Mellennium Dreams
RG-MH-05800 · RERA P51700051350 · Last updated on MahaRERA portal: 18 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 10 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mellennium Dreams is a Residential / Group Housing project by Mellennium Dreams in Thane, Maharashtra, registered with MahaRERA as P51700051350 on 8 Jun 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 10 months from the original filing. 25 of the 97 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.
At a glance
Project
- NameMellennium Dreams
- TypeResidential / Group Housing
- Location
- Mahatma Phule Road
- Dombivli
- Kalyan
- Thane
- 421202
- Pincode421202
- RERA no.P51700051350
- ReraGenie IDRG-MH-05800
Builder
- NameMellennium Dreams
- Entity typePartnership
- PartnersSamir Dasharath Deshmukh, Vasant Amruta Kanchar, Vinay Ramchandra Deshmukh, Prasad Sudhakar Deshmukh, Priyanka Vishal Patil, Komal Kashinath Patil, Satish Vishnu Biwalkar, Milind Deshmukh
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 May 2026)
- Buildings2 building records
- Documents filed90 files
Current status
Figures as on 18 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building no 1 | NA | 14 | 14 | 61 | 8 | 69 |
| Building No 2 | NA | 9 | 0 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.
Building no 165%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Building No 277%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed123
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building no 1 | 86 | 86 |
| Building No 2 | 37 | 37 |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Prakash Krishnaji Khismatrao | DOMBIVLI | Thane |
| New Gandharva Co-operative Housing Society Limited | DOMBIVLI | Thane |
| Nav Sammruddha Darshan Co-Op Hsg Soc Ltd | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building no 1 | NA | Rs 12.20 cr | Rs 11.00 cr |
| Building No 2 | NA | Rs 4.50 cr | Rs 3.69 cr |
| - | NA | Rs 2.73 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rachana Shilp |
| Engineer | Rajesh Thakare and associates |
| Engineer | Mehul Gambhirrao |
| Chartered Accountant | Kapure and Kapure |
| Chartered Accountant | NAVAL KARNIK & CO. |
| Partner | Role in project |
|---|---|
| Mellennium Dreams | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere were certain development control rules which allowed incentivized FSI for redevelopment of those building which are more than 30 years old. As per the prevalent development control rules at the time of the sanction of Commencement Certificate , the promoter got the plan sanctioned from the Competent Authority that is Kalyan Dombivli Municipal Corporation. Interestingly, at the time of grant of Occupancy Certificate, Kalyan Dombivli Municipal Corporation stopped giving incentivized FSI to those buildings which are 30 years old and accordingly stopped giving incentivized FSI to the new pro
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Mellennium Dreams June 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Mellennium Dreams June 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Mellennium Dreams June 26-compressed.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 MD.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Millenium Dreams.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Mellennium Dreams - Mar 26_compressed.pdf | 20 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - Mellennium Dreams.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Mellennium Dreams - Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Mellenium Dreams - Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Mellenium Dreams - Dec 25_compressed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Mellenium Dreams - Form 1.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 - Mellenium Dreams.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: mellenium Dreams - Form 2.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 - Mellenium Dreams.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: Mellenium Dreams - Form 3_compressed.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Mellennium Dreams - Sept 25_compressed.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Mellenium Dreams - Form 1.pdf | 7 Aug 2025 |
| Withdrawal Update Form 1File: Mellenium Dreams - Form 1.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: mellenium Dreams - Form 2.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: mellenium Dreams - Form 2.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Mellenium Dreams - Form 3_compressed.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Mellenium Dreams - Form 3_compressed.pdf | 7 Aug 2025 |
| Form 1File: Form 1 - Mellenium Dreams - March 25.pdf | 14 Jul 2025 |
| Form 2File: Form 2.pdf | 14 Jul 2025 |
| Form 3File: Signed Form 3 - Mellenium Dreams - March 25_compressed.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Mellenium Dreams - March 25.pdf | 14 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mellenium Dreams - March 25.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - Mellenium Dreams - March 25_compressed.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Mellenium Dreams - March 25.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellenium Dreams - Form 1.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mellennium Dreams_compressed.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Mellenium Dreams - Disclosure.pdf | 19 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mellennium Dreams.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellennium Dreams - Arch Sep - 2024.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Dreams - Form 3_compressed.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Dreams - Engg Sep - 2024.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Mellennium Dreams - Disclosure Sept 2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Cert June 24 - Mellennium Dreams.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert June 24 - Mellennium Dreams.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Dreams_compressed.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assuarance - Mellennium Dreams - 2024.pdf | 14 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Mellennium Dreams 05-04-24.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Dreams - Engg Cert Mar-24.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Mar-24 - Mellennium Dreams.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Dreams - Signed form 3_compressed.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Dreams Engg Cert 2023.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Mellennium Dreams Flat Inventory.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Dreams - Form 3_compressed.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellennium Dreams Dec ArchCert.pdf | 14 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellennium Dreams - Architect.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Dreams - Engg.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Mellennium Dreams Sep 23_compressed.pdf | 18 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Mellennium Dreams - Finance_revised.pdf | 26 May 2023 |
| Details of encumbrances concerned to LegalFile: Mellennium Dreams - Finance_revised.pdf | 26 May 2023 |
| CERSAI detailsFile: Mellennium Dreams - CERSAI.pdf | 26 May 2023 |
| Layout approvalFile: Plan 1.pdf | 5 May 2023 |
| Layout approvalFile: Plan 2.pdf | 5 May 2023 |
| Layout approvalFile: Plan 3.pdf | 5 May 2023 |
| Layout approvalFile: Plan 4.pdf | 5 May 2023 |
| Building plan approvalFile: Plan 1.pdf | 5 May 2023 |
| Building plan approvalFile: Plan 2.pdf | 5 May 2023 |
| Building plan approvalFile: Plan 3.pdf | 5 May 2023 |
| Building plan approvalFile: Plan 4.pdf | 5 May 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 5 May 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 2.pdf | 5 May 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 3.pdf | 5 May 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 4.pdf | 5 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 5 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 5 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 5 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 5 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 5 May 2023 |
| Proforma of Allotment letterFile: Millennium Dreams - Allotment Letter.pdf | 5 May 2023 |
| PAN CardFile: Pan Card.pdf | 4 May 2023 |
| Copy of the legal title reportFile: Title - Mellenium Dreams_.pdf | 4 May 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of legal .pdf | 4 May 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of legal .pdf | 4 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_.pdf | 4 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mellennium Dreams on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivli7,600+ in Thane
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: Mellennium Dreams
Mellennium Dreams has 1 registration on MahaRERA, including Mellennium Dreams. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mellennium Dreams is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mellennium Dreams?
The registered promoter entity is Mellennium Dreams, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mellennium Dreams?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mellennium Dreams?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mellennium Dreams?
The professionals named in the filing: Architect: Rachana Shilp; Engineer: Rajesh Thakare and associates; Engineer: Mehul Gambhirrao; Chartered Accountant: Kapure and Kapure; Chartered Accountant: NAVAL KARNIK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mellennium Dreams?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback