MOONSTONE
RG-MH-95441 · RERA P52100050771 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 2 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MOONSTONE is a Residential / Group Housing project by SWAMIJI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100050771 on 3 May 2023. Possession is promised by 5 Oct 2026. The completion date has moved by 2 months from the original filing. 19 of the 35 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameMOONSTONE
- TypeResidential / Group Housing
- Location
- S. NO. 33/3A/1
- KESHAV NAGAR
- MUNDHWA
- PUNE
- NEAR OLD ORBIS SCHOOL
- Mundhawa
- Haveli
- Pune
- 411036
- Pincode411036
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050771
- ReraGenie IDRG-MH-95441
Builder
- NameSWAMIJI DEVELOPERS
- Entity typePartnership
- GSTIN27ADSFS3666B1ZQ
- PartnersDEEPAK DURGAPRASAD TIWARI, SHUBHANGI AMIT KAWADE, TRIVENI VIKAS KODRE, ATUL KAILAS KODRE, VIJAY NARAYAN DAREKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 May 2023
- Promised completion5 Oct 2026
- Revised completionRevised to 5 Oct 2026 (originally 5 Aug 2026)
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| moonstone s no 33/3A/1 mundhwa tal - haveli, dist - pune | NA | 7 | 7 | 30 | 5 | 35 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
moonstone s no 33/3A/1 mundhwa tal - haveli, dist - pune: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership28
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NaredraKumar Shivshanker Trivedi | Mundhawa | Pune |
| Ramesh Keshavprasad Gupta | - | Pune |
| Ganesh keshavPrasad Gupta | - | Pune |
| Ashish Durgaprasad Tiwari | Pune (M Corp.) | Pune |
| Avinash Durgaprasad Tiwari | Pune (M Corp.) | Pune |
| kamalabai durgaprasad tiwari | Pune (M Corp.) | Pune |
| William Joseph | Ghorpadi | Pune |
| Erick JosePh Bastion | Mundhawa | Pune |
| Shreedhar naredrakumar Trivedi | Mundhawa | Pune |
| Gayatri Naredrakumar trivedi | Mundhawa | Pune |
| Shivani shreedhar trivedi | Mundhawa | Pune |
| Miss shreya Shreedhar trivedi | Mundhawa | Pune |
| Master prabhat shreedhar trivedi | Mundhawa | Pune |
| Mr Giridhar Naredrakumar trivedi | Mundhawa | Pune |
| MRS Gitajali giridhar trivedi | Mundhawa | Pune |
| Miss Roshani giridhar trivedi | Mundhawa | Pune |
| Master AAyush Giridhar trivedi | Mundhawa | Pune |
| MRS suman Ganesh Gupta | - | Pune |
| miss Shewta Ganesh gutpa | - | Pune |
| Miss Iwani Ganesh gupta | - | Pune |
| MRS Sakshi Ashwin Tiwari | Pune (M Corp.) | Pune |
| Master Adharsh Ashawin Tiwari | Pune (M Corp.) | Pune |
| MRS Marina William Joseph | Ghorpadi | Pune |
| MRS Irene Rita William | Ghorpadi | Pune |
| MR Nilson William | Ghorpadi | Pune |
| MRS Anita Erick Bastian | Mundhawa | Pune |
| MISS Ashber Erick Bastian | Mundhawa | Pune |
| Master Neil Erick Bastian | Mundhawa | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| moonstone s no 33/3A/1 mundhwa tal - haveli, dist - pune | NA | Rs 3.76 cr | Rs 3.61 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RUPESH JAMKHINDIKAR |
| Engineer | VISHAL ABASAHEB KUNJIR |
| Chartered Accountant | PANKAJ P PATIL |
| Chartered Accountant | Amogh Ghule |
| Chartered Accountant | Pravin Pise & Associates |
| Chartered Accountant | Vaibhav Bhise & Associates |
| Partner | Role in project |
|---|---|
| SWAMIJI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project experienced unavoidable delays due to circumstances beyond the Promoter's control. A significant shortage of skilled and semi-skilled labour arose following the large-scale migration of workers after the pandemic, resulting in delays in construction activities despite continuous efforts to mobilize manpower. Further, unprecedented escalation in the prices of key construction materials such as cement, steel, sand, aggregates, fuel, and electrical materials, coupled with persistent inflation, substantially increased labour wages, transportation, machinery, and subcontracting costs, a
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24 MOONSTONE 1.pdf | 20 Aug 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25 MOONSTONE 3.pdf | 20 Aug 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 FY 2025-26 MOONSTONE 2.pdf | 20 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form_2A.pdf | 6 Aug 2026 |
| Withdrawal Update Form 1File: F1 (2).pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: F2.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 swamiji.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form-1 Arch certificate Moonstone.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Form-2 moonstone.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: F3-MOONSTONE.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: Form1 Architects certificate.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: From 2 Engineer certificate.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: From 3 Swamiji _organized.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: RERA Form I Sep_2025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: Engineers Form site super.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: F3-MOONSTONE (SEPT-25).pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Sep 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 29 Sep 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 29 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc cer mar-25.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar-25.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Form 2 Mar-25.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY 2.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec- 24.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 24.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 2024.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 24.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate-Sep 24.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sep-24.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate- Sep 24.pdf | 14 Nov 2024 |
| Building plan approvalFile: Building Plan.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate-June 24.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_30th Jun 2024.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-June 24.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory.pdf | 8 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I-Architect.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certifcate - converted.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Mar 24.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Jun 23- 040324.pdf | 7 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Sep 23 040324.pdf | 7 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I Dec 23- 040324.pdf | 7 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Jun-23.pdf | 7 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Sep-23.pdf | 7 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec-23.pdf | 7 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unslod booked inventory 3062023.pdf | 7 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: sold and unsold book inventory 3092023.pdf | 7 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: sold and unsold booked inventory 31122023.pdf | 7 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Jun-23.pdf | 7 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sept 23.pdf | 7 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 23.pdf | 7 Mar 2024 |
| CERSAI detailsFile: Cresai Details.pdf | 14 Apr 2023 |
| Copy of the legal title reportFile: legal report - format A.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: self declaration encumbrance concern - legal.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to LegalFile: self declaration encumbrance concern - legal.pdf | 5 Apr 2023 |
| Declaration in FORM BFile: form B.pdf | 5 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank account format A.pdf | 5 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: declaration for no deviation for allotment letter.pdf | 5 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: declaration for no deviation for AIS (agreeement for sale).pdf | 5 Apr 2023 |
| Layout approvalFile: NA order.pdf | 21 Mar 2023 |
| Layout approvalFile: layout approval.pdf | 21 Mar 2023 |
| Building plan approvalFile: builiding sanction plan.pdf | 21 Mar 2023 |
| PAN CardFile: pancard.pdf | 21 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: layout approval.pdf | 21 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: NA order.pdf | 21 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: builiding sanction plan.pdf | 21 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 21 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA order.pdf | 21 Mar 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 21 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 21 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 21 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (form 3).pdf | 21 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 21 Mar 2023 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 21 Mar 2023 |
| Proforma of Allotment letterFile: Proforma of allotment letter.pdf | 21 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MOONSTONE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR OLD ORBIS SCHOOL13,700+ in Pune
Filed coordinates, straight-line distance. 197 registered projects within 2 km.
Godrej Aqua Vista
Oxford Realty LLP
Godrej Elaris
Godrej Properties Limited
Sukhwani Hermosa Casa
Sukhwani Associates
Basil Mondale
velx constructions llp
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Builder: SWAMIJI DEVELOPERS
SWAMIJI DEVELOPERS has 1 registration on MahaRERA, including MOONSTONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MOONSTONE is delayed beyond 5 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MOONSTONE?
The registered promoter entity is SWAMIJI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADSFS3666B1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MOONSTONE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MOONSTONE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MOONSTONE?
The professionals named in the filing: Architect: RUPESH JAMKHINDIKAR; Engineer: VISHAL ABASAHEB KUNJIR; Chartered Accountant: PANKAJ P PATIL; Chartered Accountant: Amogh Ghule; Chartered Accountant: Pravin Pise & Associates; Chartered Accountant: Vaibhav Bhise & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MOONSTONE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback