Home / Browse projects / Aurangabad, Maharashtra / MOTI GRAND CITY PHASE - 2

Registered No litigation declared Residential / Group Housing project

MOTI GRAND CITY PHASE - 2

By SAMEERALI RAMZANALI MOTI

RG-MH-22926 · RERA P51500051478 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
16 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 80%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

MOTI GRAND CITY PHASE - 2 is a Residential / Group Housing project by SAMEERALI RAMZANALI MOTI in Aurangabad, Maharashtra, registered with MahaRERA as P51500051478 on 23 Jun 2023. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameMOTI GRAND CITY PHASE - 2
  • TypeResidential / Group Housing
  • Location
    • DAULATABAD ROAD
    • PADEGAON
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • RERA no.P51500051478
  • ReraGenie IDRG-MH-22926

Builder

  • NameSAMEERALI RAMZANALI MOTI
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA70000
BUILDING B WING 1 ROW HOUSE F9 TO F15NA10000
BUILDING B WING 2 ROW HOUSE F1 TO F8NA20000
BUILDING C ROW HOUSE G1 TO G10NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 80%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B WING 1 ROW HOUSE F9 TO F1540%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B WING 2 ROW HOUSE F1 TO F868%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C ROW HOUSE G1 TO G1071%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes60%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Closed/Covered8
Open Space75
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A05050
BUILDING B WING 1 ROW HOUSE F9 TO F15077
BUILDING B WING 2 ROW HOUSE F1 TO F88816
BUILDING C ROW HOUSE G1 TO G1001010

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,650 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityAURANGABAD MUNICIPAL CORPORATION
Permissible FSI6645.5
Proposed, not sanctioned6,646 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVANI CHAMBERS AKASHWANI CHOWK AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJayant Tappu
EngineerKHAN AND ASSOCIATES
Chartered AccountantKAPVALT & CO
Chartered AccountantKAPVALT & CO.
PartnerRole in project
SAMEERALI RAMZANALI MOTI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1.pdf18 Jun 2026
Form 2File: Form 2.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Phase 2.pdf18 Jun 2026
Form 1File: Form 1 Phase 2 Q3.pdf23 Jun 2025
Form 2File: Form 2 Phase 2 Q3.pdf23 Jun 2025
Form 3File: CA Cert (Form 3) Phase II Q3.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q3.pdf23 Jun 2025
Form 1File: Form 1 Q4.pdf23 Jun 2025
Form 2File: Form 2 Q4.pdf23 Jun 2025
Form 3File: CA Certificate (Form 3) Phase II Q4.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q4.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Form 1 Phase 2.pdf29 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 2 Jul-Sep 24.pdf29 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Form 2 Phase 2.pdf29 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Form 1 Phase II_compressed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Form 2 Phase II.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Cert Form 2A Phase II.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase 2 Apr-Jun 24 NEW.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.PDF23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.PDF23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Form 2A.PDF23 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.PDF23 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance LATEST.PDF10 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance LATEST.PDF10 Jun 2023
CERSAI detailsFile: CERSAI Report and Declaration.pdf10 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.PDF10 Jun 2023
Proforma of Agreement for saleFile: ATS Phase 2 Pg 1-10.pdf2 Jun 2023
Proforma of Agreement for saleFile: ATS Phase 2 Pg 11-19.pdf2 Jun 2023
Copy of the legal title reportFile: Search Report (Format A).PDF15 May 2023
Declaration in FORM BFile: Affitavit (Form B) - Land Owner.pdf10 May 2023
Layout approvalFile: Approved Layout.pdf28 Apr 2023
Building plan approvalFile: D.pdf28 Apr 2023
Building plan approvalFile: E.pdf28 Apr 2023
PAN CardFile: Sameer Moti PAN .pdf28 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance 2.pdf28 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance 2.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: Approved Layout.pdf28 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: D.pdf28 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: E.pdf28 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2_compressed.pdf28 Apr 2023
Declaration about Commencement CertificateFile: Declaration about CC 2.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf28 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest 2.pdf28 Apr 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep MOTI GRAND CITY PHASE - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PADEGAON1,400+ in Aurangabad

Builder: SAMEERALI RAMZANALI MOTI

SAMEERALI RAMZANALI MOTI has 1 registration on MahaRERA, including MOTI GRAND CITY PHASE - 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if MOTI GRAND CITY PHASE - 2 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOTI GRAND CITY PHASE - 2?

The registered promoter entity is SAMEERALI RAMZANALI MOTI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOTI GRAND CITY PHASE - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOTI GRAND CITY PHASE - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOTI GRAND CITY PHASE - 2?

The professionals named in the filing: Architect: Jayant Tappu; Engineer: KHAN AND ASSOCIATES; Chartered Accountant: KAPVALT & CO; Chartered Accountant: KAPVALT & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOTI GRAND CITY PHASE - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOTI GRAND CITY PHASE - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOTI GRAND CITY PHASE - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.