Completed No litigation declared Commercial project

Menlo Business Hub

By MENLO REALTY LLP

RG-MH-15266 · RERA P52100023185 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
145 of 146Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

Menlo Business Hub is a Commercial project by MENLO REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100023185 on 5 Dec 2019. The registration is recorded completed; possession was promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 1 of the 146 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameMenlo Business Hub
  • TypeCommercial
  • Location
    • Pune Nagar Road
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023185
  • ReraGenie IDRG-MH-15266

Builder

  • NameMENLO REALTY LLP
  • Entity typePartnership
  • Authorized SignatoryAAKASH PRAKASH CHORDIA CHORDIA
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2019First promiseDec 2023Revised toDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Dec 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed161 files

Current status

1%1 of 146 units booked
48.6%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA10100146146

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

C: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed186

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots186
Closed/Covered186

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,893 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Aug 2025
LandownerVillageDistrict
Krisan Alais Krishna Vitthal DbhadeWAGHOLIPune
Balasaheb Vitthal DabhadeWAGHOLIPune
Ashwini Dinkar DabhadeWAGHOLIPune
Indubai Vitthal DabhadeWAGHOLIPune
Nana Alias Vitthal Genu DabhadeWAGHOLIPune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI6356.74
Proposed, not sanctioned6,357 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 12,13,14, SUKHWANI PACIFIC PHASE2, S NO 31 OPP ADITYA BIRLA HOSPITAL,PUNE 411033
Estimated costRs 16.05 cr
Cost incurredRs 7.80 cr
Work done48.6%
BuildingWingEstimatedIncurred
CNARs 16.05 crRs 7.80 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectInsignis Architecture
EngineerShirish Raut
EngineerPramod Sarode
Chartered AccountantManish Pokharana and Associates
Chartered AccountantAgrawal Oswal And Associates
PartnerRole in project
MENLO REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08082502345Dec 2023 → Dec 2027

Reason as filed by the promoterIn response to market demand, we initiated the revision of the originally sanctioned plan to incorporate the construction of four additional floors, along with a revised layout for the fourth floor, increasing the total number of units on that floor to eight. The revised Commencement Certificate and sanctioned plan were issued on 29/10/2024. As we now intend to commence construction of the additional floors, we respectfully request an extension of the project timeline to enable us to apply for the corresponding change in FSI on the MahaRERA portal.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Sep 2023

