Home / Browse projects / Pune, Maharashtra / MIDORI TOWER PHASE 5
MIDORI TOWER PHASE 5
By VIKRAM DEVELOPERS AND PROMOTERS
RG-MH-64038 · RERA P52100052802 · Last updated on MahaRERA portal: 13 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MIDORI TOWER PHASE 5 is a Commercial project by VIKRAM DEVELOPERS AND PROMOTERS in Pune, Maharashtra, registered with MahaRERA as P52100052802 on 5 Oct 2023. Possession is promised by 31 Dec 2027. 3 of the 57 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameMIDORI TOWER PHASE 5
- TypeCommercial
- Location
- NEW DP ROAD
- PIMPLE NILAKH PIMPRI CHINCHWAD PUNE
- Pimple Nilakh
- Haveli
- Pune
- 411027
- Pincode411027
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052802
- ReraGenie IDRG-MH-64038
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed167 files
Current status
Figures as on 13 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING H | NA | 15 | 11 | 0 | 57 | 57 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
WING H: 41% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 56% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 1% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 3% |
Progress on shared amenities15
As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING H | NA | Rs 55.08 cr | Rs 13.23 cr |
| - | NA | Rs 1.18 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANA CONSORTIUM PVT LTD |
| Engineer | AJAY T MAHAJAN |
| Chartered Accountant | DRP & CO LLP |
| Chartered Accountant | CA Niraj V Nawandhar |
| Partner | Role in project |
|---|---|
| VIKRAM DEVELOPERS AND PROMOTERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed167
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5- MIDORI TOWER-PH-5-MAR-26.pdf | 13 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A-MIDORI PH-5-MAR-2026.pdf | 9 May 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI-PH-5-MAR-2026.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI TOWER PH-5-WING H-MAR-2026.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE MIDORI-PH-5-WING-H-MAR-2026.pdf | 14 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI-PH-5-DEC-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI-PH-5-DEC-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE MIDORI-PH-5-DEC-25.pdf | 13 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5- MIDORI PH-5-16-10-2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE -SEPT-25- MIDORI PH-5.pdf | 9 Oct 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE -SEPT-25-MIDORI PH-5.pdf | 9 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE -SEPT-25-MIDORI PH-5.pdf | 9 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI PH-5 WING H- JUN-2025.pdf | 1 Oct 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI-WING-H- PH-5-JUN-2025.pdf | 1 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE MIDORI PHASE 5-JUN-25.pdf | 1 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI PH-5 WING H- JUN-2025.pdf | 18 Jul 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI-WING-H- PH-5-JUN-2025.pdf | 18 Jul 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE MIDORI PHASE 5-JUN-25.pdf | 18 Jul 2025 |
| Form 1File: ARCH CERTIFICATE MIDORI PH-5.pdf | 27 Jun 2025 |
| Form 2File: ENGG CERTIFICATE MIDORI PH-5.pdf | 27 Jun 2025 |
| Form 3File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI PH-5 WING H.pdf | 27 Jun 2025 |
| Form 1File: ARCH CERTIFICATE MIDORI PH-5 WING H.pdf | 27 Jun 2025 |
| Form 2File: ENGG CERTIFICATE MIDORI-PH-5.pdf | 27 Jun 2025 |
| Form 3File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY MIDORI PH-5.pdf | 27 Jun 2025 |
| Form 1File: ARCH CERTIFICATE MIDORI WING H PH-5.pdf | 27 Jun 2025 |
| Form 2File: ENGG CERTIFICATE MIDORI TOWER PH-5.pdf | 27 Jun 2025 |
| Form 3File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY PH-5.pdf | 27 Jun 2025 |
| Form 1File: ARCH CERTIFICATE MIDORI PH-5.pdf | 27 Jun 2025 |
| Form 2File: ENGG CERTIFICATE MIDORI PH-5.pdf | 27 Jun 2025 |
| Form 3File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY MIDORI PH-5.pdf | 27 Jun 2025 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-17-04-2025.pdf | 17 Apr 2025 |
| Layout approvalFile: 1-29-LAYOUT.pdf | 12 Apr 2025 |
| Building plan approvalFile: 2-29-BASEMENT 3.pdf | 12 Apr 2025 |
| Building plan approvalFile: 3-29-BASEMENT 2.pdf | 12 Apr 2025 |
| Building plan approvalFile: 4-29-BASEMENT 1.pdf | 12 Apr 2025 |
| Building plan approvalFile: 5-29-GROUND FLOOR.pdf | 12 Apr 2025 |
| Building plan approvalFile: 24-29-GROUND AND MEZZ FLOOR -WING-H.pdf | 12 Apr 2025 |
| Building plan approvalFile: 25-29-1ST TO 6TH FLOOR-WING H.pdf | 12 Apr 2025 |
| Building plan approvalFile: 26-29-7TH TO 12TH FLOOR WING H.pdf | 12 Apr 2025 |
| Building plan approvalFile: 27-29-13TH AND TERRACE FLOOR WING H.pdf | 12 Apr 2025 |
| Building plan approvalFile: 28-29-SECTION WING-H.pdf | 12 Apr 2025 |
| Building plan approvalFile: 29-29-SECTION WING-H.pdf | 12 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: 1-29-LAYOUT.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI PH-5.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI PH-5.pdf | 12 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE -29-3-2025_compressed.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-29-GROUND FLOOR.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 29-29-SECTION WING-H.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 28-29-SECTION WING-H.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 27-29-13TH AND TERRACE FLOOR WING H.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 26-29-7TH TO 12TH FLOOR WING H.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 25-29-1ST TO 6TH FLOOR-WING H.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 24-29-GROUND AND MEZZ FLOOR -WING-H.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-29-BASEMENT 1.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-29-BASEMENT 2.pdf | 12 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-29-BASEMENT 3.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY MIDORI PH-5.pdf | 12 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MIDORI TOWER PH-5-MAR-25.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI TOWER PH-5.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI PH-5.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI WING H PH-5.pdf | 11 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 11 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI TOWER PH-5.pdf | 11 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY PH-5.pdf | 11 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MIDORI TOWER PH-5-DEC-24.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI TOWER WING H.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-5 WING H.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI TOWER WING H.pdf | 18 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI TOWER WING H.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI PH-5 WING H.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-5.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI-PH-5.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI PH-5.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MIDORI TOWER PH 5 WING H SEPT-24.pdf | 9 Oct 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VENKATESH GRAFFITI PHASE 5 | SURVEY NO 31 AND 35 PART LONKAR VASTI KESHAVNAGAR MUNDHWA PUNE 411036 | 104 | Completed | Mar 2021 | Feb 2020 |
| VENKATESH JOYNEST PHASE 5 | GAT NO 33 AND 34 PART LONI KALBHOR PUNE 412201 | 39 | Completed | Mar 2020 | Dec 2019 |
| VENKATESH JOYNEST PHASE 4 | GAT NO 33 AND 34 PART LONI KALBHOR PUNE 412201 | 43 | Completed | Dec 2019 | Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 167 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MIDORI TOWER PHASE 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIMPLE NILAKH PIMPRI CHINCHWAD PUNE13,700+ in Pune
Filed coordinates, straight-line distance. 233 registered projects within 2 km.
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: VIKRAM DEVELOPERS AND PROMOTERS
VIKRAM DEVELOPERS AND PROMOTERS has 4 registrations on MahaRERA, including MIDORI TOWER PHASE 2 and MIDORI TOWER PHASE 3. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MIDORI TOWER PHASE 5 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MIDORI TOWER PHASE 5?
The registered promoter entity is VIKRAM DEVELOPERS AND PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MIDORI TOWER PHASE 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MIDORI TOWER PHASE 5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MIDORI TOWER PHASE 5?
The professionals named in the filing: Architect: ANA CONSORTIUM PVT LTD; Engineer: AJAY T MAHAJAN; Chartered Accountant: DRP & CO LLP; Chartered Accountant: CA Niraj V Nawandhar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MIDORI TOWER PHASE 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback