ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / MORE GALAXY

Completed No litigation declared Residential / Group Housing project

MORE GALAXY

By ASHTAVINAYAK BUILDERS & DEVELOPERS

RG-MH-75150 · RERA P52800033865 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
9 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

MORE GALAXY is a Residential / Group Housing project by ASHTAVINAYAK BUILDERS & DEVELOPERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800033865 on 14 Mar 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 58 of the 67 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameMORE GALAXY
  • TypeResidential / Group Housing
  • Location
    • Near Guhagar Bypass
    • Mirjoli
    • Chiplun
    • Ratnagiri
    • 415605
  • Pincode415605
  • RERA no.P52800033865
  • ReraGenie IDRG-MH-75150

Builder

  • NameASHTAVINAYAK BUILDERS & DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABUFA3398N1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMaruti Tulajappa More, Hrutik Baliram More
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2022First promiseDec 2025Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed61 files

Current status

87%58 of 67 units booked
100.0%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MORE GALAXYNA10767067

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MORE GALAXY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,680 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Feb 2026
LandownerVillageDistrict
Ramesh Laxman BhurteChiplun (M Cl)Ratnagiri

Approvals and building plan

Sanctioning authorityChiplun Municipal Council
Permissible FSI3763.2
Proposed, not sanctioned3,763 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSurvey No 147 Hissa No 1 Near S T Stand 415605
Estimated costRs 12.01 cr
Cost incurredRs 12.01 cr
Work done100.0%
BuildingWingEstimatedIncurred
MORE GALAXYNARs 11.17 crRs 11.17 cr
-NARs 83.51 lakhRs 83.51 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesai & Associates
ArchitectDeelip Sadashiv Desai
EngineerDesai & Associates
EngineerRahul Laxman Pangale
Chartered AccountantPawan Landage & Co.
Chartered AccountantMAYURESH PURUSHOTTAM JOSHI
Chartered AccountantSRUSHTI SUHAS KASHALKAR
PartnerRole in project
ASHTAVINAYAK BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26022620026Dec 2025 → Dec 2026

Reason as filed by the promoterWe, propose to revise the project by utilizing additional FSI to optimize the development potential. Accordingly, revised plans are required to be prepared and submitted for approval to the Competent Authority. The statutory approval process, scrutiny, and compliance formalities are expected to take some additional time. Hence, the delay is procedural in nature. We remain fully committed to completing the project at the earliest upon receipt of the necessary approvals.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Archutect Certificate 31-03-2026.pdf16 May 2026
Withdrawal Update Form 2File: Engineer Certificate 31-03-2026.pdf16 May 2026
Withdrawal Update Form 3File: CA Certificate 31-03-2026.pdf16 May 2026
Occupational CertificateFile: Full Coccupancy Certificate.pdf16 May 2026
Occupational CertificateFile: Commencement Certificate.pdf16 May 2026
Occupational CertificateFile: Sanctioned Plan.pdf16 May 2026
Withdrawal Update Form 1File: Architect Certificate 31-12-2025.pdf26 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate 31-12-2025.pdf26 Feb 2026
Withdrawal Update Form 3File: CA Certificate 31-12-2025.pdf26 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf26 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf26 Feb 2026
Withdrawal Update Form 1File: Architect Certificate 30-09-2025.pdf24 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate 30-09-2025.pdf24 Feb 2026
Withdrawal Update Form 3File: CA Certificate 30-09-2025.pdf24 Feb 2026
Form 1File: Architect Certificate 30-06-2025.pdf22 Jul 2025
Form 2File: Engineer Certificate 30-06-2025.pdf22 Jul 2025
Form 3File: CA Certificate 30-06-2025.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 30-06-2025.pdf22 Jul 2025
Form 1File: Architect Certificate 31-03-2025.pdf26 Jun 2025
Form 2File: Engineer Certificate 31-03-2025.pdf26 Jun 2025
Form 3File: CA Certificate 31-03-2025.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-03-2025.pdf26 Jun 2025
Form 1File: Architect Certificate 30-09-2024.pdf26 Jun 2025
Form 2File: Engineer Certificate 30-09-2024.pdf26 Jun 2025
Form 3File: CA Certificate 30-Sep-2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30-09-2024.pdf26 Jun 2025
Form 1File: Architect Certificate 31-12-2024.pdf26 Jun 2025
Form 2File: Engineer Certificate 31-12-2024.pdf26 Jun 2025
Form 3File: CA Certificate 31-Dec-2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31-12-2024.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-12-2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30-Sep-2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 31-Dec-2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30-09-2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31-12-2024.pdf20 Feb 2025
Building plan approvalFile: Blueprint.pdf18 Nov 2024
Building plan approvalFile: Blueprint.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf18 Nov 2024
PAN CardFile: PAN Card.pdf7 Mar 2022
Copy of the legal title reportFile: Search Report.pdf7 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200231808420_For_Asset_Based_Search_07_03_2022_17_09_11_290.pdf7 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Mar 2022
Layout approvalFile: Blueprint 1.pdf7 Feb 2022
Layout approvalFile: Blueprint 2.pdf7 Feb 2022
Building plan approvalFile: Blueprint 1.pdf7 Feb 2022
Building plan approvalFile: Blueprint 2.pdf7 Feb 2022
Details of encumbrancesFile: Encumbrance Certificate.pdf7 Feb 2022
Copy of Layout Approval (in case of layout)File: Blueprint 1.pdf7 Feb 2022
Copy of Layout Approval (in case of layout)File: Blueprint 2.pdf7 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Blueprint 1.pdf7 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Blueprint 2.pdf7 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Feb 2022
Declaration about Commencement CertificateFile: Format D.pdf7 Feb 2022
Declaration in FORM BFile: Form B Promoter.pdf7 Feb 2022
Proforma of Allotment letterFile: Proforma Sale Agreement.pdf7 Feb 2022
Proforma of Allotment letterFile: Allotment Letter.pdf7 Feb 2022
OtherFile: POA.pdf7 Feb 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GAURI APARTMENTPR1280002502780Raotale, Ratnagiri28Mar 2026OngoingDec 2029Not due yet
JAYGANGA APARTMENTP52800077693Chiplun, Ratnagiri32Oct 2024OngoingDec 2028Not due yet

How this compares with Ratnagiri

87%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 12 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep MORE GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mirjoli1,100+ in Ratnagiri

Builder: ASHTAVINAYAK BUILDERS & DEVELOPERS

ASHTAVINAYAK BUILDERS & DEVELOPERS has 4 registrations on MahaRERA, including MORE GALAXY and JAYGANGA APARTMENT. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if MORE GALAXY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MORE GALAXY?

The registered promoter entity is ASHTAVINAYAK BUILDERS & DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABUFA3398N1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MORE GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MORE GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MORE GALAXY?

The professionals named in the filing: Architect: Desai & Associates; Architect: Deelip Sadashiv Desai; Engineer: Desai & Associates; Engineer: Rahul Laxman Pangale; Chartered Accountant: Pawan Landage & Co.; Chartered Accountant: MAYURESH PURUSHOTTAM JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MORE GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MORE GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MORE GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.