Megapolis Serenity A1 to A7, B1 and Conv shop A
By Pegasus Properties Pvt. Ltd.
RG-MH-14565 · RERA P52100023051 · Last updated on MahaRERA portal: 12 Jan 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Megapolis Serenity A1 to A7, B1 and Conv shop A is a Others project by Pegasus Properties Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100023051 on 22 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2025. 622 of the 622 units on this registration are recorded sold or booked, and 76 of 99 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMegapolis Serenity A1 to A7, B1 and Conv shop A
- TypeOthers
- Location
- MIDC Road
- Rajiv Gandhi Infotech Park Phase 3
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100023051
- ReraGenie IDRG-MH-14565
Builder
- NamePegasus Properties Pvt. Ltd.
- Entity typeCompany
- CINU70102PN2007FTC129540
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorManoj Praveenchandra Shah
- DirectorYogesh Yashwant Bhave
- Other registrations16 more →
- Completed13 of 17
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects13 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Nov 2019
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings9 building records
- Documents filed129 files
Current status
Figures as on 12 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 | NA | 20 | 19 | 76 | 0 | 76 |
| A2 | NA | 20 | 19 | 76 | 0 | 76 |
| A3 | NA | 20 | 19 | 76 | 0 | 76 |
| A4 | NA | 20 | 19 | 76 | 0 | 76 |
| A5 | NA | 20 | 19 | 76 | 0 | 76 |
| A6 | NA | 20 | 19 | 76 | 0 | 76 |
| A7 | NA | 20 | 19 | 76 | 0 | 76 |
| B1 | NA | 19 | 19 | 72 | 0 | 72 |
| Conv shop A | NA | 1 | 1 | 0 | 18 | 18 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 12 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
76 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Basement (if any), at 0%.
A173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Conv shop A55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed604
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A1 | 76 | 76 |
| A2 | 76 | 76 |
| A3 | 76 | 76 |
| A4 | 76 | 76 |
| A5 | 76 | 76 |
| A6 | 76 | 76 |
| A7 | 76 | 76 |
| B1 | 72 | 72 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 38.50 cr | Rs 38.50 cr |
| A1 | NA | Rs 18.24 cr | Rs 18.24 cr |
| A2 | NA | Rs 18.24 cr | Rs 18.24 cr |
| A6 | NA | Rs 18.24 cr | Rs 18.24 cr |
| A7 | NA | Rs 18.24 cr | Rs 18.24 cr |
| B1 | NA | Rs 17.28 cr | Rs 17.28 cr |
| A3 | NA | Rs 17.22 cr | Rs 17.22 cr |
| A4 | NA | Rs 17.22 cr | Rs 17.22 cr |
| A5 | NA | Rs 17.22 cr | Rs 17.22 cr |
| Conv shop A | NA | Rs 2.71 cr | Rs 2.71 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Anil Madhusudan Kulkarni |
| Engineer | Suneel Kulkarni |
| Chartered Accountant | Supriya Mundada |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Pegasus Properties Pvt. Ltd. | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 691/2022 | Civil Judge Senior Division Pune | Ongoing |
| 691/2022 | Senior Division | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502825 | Pegasus Properties Pvt. Ltd. | Ashish Kumar Trivedi and Divya Trivedi | 12/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Jun 2024
Documents filed129
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: 251222_Eng Certificate.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: 260106_CA Certificate.pdf | 12 Jan 2026 |
| Occupational CertificateFile: 260106_CA Certificate.pdf | 12 Jan 2026 |
| Occupational CertificateFile: 1_Ar Certificate.pdf | 9 Jan 2026 |
| Occupational CertificateFile: 1_Ar Certificate.pdf | 23 Dec 2025 |
| Occupational CertificateFile: 251222_Eng Certificate.pdf | 23 Dec 2025 |
| Layout approvalFile: Layout.pdf | 11 Dec 2025 |
| Building plan approvalFile: 13_Building Plan_1.pdf | 11 Dec 2025 |
| Building plan approvalFile: 13_Building Plan_2.pdf | 11 Dec 2025 |
| Building plan approvalFile: 13_Building Plan_3_B1 B2.pdf | 11 Dec 2025 |
| Building plan approvalFile: 13_Building Plan_4_Conv Shop.pdf | 11 Dec 2025 |
| Occupational CertificateFile: 251208_OC Verification.pdf | 11 Dec 2025 |
| Occupational CertificateFile: Area statement.pdf | 11 Dec 2025 |
| Occupational CertificateFile: 240531_OC_A3 to A7 B1 shop.pdf | 22 Nov 2025 |
| Occupational CertificateFile: 251120_OC_A1 & A2.pdf | 22 Nov 2025 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA certificate_compressed (3).pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Serenity A1 to A7_Signed.pdf | 23 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory_compressed.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 19 Apr 2025 |
| Copy of the legal title reportFile: 8_250318_Supplementary Title.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory_Compressed.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_Compressed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate Compressed.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certifcate.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: M_Serenity - A1 to A7 B1 and Conv Shop A.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory_Serenity A1 - A7.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate (1).pdf | 20 Jul 2024 |
