Registered No litigation declared Residential / Group Housing project

MOONSTONE

By SWAMIJI DEVELOPERS

RG-MH-95441 · RERA P52100050771 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 2 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
16 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

MOONSTONE is a Residential / Group Housing project by SWAMIJI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100050771 on 3 May 2023. Possession is promised by 5 Oct 2026. The completion date has moved by 2 months from the original filing. 19 of the 35 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameMOONSTONE
  • TypeResidential / Group Housing
  • Location
    • S. NO. 33/3A/1
    • KESHAV NAGAR
    • MUNDHWA
    • PUNE
    • NEAR OLD ORBIS SCHOOL
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050771
  • ReraGenie IDRG-MH-95441

Builder

  • NameSWAMIJI DEVELOPERS
  • Entity typePartnership
  • GSTIN27ADSFS3666B1ZQ
  • PartnersDEEPAK DURGAPRASAD TIWARI, SHUBHANGI AMIT KAWADE, TRIVENI VIKAS KODRE, ATUL KAILAS KODRE, VIJAY NARAYAN DAREKAR

Key dates

this monthRegisteredMay 2023First promiseAug 2026Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion5 Oct 2026
  • Revised completionRevised to 5 Oct 2026 (originally 5 Aug 2026)
  • Buildings1 building record
  • Documents filed79 files

Current status

54%19 of 35 units booked
96.0%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
moonstone s no 33/3A/1 mundhwa tal - haveli, dist - puneNA7730535

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

moonstone s no 33/3A/1 mundhwa tal - haveli, dist - pune: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered23
Open Space30

Land and ownership28

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area604 sq m
Land owned byThe promoter, with other names on the file
Named landowners28
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024
LandownerVillageDistrict
NaredraKumar Shivshanker TrivediMundhawaPune
Ramesh Keshavprasad Gupta-Pune
Ganesh keshavPrasad Gupta-Pune
Ashish Durgaprasad TiwariPune (M Corp.)Pune
Avinash Durgaprasad TiwariPune (M Corp.)Pune
kamalabai durgaprasad tiwariPune (M Corp.)Pune
William JosephGhorpadiPune
Erick JosePh BastionMundhawaPune
Shreedhar naredrakumar TrivediMundhawaPune
Gayatri Naredrakumar trivediMundhawaPune
Shivani shreedhar trivediMundhawaPune
Miss shreya Shreedhar trivediMundhawaPune
Master prabhat shreedhar trivediMundhawaPune
Mr Giridhar Naredrakumar trivediMundhawaPune
MRS Gitajali giridhar trivediMundhawaPune
Miss Roshani giridhar trivediMundhawaPune
Master AAyush Giridhar trivediMundhawaPune
MRS suman Ganesh Gupta-Pune
miss Shewta Ganesh gutpa-Pune
Miss Iwani Ganesh gupta-Pune
MRS Sakshi Ashwin TiwariPune (M Corp.)Pune
Master Adharsh Ashawin TiwariPune (M Corp.)Pune
MRS Marina William JosephGhorpadiPune
MRS Irene Rita WilliamGhorpadiPune
MR Nilson WilliamGhorpadiPune
MRS Anita Erick BastianMundhawaPune
MISS Ashber Erick BastianMundhawaPune
Master Neil Erick BastianMundhawaPune

Approvals and building plan

Sanctioning authorityPoona Municipal Corporation
Permissible FSI1447.86
Proposed, not sanctioned1,448 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKUMAR CEREBRUM, KALYANI NAGAR, PUNE 411015
Estimated costRs 3.76 cr
Cost incurredRs 3.61 cr
Work done96.01%
BuildingWingEstimatedIncurred
moonstone s no 33/3A/1 mundhwa tal - haveli, dist - puneNARs 3.76 crRs 3.61 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUPESH JAMKHINDIKAR
EngineerVISHAL ABASAHEB KUNJIR
Chartered AccountantPANKAJ P PATIL
Chartered AccountantAmogh Ghule
Chartered AccountantPravin Pise & Associates
Chartered AccountantVaibhav Bhise & Associates
PartnerRole in project
SWAMIJI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06082622033Aug 2026 → Oct 2026

Reason as filed by the promoterThe project experienced unavoidable delays due to circumstances beyond the Promoter's control. A significant shortage of skilled and semi-skilled labour arose following the large-scale migration of workers after the pandemic, resulting in delays in construction activities despite continuous efforts to mobilize manpower. Further, unprecedented escalation in the prices of key construction materials such as cement, steel, sand, aggregates, fuel, and electrical materials, coupled with persistent inflation, substantially increased labour wages, transportation, machinery, and subcontracting costs, a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24 MOONSTONE 1.pdf20 Aug 2026
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25 MOONSTONE 3.pdf20 Aug 2026
Form 5 (FY 2025-2026)File: FORM 5 FY 2025-26 MOONSTONE 2.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: Form_2A.pdf6 Aug 2026
Withdrawal Update Form 1File: F1 (2).pdf20 Jul 2026
Withdrawal Update Form 2File: F2.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 swamiji.pdf20 Jul 2026
Withdrawal Update Form 1File: Form-1 Arch certificate Moonstone.pdf16 May 2026
Withdrawal Update Form 2File: Form-2 moonstone.pdf16 May 2026
Withdrawal Update Form 3File: F3-MOONSTONE.pdf16 May 2026
Withdrawal Update Form 1File: Form1 Architects certificate.pdf27 Jan 2026
Withdrawal Update Form 2File: From 2 Engineer certificate.pdf27 Jan 2026
Withdrawal Update Form 3File: From 3 Swamiji _organized.pdf27 Jan 2026
Withdrawal Update Form 1File: RERA Form I Sep_2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Engineers Form site super.pdf17 Dec 2025
Withdrawal Update Form 3File: F3-MOONSTONE (SEPT-25).pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf29 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf29 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc cer mar-25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar-25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Form 2 Mar-25.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY 2.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec- 24.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 2024.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate-Sep 24.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep-24.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate- Sep 24.pdf14 Nov 2024
Building plan approvalFile: Building Plan.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate-June 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_30th Jun 2024.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-June 24.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory.pdf8 Oct 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I-Architect.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certifcate - converted.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Mar 24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Jun 23- 040324.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Sep 23 040324.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Dec 23- 040324.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Jun-23.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Sep-23.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec-23.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold and Unslod booked inventory 3062023.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: sold and unsold book inventory 3092023.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: sold and unsold booked inventory 31122023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jun-23.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sept 23.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 23.pdf7 Mar 2024
CERSAI detailsFile: Cresai Details.pdf14 Apr 2023
Copy of the legal title reportFile: legal report - format A.pdf5 Apr 2023
Details of encumbrances concerned to FinanceFile: self declaration encumbrance concern - legal.pdf5 Apr 2023
Details of encumbrances concerned to LegalFile: self declaration encumbrance concern - legal.pdf5 Apr 2023
Declaration in FORM BFile: form B.pdf5 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank account format A.pdf5 Apr 2023
Deviation Report with respect to Allotment letterFile: declaration for no deviation for allotment letter.pdf5 Apr 2023
Deviation Report with respect to model copy of AgreementFile: declaration for no deviation for AIS (agreeement for sale).pdf5 Apr 2023
Layout approvalFile: NA order.pdf21 Mar 2023
Layout approvalFile: layout approval.pdf21 Mar 2023
Building plan approvalFile: builiding sanction plan.pdf21 Mar 2023
PAN CardFile: pancard.pdf21 Mar 2023
Copy of Layout Approval (in case of layout)File: layout approval.pdf21 Mar 2023
Copy of Layout Approval (in case of layout)File: NA order.pdf21 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: builiding sanction plan.pdf21 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf21 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: NA order.pdf21 Mar 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf21 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf21 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf21 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf21 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (form 3).pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf21 Mar 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf21 Mar 2023
Proforma of Allotment letterFile: Proforma of allotment letter.pdf21 Mar 2023

How this compares with Pune

54%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 2 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MOONSTONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR OLD ORBIS SCHOOL13,700+ in Pune

2 kmMOONSTONECompleted 78Lapsed / revoked 25Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 197 registered projects within 2 km.

Builder: SWAMIJI DEVELOPERS

SWAMIJI DEVELOPERS has 1 registration on MahaRERA, including MOONSTONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MOONSTONE is delayed beyond 5 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MOONSTONE?

The registered promoter entity is SWAMIJI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADSFS3666B1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MOONSTONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MOONSTONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MOONSTONE?

The professionals named in the filing: Architect: RUPESH JAMKHINDIKAR; Engineer: VISHAL ABASAHEB KUNJIR; Chartered Accountant: PANKAJ P PATIL; Chartered Accountant: Amogh Ghule; Chartered Accountant: Pravin Pise & Associates; Chartered Accountant: Vaibhav Bhise & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MOONSTONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MOONSTONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MOONSTONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.