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A C BLDG.pdf22 Apr 2026
Withdrawal Update Form 1File: Architect Certificate C wing 31032026.pdf21 Apr 2026
Withdrawal Update Form 2File: C Building Engineer Certificate Q4.pdf21 Apr 2026
Withdrawal Update Form 3File: MENLO C BUILDING-Q4-25-26 (1).pdf21 Apr 2026
Withdrawal Update Form 1File: Architect Certificate C wing q3.pdf17 Jan 2026
Withdrawal Update Form 1File: Architect Certificate C wing q3.pdf17 Jan 2026
Withdrawal Update Form 2File: C Bldg Engineer Certificate 30092025.pdf17 Jan 2026
Withdrawal Update Form 2File: C Engineer Certificate.pdf17 Jan 2026
Withdrawal Update Form 3File: MENLO C BUILDING-Q3-25-26.pdf17 Jan 2026
Withdrawal Update Form 3File: MENLO C BUILDING-Q3-25-26.pdf17 Jan 2026
Withdrawal Update Form 1File: Architect Certificate C Wing..pdf14 Oct 2025
Withdrawal Update Form 1File: Architect Certificate C Wing..pdf14 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate Menlo Realty LLP C bldg Q1 2526.pdf14 Oct 2025
Withdrawal Update Form 2File: C Bldg Engineer Certificate 30092025.pdf14 Oct 2025
Withdrawal Update Form 3File: MENLO C BUILDING-Q2-25-26.pdf14 Oct 2025
Withdrawal Update Form 3File: MENLO C BUILDING-Q2-25-26.pdf14 Oct 2025
Layout approvalFile: Layout highlighted.pdf1 Sep 2025
Building plan approvalFile: Parking.pdf1 Sep 2025
Building plan approvalFile: Bldg C (2) Copy.pdf1 Sep 2025
Building plan approvalFile: Bldg C.pdf1 Sep 2025
Layout approvalFile: Layout highlighted.pdf1 Sep 2025
Building plan approvalFile: Bldg C (2) Copy.pdf1 Sep 2025
Building plan approvalFile: Bldg C.pdf1 Sep 2025
Building plan approvalFile: Parking.pdf1 Sep 2025
Form 5 (FY 2024-2025)File: 2024-25-FORM 5.pdf30 Aug 2025
Form 1File: Architect Certificate C wing.pdf29 Aug 2025
Form 2File: ENGINEER CERTIFICATE C BLDG.pdf29 Aug 2025
Form 3File: Form 3 C wing Q4-23-24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold format Menlo realty LLP C wing.pdf29 Aug 2025
Form 1File: Architect Certificate C wing Q1 2425.pdf29 Aug 2025
Form 2File: Engineer Form 2, C Bldg Q1 2425.pdf29 Aug 2025
Form 3File: FORM 3 C wing.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold format Menlo realty LLP C wing.pdf29 Aug 2025
Form 1File: Architect Certificate C bldg.pdf29 Aug 2025
Form 2File: Engineer certificate Menlo c bldg.pdf29 Aug 2025
Form 3File: Form 3.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold format Menlo realty LLP C wing.pdf29 Aug 2025
Form 1File: Architect Certificate C wing Q3 2425.pdf29 Aug 2025
Form 2File: Engineer certificate C wing Q3 2425.pdf29 Aug 2025
Form 3File: Form 3 C wing.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold format Menlo realty LLP C wing.pdf29 Aug 2025
Form 1File: Architect Certificate C wing Q4 2425.pdf29 Aug 2025
Form 2File: engineer certificate C Wing Q4 2425.pdf29 Aug 2025
Form 3File: Form 3 C wing.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold format Menlo realty LLP C wing.pdf29 Aug 2025
Withdrawal Update Form 1File: Architect Certificate B wing Q1 2526.pdf29 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate Menlo Realty LLP C bldg Q1 2526.pdf29 Aug 2025
Withdrawal Update Form 3File: Form3 Change in Cost.pdf29 Aug 2025
Form 2A (FY 2024-2025)File: Menlo Hub 2024-2025.pdf29 Aug 2025
Withdrawal Update Form 1File: Architect Certificate dec2022 Business HUB.pdf21 Aug 2025
Withdrawal Update Form 2File: Engg Dec2022 Business HUB_compressed.pdf21 Aug 2025
Withdrawal Update Form 3File: Form3 Change in Cost.pdf21 Aug 2025
Withdrawal Update Form 1File: Architect Certificate dec2022 Business HUB.pdf20 Aug 2025
Withdrawal Update Form 2File: Engg Dec2022 Business HUB_compressed.pdf20 Aug 2025
Withdrawal Update Form 3File: Form 03 Final.pdf20 Aug 2025
Layout approvalFile: Layout 2021.pdf18 Aug 2025
Building plan approvalFile: 06 Building C Floor Plan.pdf18 Aug 2025
Building plan approvalFile: 07 Building C Floor Plan.pdf18 Aug 2025
Form 2A (FY 2019-2020)File: menlo Business Hub -2019-2020.pdf8 Aug 2025
Form 2A (FY 2020-2021)File: menlo Business Hub -2020-2021.pdf8 Aug 2025
Form 2A (FY 2021-2022)File: menlo Business Hub -2021-2022.pdf8 Aug 2025
Form 2A (FY 2022-2023)File: menlo Business Hub -2022-2023.pdf8 Aug 2025
Form 2A (FY 2023-2024)File: menlo Business Hub -2023-2024.pdf8 Aug 2025
Form 5 (FY 2019-2020)File: Form 5 19-20.pdf8 Aug 2025
Form 5 (FY 2020-2021)File: Form 5 20-21.pdf8 Aug 2025
Form 5 (FY 2021-2022)File: Form 5 21-22.pdf8 Aug 2025
Form 5 (FY 2022-2023)File: FORM 5 C wing 22-23.pdf8 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5-23-24 C wing menlo realty llp.pdf8 Aug 2025
Form 1File: Architect Certificate C wing Q2 2324.pdf7 Aug 2025
Form 2File: Engineer Form 2, C Bldg - Q 2324.pdf7 Aug 2025
Form 3File: Form 3 C wing.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold format Menlo realty LLP C wing Q1.pdf7 Aug 2025
Form 1File: Architect Certificate C wing Q2 2324.pdf7 Aug 2025
Form 2File: eng Certificate C BLDG Q 2324.pdf7 Aug 2025
Form 3File: FORM 3-Q2-23-24-1 C wing.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold C wing Q2 2324.pdf7 Aug 2025
Form 1File: Architect Certificate C wing.pdf7 Aug 2025
Form 2File: Menlo realty C Bldg Engineer certificate.pdf7 Aug 2025
Form 3File: Form 3 C wing Q3-23-24.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: C wing sold unsold.pdf7 Aug 2025

How this compares with Pune

1%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Menlo Business Hub on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmMenlo Business HubCompleted 52Lapsed / revoked 28Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 119 registered projects within 2 km.

Builder: MENLO REALTY LLP

MENLO REALTY LLP has 4 registrations on MahaRERA, including Menlo Homes Kharadi Next Phase I and Menlo Business Hub. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Menlo Business Hub is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Menlo Business Hub?

The registered promoter entity is MENLO REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Menlo Business Hub?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Menlo Business Hub?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Menlo Business Hub?

The professionals named in the filing: Architect: Insignis Architecture; Engineer: Shirish Raut; Engineer: Pramod Sarode; Chartered Accountant: Manish Pokharana and Associates; Chartered Accountant: Agrawal Oswal And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Menlo Business Hub?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Menlo Business Hub. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Menlo Business Hub to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.