| Proforma of Agreement for saleFile: 240617_AFS_Ready Possesion.pdf | 20 Jun 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240531_OC_A3 to A7 B1 shop.pdf | 1 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: M_Serenity A1 to A7, B1 and Conv Shop A_compressed-compressed.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| CERSAI detailsFile: M_Serenity A1 to A7, B1 and Conv Shop A_compressed-compressed.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: M_Serenity A1 to A7, B1 and Conv Shop A_compressed-compressed.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240302_Decl about Grievance.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: M_Serenity A1 to A7, B1 and Conv Shop A (1).pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Oct 2023 |
| Copy of the legal title reportFile: 2_Legal Title Report_5.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 33_M_Serenity-A1-A7_B1_Conv Shop A.pdf | 30 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: 230822_Encumbrance Certificate _Legal.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 230822_Encumbrance_Legal.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 230822_Encumbrance_Finance.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 230822_Encumbrance Certificate _Legal.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 230822_Encumbrance_Legal.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 230822_Encumbrance_Finance.pdf | 23 Aug 2023 |
| Declaration in FORM BFile: 230822_Form B.pdf | 23 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: M_Serenity A1 to A7, B1 and Conv Shop A.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5_Form 2A.pdf | 24 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: M_Serenity A1 to A7, B1 and Conv Shop A_2.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 21 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: M_Serenity A1 to A7, B1 and Conv Shop A.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Q End Jun 22.pdf | 17 Jan 2023 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Megapolis Saffron - Shops | Hinjewadi | 33 | Completed | Dec 2024 | Apr 2024 |
| Megapolis Saffron -A3 to A9 | Hinjewadi | 380 | Completed | Jun 2024 | May 2024 |
| Megapolis Springs - A | Hinjewadi | 52 | Completed | Mar 2024 | Oct 2023 |
| Megapolis Springs - B and F | Hinjewadi | 156 | Completed | Mar 2023 | Nov 2022 |
| Megapolis Springs - C | Hinjewadi | 52 | Completed | May 2022 | Sep 2021 |
| Megapolis springs - D and E | Hinjewadi | 156 | Completed | Apr 2022 | Sep 2021 |
| Megapolis Symphony Phase I | Hinjewadi | 294 | Completed | Jan 2022 | Sep 2020 |
| Megapolis Mystic Phase II | Hinjewadi | 214 | Completed | Mar 2020 | Jun 2019 |
| Megapolis Mystic - C | Hinjewadi | 86 | Completed | Dec 2019 | Nov 2019 |
| Sangria | Hinjewadi | 1,075 | Completed | Oct 2015 | Feb 2015 |
| Splendor | Hinjewadi | 1,176 | Completed | Mar 2015 | Late, Nov 2015 |
| Sunway | Hinjewadi | 1,176 | Completed | Jul 2013 | Late, May 2014 |
| Sparklet | Hinjewadi | 1,184 | Completed | Mar 2013 | Late, Apr 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 16 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 129 filed documents as one ZIP, foldered, with a manifest
Keep Megapolis Serenity A1 to A7, B1 and Conv sho on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Rajiv Gandhi Infotech Park Phase 313,700+ in Pune
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Pegasus Properties Pvt. Ltd.
Pegasus Properties Pvt. Ltd. has 17 registrations on MahaRERA, including Megapolis Symphony Phase I and Megapolis Mystic Phase 2. Its filings disclose 13 earlier MahaRERA projects: declares 10 of 13 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Megapolis Serenity A1 to A7, B1 and Conv shop A is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Megapolis Serenity A1 to A7, B1 and Conv shop A?
The registered promoter entity is Pegasus Properties Pvt. Ltd., a company as per the filing. Its CIN U70102PN2007FTC129540 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Megapolis Serenity A1 to A7, B1 and Conv shop A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Megapolis Serenity A1 to A7, B1 and Conv shop A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Megapolis Serenity A1 to A7, B1 and Conv shop A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Megapolis Serenity A1 to A7, B1 and Conv shop A?
The professionals named in the filing: Architect: Ar Anil Madhusudan Kulkarni; Engineer: Suneel Kulkarni; Chartered Accountant: Supriya Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Megapolis Serenity A1 to A7, B1 and Conv shop A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback