITTHAL SONAR
Chartered AccountantJOSHI & RAYKAR CHARTERED ACCOUNTANTS
Chartered AccountantMS JOSHI AND ASSOCIATES
Chartered AccountantAghav Wavhal & Associates
PartnerRole in project
SIDDHANT REALTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018941Dec 2022 → Dec 2028

Reason as filed by the promoterProposed Extended Date of Completion 31/12/2028

EXT52100014018Dec 2022 → Dec 2023

Reason as filed by the promoterThe Project “Mount Brisa” Phase I has been almost completed. And part completion certificates up to 9th floor is also obtained vide certificate No. OCC/1068/21 dated 01/02/2022. In this “Mount Brisa” Phase I project work up to 10th floor is also completed but proposed 11th to 15th floor sanction process is going on. When we got that sanction, then PMC give us 10th floor completion. Then Phase I RERA is total completed. So, we want to some extension period.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2022

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q2 FY 2025-26.pdf15 Apr 2026
Form 2File: Form 2 Q2 FY 2025-26.pdf15 Apr 2026
Form 3File: Form 3 Q2 FY 2025-26.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2 FY 2025-26.pdf15 Apr 2026
Form 1File: Form 1_compressed.pdf15 Apr 2026
Form 2File: Form-2 Corrected Phase 1.pdf15 Apr 2026
Form 3File: Form 3 Phase 1-Final.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Phase-1.pdf15 Apr 2026
Form 1File: ARCHITECTS CERTIFICATE FROM 1 SIDDHANT REALTIES 2025.pdf18 Jul 2025
Form 2File: Form-2 P-1.pdf18 Jul 2025
Form 3File: Form -3 Phase -1_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold -P1.pdf18 Jul 2025
Certificates of CA (Form 3)File: Annexture D Form 3 Phase-1.pdf21 Jun 2025
Certificates of CA (Form 3)File: FORM3 PHASE1.pdf21 Jun 2025
Certificates of CA (Form 5)File: Form 5- Siddhant Realities 1-4-22 to 31-3-23.pdf21 Jun 2025
Certificates of CA (Form 3)File: FROM 3 SIDDHANT REALTIES MARCH 25 PHASE 1 PS2100013259.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC PHASE 1.pdf13 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG PHASE 1.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD PHASE 1.pdf13 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A.pdf13 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 (phase-1)31Dec24.pdf16 Jan 2025
Certificates of CA (Form 3)File: CA.pdf15 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf15 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC.pdf15 Nov 2024
Certificates of CA (Form 3)File: CA.pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf15 Nov 2024
Disclosure of sold/ booked inventoryFile: Building WiseA wing Mount 2024_compressed (1).pdf13 Aug 2024
Certificates of CA (Form 3)File: Siddhant Realities Form 3 Phase 1 30-6-24 (1).pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Siddhant Realities Form 5 Phase1-2, 1-4-23 to 31-3-24.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 1 form 1 30624.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: siddhant realties phase1 form2.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: siddhant realties phase1 form2A.pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase 1 31-3-24_compressed.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 phase 1.pdf20 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BRISAA 1 BANK.pdf2 Apr 2024
Disclosure of sold/ booked inventoryFile: s u.pdf16 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-6-2022_page-0001.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-9-2022_page-0001.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-12-22_page-0001.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-3-2023_page-0001.pdf14 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-6-22_page-0001 (1).pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (2)_page-0001.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: su.pdf14 Mar 2024
Certificates of CA (Form 3)File: form3 phase 1 31-12-2023 (5)_page-0001 (1).pdf14 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1)_page-0001.pdf14 Mar 2024
Declaration in FORM BFile: Form B Phase I.pdf3 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-23 169 (2).pdf3 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Siddhant Realities 1-4-22 to 31-3-23.pdf3 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-6-22.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-9-22.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-22.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-3-23.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-9-23.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-23.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 1- 30-6-22.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 1- 30-9-22.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phase 1- 31-12-22.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3 Phse-1 30-6-23.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-3-2021.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-6-2021.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-9-2021.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-12-2021.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-3-2022.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-6-2022.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-9-2022.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-12-22.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-3-2023.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 1 - 31-9-2023_page-0001.pdf19 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ANNEXURE A phase -1.pdf27 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Phase 1 From 2.pdf14 Oct 2023
Certificates of CA (Form 3)File: Form 3 phase 1 1to3.pdf14 Oct 2023
Certificates of CA (Form 3)File: Form 3 phase 1 4 to 6.pdf14 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Phase 1 Separate Account .pdf14 Oct 2023
Proforma of Agreement for saleFile: Agreement to sale.pdf11 Sep 2023
Deviation Report with respect to Allotment letterFile: Model Form of Allotment Letter.pdf11 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Model Form of Allotment Letter.pdf11 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 FY 2022-23.pdf17 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf17 Aug 2023
Details of encumbrances concerned to FinanceFile: Declaration about details of Encumbrances.pdf25 Mar 2023

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MOUNT BRISA - PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near kAMTHE WASTI13,700+ in Pune

2 kmMOUNT BRISA - PHASE ICompleted 78Lapsed / revoked 44Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 189 registered projects within 2 km.

Builder: SIDDHANT REALTIES

SIDDHANT REALTIES has 2 registrations on MahaRERA, including MOUNT BRISA - PHASE I and MOUNT BRISA PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MOUNT BRISA - PHASE I is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOUNT BRISA - PHASE I?

The registered promoter entity is SIDDHANT REALTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOUNT BRISA - PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOUNT BRISA - PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOUNT BRISA - PHASE I?

The professionals named in the filing: Architect: SWAPNIL KSHIRSAGAR; Engineer: YUVRAJ VITTHAL SONAR; Chartered Accountant: JOSHI & RAYKAR CHARTERED ACCOUNTANTS; Chartered Accountant: MS JOSHI AND ASSOCIATES; Chartered Accountant: Aghav Wavhal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOUNT BRISA - PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOUNT BRISA - PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOUNT BRISA - PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.