Red flags
- Registration lapsed
- Possession 96 months past the filed date
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MOONGIPA LANDMARK is a Residential / Group Housing project by MOONGIPA REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003830 on 6 Aug 2017. Possession was promised by 31 Oct 2018 and is now 96 months past that date.
At a glance
Project
- NameMOONGIPA LANDMARK
- TypeResidential / Group Housing
- Location
- D N Nagar
- D N Nager
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003830
- ReraGenie IDRG-MH-20514
Builder
- NameMOONGIPA REALTY PRIVATE LIMITED
- Entity typeCompany
- GSTIN27AAICA9030H1ZO
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsRAJESH BASUDEO AGARWAL, SANJAY BASUDEO AGARWAL
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion31 Oct 2018
- Revised completionRevised to 31 Oct 2018 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed108 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NAVRATNA CHSL | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.
NAVRATNA CHSL: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 5 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed44
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Navratna Co-operative Housing Society Ltd | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ELLORA PROJECT CONSULTANTS |
| Engineer | UMIYA STRUCTURAL CONSULTANTS |
| Partner | Role in project |
|---|---|
| MOONGIPA REALTY PRIVATE LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 31026/2021 | Honble Bombay High Court | Matter referred to Arbitrator Shri Anoshak S Daver |
| 12/2022 in CC/483/2021 /2021 | Consumer Court | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4-Form 1 - Sept 19.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3-Form 1 - June 19.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 24-Form 1 -Sept 24.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23-Form 1 -Jun 24.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 22-Form 1 -Mar 24.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21-Form 1 -Dec 23.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20-Form 1 -Sept 23.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19-Form 1 -Jun 23.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18-Form 1 -Mar 23.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 17-Form 1 -Dec 22.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 16-Form 1 -Sept 22.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-Form 1 -Mar 22.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13-Form 1 -Dec 21.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11-Form 1 -Jun 21.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11-Form 1 -Jun 21.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10-Form 1 -Mar 21.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9-Form 1 -Dec 20.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8-Form 1 -Sept 20.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7-Form 1 -Jun 20.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6-Form 1 -Mar 20.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5-Form 1 - Dec 19.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-Form 1 -Mar 22.pdf | 5 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 24-Form 2 - Sep 24.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3-Form 2 June 19.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 23-Form 2 - June 24.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 22-Form 2 - Mar 24.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 21-Form 2 - Dec 23.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20-Form 2 - Sept 23.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19-Form 2 - June 23.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18-Form 2 - Mar 23.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17-Form 2 - Dec 22.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16-Form 2 - Sept 22.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15-Form 2 - June 22.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14-Form 2 - Mar 22.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12-Form 2 - Sep 21.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2-Form 2 Mar 18.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4-Form 2 Sept 19.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5-Form 2 Dec 19.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6-Form 2 Mar 20.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7-Form 2 June 20.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8-Form 2 Sept 20.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9-Form 2 - Dec 20.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10-Form 2 - Mar 21.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11-Form 2 - June 21.pdf | 2 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13-Form 2 - Dec 21.pdf | 2 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2-Form 2A as on 31032020.pdf | 2 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3-Form 2A as on 31032021.pdf | 2 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4-Form 2A as on 31032022.pdf | 2 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5-Form 2A as on 31032023.pdf | 2 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6-Form 2A as on 31032024.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf | 2 Dec 2024 |
| Certificates of CA (Form 3)File: Signed Form 3 - June 2024.pdf | 28 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 - Sept 24.pdf | 28 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 27 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 27 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 26 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22 23 Moongipa Landmark.pdf | 14 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 _signed.pdf | 11 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 _signed.pdf | 9 Mar 2024 |
| Declaration in FORM BFile: Form B Notarized_compressed.pdf | 5 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 9 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19 20 Moongipa Landmark.pdf | 27 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21 22 Moongipa Landmark.pdf | 27 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18 19 Moongipa Landmark.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20 21 Moongipa Landmark.pdf | 19 Apr 2023 |
| Declaration about Commencement CertificateFile: 2 Declaration of CC.pdf | 7 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Declaration of Interest_Rajesh Agarwal - Copy.pdf | 7 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Declaration of Interest_Sanjay Agarwal.pdf | 7 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 1 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 26 Aug 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 27 Jun 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 20 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 24 Feb 2022 |
| Certificates of CA (Form 3)File: Form 3.pdf | 27 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 2 Aug 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Navratna Society Reg Cert.pdf | 21 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 27 May 2021 |
| Certificates of CA (Form 3)File: Form 3 Navratna.pdf | 17 Apr 2021 |
| Certificates of CA (Form 3)File: Form3.pdf | 22 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MOONGIPA LANDMARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near D N Nager6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 311 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: MOONGIPA REALTY PRIVATE LIMITED
MOONGIPA REALTY PRIVATE LIMITED has 2 registrations on MahaRERA, including MOONGIPA LANDMARK and MOONGIPA ARCADE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that MOONGIPA LANDMARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MOONGIPA LANDMARK is delayed beyond 31 Oct 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MOONGIPA LANDMARK?
The registered promoter entity is MOONGIPA REALTY PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAICA9030H1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MOONGIPA LANDMARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MOONGIPA LANDMARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MOONGIPA LANDMARK?
The professionals named in the filing: Architect: ELLORA PROJECT CONSULTANTS; Engineer: UMIYA STRUCTURAL CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MOONGIPA LANDMARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback