Home / Browse projects / Pune, Maharashtra / MIDORI TOWER PHASE 3

Registered No litigation declared Others project

MIDORI TOWER PHASE 3

By VIKRAM DEVELOPERS AND PROMOTERS

RG-MH-16427 · RERA P52100025886 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 2 extensions taken
  • Rs 48.00 crore secured on the land, in favour of STATE BANK OF INDIA

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
74 of 92Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 305 documents Report an error

MIDORI TOWER PHASE 3 is a Others project by VIKRAM DEVELOPERS AND PROMOTERS in Pune, Maharashtra, registered with MahaRERA as P52100025886 on 27 Jul 2020. Possession is promised by 30 Sep 2027. The completion date has moved by 12 months from the original filing. 18 of the 92 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMIDORI TOWER PHASE 3
  • TypeOthers
  • Location
    • NEW DP ROAD
    • PIMPLE NILAKH
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025886
  • ReraGenie IDRG-MH-16427

Builder

  • NameVIKRAM DEVELOPERS AND PROMOTERS
  • Entity typePartnership
  • PartnersAnkush Bhimrao Asabe, Vikram Venkatrao Gaikwad, LAHURAJ BHIMRAO ASABE
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2020First promiseSep 2026Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2020
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 30 Sep 2026)
  • Buildings1 building record
  • Documents filed305 files

Current status

20%18 of 92 units booked
73.8%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ENA332492092

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

WING E: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises26%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.26%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.11%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes40%
Open ParkingNoNot applicable

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered92

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,926 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSTATE BANK OF INDIA
Secured amountRs 48.00 crore
Declared on28 Jun 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI13318.52
Proposed, not sanctioned6,845 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIROLE BHAVAN PMT BUILDING J M ROAD PUNE 411004
Estimated costRs 54.72 cr
Cost incurredRs 40.39 cr
Work done73.82%
BuildingWingEstimatedIncurred
WING ENARs 53.49 crRs 40.00 cr
-NARs 1.22 crRs 39.17 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA CONSORTIUM PVT LTD
EngineerAJAY T MAHAJAN
Chartered AccountantDRP & CO LLP
Chartered AccountantCA Niraj V Nawandhar
PartnerRole in project
VIKRAM DEVELOPERS AND PROMOTERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019681Sep 2026 → Sep 2027

Reason as filed by the promoterWe have some alteration in building layout sanction plan and as per the said layout plan increase 1 Lift (previously 5 number and now 6 number of Lifts) and the changes in Total RERA Carpet for the said project As per above actual facts our project difficult to complete on due date - 30-09-2026 we require /Want’s to change proposed date of completion is 30-09-2027 instead of 30-09-2026

EXT52100012305Sep 2026 → Sep 2026

Reason as filed by the promoterWe have registered the Project Midori Tower Phase -3 Under MAHARERA and commencement of the said project date is 27-07-2020 and proposed completion date is 30-12-2024. But thereafter as per New Unified Development Control and Promotion Rules 2020 (UDCPR -2020) the said Project FSI and No of floors has been increased as per New UDCPR-2020 Rules we have got sanctioned layout dated - 12-01-2022 We have not sold / booked any units for the said project as on date.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600129Ram GawaliVIKRAM DEVELOPERS AND PROMOTERS09/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed305

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 305 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A MIDORI TOWER PH-3-MAR-26.pdf13 May 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI-PH-3-MAR-2026.pdf14 Apr 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI TOWER PH-3-WING E-MAR-2026.pdf14 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE MIDORI-PH-3-WING-E-MAR-2026.pdf14 Apr 2026
Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI-PH-3-DEC-25.pdf13 Jan 2026
Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI-PH-3-DEC-25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE MIDORI-PH-3-DEC-25.pdf13 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5- MIDORI PH-3-16-10-2025.pdf18 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE -SEPT-25- MIDORI PH-3.pdf11 Oct 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE -SEPT-25-MIDORI PH-3.pdf11 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE -SEPT-25-MIDORI PH-3.pdf11 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE -SEPT-25- MIDORI PH-3.pdf9 Oct 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE -SEPT-25-MIDORI PH-3.pdf9 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE -SEPT-25- MIDORI PH-3.pdf9 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI-WING-E- PH-2-JUN-2025.pdf1 Oct 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI -WING-E-PH-3-JUN-2025.pdf1 Oct 2025
Withdrawal Update Form 3File: CA CERTIFICATE MIDORI -WING-E-PH-3-JUN-2025.pdf1 Oct 2025
Withdrawal Update Form 1File: ARCH CERTIFICATE MIDORI-WING-E- PH-2-JUN-2025.pdf17 Jul 2025
Withdrawal Update Form 2File: ENGG CERTIFICATE MIDORI -WING-E-PH-3-JUN-2025.pdf17 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE MIDORI -WING-E-PH-3-JUN-2025.pdf17 Jul 2025
Form 1File: ARCH CERTIFICATE MIDORI TOWER PHASE -3.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI TOWER PHASE -3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI PHASE -3-WING E.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSER OF SOLD UNSOLD INVENTORY MIDORI WING E-PH-3.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI TOWER PHASE -3.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI TOWER PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI PHASE -3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY MIDORI PH-3.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI WING E PH-3.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI WING E PH-3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI TOWER E WING PH-3.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI TOWER PH-3-.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI WING E PH-3.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI TOWER PH-3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI PH-3 WING E.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI PH-3 WING E.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI-PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI TOWER PH-3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOER OF SOLD UNSOLD INVENTORY MIDORI WING E-PH-3.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI PH-3 WING E.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI-PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI TOWER PH-3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOER OF SOLD UNSOLD INVENTORY MIDORI WING E-PH-3.pdf27 Jun 2025
Form 1File: ARCH CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 2File: ENGG CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Form 3File: CA CERTIFICATE MIDORI PH-3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD INVENTORY MIDORI PH-3.pdf27 Jun 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-17-04-2025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI PH-3.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI PH-3.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI PH-3.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY MIDORI PH-3.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MIDORI TOWER PH-3-MAR-25.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI TOWER PH-3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-3.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI PH-3.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI WING E PH-3.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-3.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI TOWER PH-3.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY MIDORI PH-3.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MIDORI TOWER PH-3-DEC-24.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI TOWER WING E.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-3 WING E.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI TOWER WING E.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI TOWER WING E.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI PH-3 WING E.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MIDORI TOWER PH-3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI-PH-3.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY MIDORI PH-3.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MIDORI TOWER PH 3 WING E SEPT-24.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MIDORI TOWER PH-3-JUNE-24.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - MIDORI TOWER PH-3-SEPT-24.pdf7 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABT CC MIDORI PH-3 WING E.pdf19 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE MIDORI -WING E.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE MIDORI PH-3.pdf10 Aug 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH GRAFFITI PHASE 5SURVEY NO 31 AND 35 PART LONKAR VASTI KESHAVNAGAR MUNDHWA PUNE 411036104CompletedMar 2021Feb 2020
VENKATESH JOYNEST PHASE 5GAT NO 33 AND 34 PART LONI KALBHOR PUNE 41220139CompletedMar 2020Dec 2019
VENKATESH JOYNEST PHASE 4GAT NO 33 AND 34 PART LONI KALBHOR PUNE 41220143CompletedDec 2019Nov 2019

How this compares with Pune

20%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MIDORI TOWER PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPLE NILAKH13,700+ in Pune

2 kmMIDORI TOWER PHASE 3Completed 96Lapsed / revoked 37Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 232 registered projects within 2 km.

Builder: VIKRAM DEVELOPERS AND PROMOTERS

VIKRAM DEVELOPERS AND PROMOTERS has 4 registrations on MahaRERA, including MIDORI TOWER PHASE 2 and MIDORI TOWER PHASE 3. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MIDORI TOWER PHASE 3 is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIDORI TOWER PHASE 3?

The registered promoter entity is VIKRAM DEVELOPERS AND PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIDORI TOWER PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MIDORI TOWER PHASE 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MIDORI TOWER PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIDORI TOWER PHASE 3?

The professionals named in the filing: Architect: ANA CONSORTIUM PVT LTD; Engineer: AJAY T MAHAJAN; Chartered Accountant: DRP & CO LLP; Chartered Accountant: CA Niraj V Nawandhar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIDORI TOWER PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIDORI TOWER PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIDORI TOWER PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.