Home / Browse projects / Pune, Maharashtra / Megapolis Saffron - A10 to A14
Megapolis Saffron - A10 to A14
By Pegasus Properties Pvt. Ltd.
RG-MH-12950 · RERA P52100021609 · Last updated on MahaRERA portal: 4 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Megapolis Saffron - A10 to A14 is a Residential / Group Housing project by Pegasus Properties Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100021609 on 15 Jul 2019. The registration is recorded completed; possession was promised by 30 Sep 2024.
At a glance
Project
- NameMegapolis Saffron - A10 to A14
- TypeResidential / Group Housing
- Location
- MIDC Road
- Rajiv Gandhi Infotech Park Phase 3
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021609
- ReraGenie IDRG-MH-12950
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2019
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings5 building records
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A10 | NA | 14 | 0 | 0 | 0 | 0 |
| A11 | NA | 14 | 0 | 0 | 0 | 0 |
| A12 | NA | 14 | 0 | 0 | 0 | 0 |
| A13 | NA | 15 | 0 | 0 | 0 | 0 |
| A14 | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 4 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
49 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
A1091%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A1191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A1290%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A1391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A1491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed406
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A10 | 52 | 52 |
| A11 | 52 | 52 |
| A12 | 78 | 78 |
| A13 | 112 | 112 |
| A14 | 112 | 112 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Anil Madhusudan Kulkarni |
| Engineer | Suneel Kulkarni |
| Chartered Accountant | Supriya Mundada |
| Partner | Role in project |
|---|---|
| Pegasus Properties Pvt. Ltd. | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 691/2022 | Civil Judge Senior Division Pune | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jul 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Oct 2024
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: 240827_Form 4.pdf | 4 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: M_Saffron - A10 to A14.pdf | 17 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 240827_Form 4.pdf | 14 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 231027_OC_A13.pdf | 14 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 231222_OC_A14.pdf | 17 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240816_OC_A12.pdf | 17 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240307_Part OC_ OC_A10 A11.pdf | 17 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold Inventory_Saffron A10 - 14.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate (2).pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold Inventory.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240302_Decl about Grievance Redressal Cell.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory_compressed.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: M_Saffron A10 to A14.pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 19 Oct 2023 |
| Copy of the legal title reportFile: 2_Legal Title Report_5.pdf | 7 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 30_M_Saffron-A10-A14.pdf | 2 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: 230822_Encumbrance Certificate _Legal.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 230822_Encumbrance Certificate_Finance.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 230822_Encumbrance Certificate _Legal.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 230822_Encumbrance Certificate_Finance.pdf | 23 Aug 2023 |
| Declaration in FORM BFile: 230822_Form B.pdf | 23 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: M_Saffron A10 to A14.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5_Form 2A.pdf | 24 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: M_Saffron A10 to A14_2.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Jan 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate.pdf | 21 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: M_Saffron A10 to A14.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 17 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 17 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 17 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 17 Jan 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate_1.pdf | 17 Jan 2023 |
| Certificates of CA (Form 3)File: 3_CA Certificate_2.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: M_Saffron A10 to A14.pdf | 19 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 30_M_Saffron-A10-A14.pdf | 3 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: M_Saffron A10 to A14_Disclosure of Sold Inventory.pdf | 21 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5_Form 2A_Quality Certificate.pdf | 13 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Megapolis Saffron A10 to A14_compressed.pdf | 13 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 7 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 7 Apr 2022 |
| Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: 220125_Megapolis Saffron A10 to A14_Disclosure of Sold Inventory.pdf | 24 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 22 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 22 Jan 2022 |
| Certificates of CA (Form 3)File: Saffron A10 to A14-Dec 21_compressed.pdf | 22 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Megapolis Saffron A10 to A14_Disclosure of Sold Inventory.pdf | 29 Oct 2021 |
| Declaration about Commencement CertificateFile: 30_Megapolis Saffron - A10 to A14.pdf | 7 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 7 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 5_Saffron - A10 to A14_Form 2A.pdf | 7 Oct 2021 |
| Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Saffron - A10 to A14.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 30_Megapolis Saffron - A10 to A14_compressed.pdf | 21 Dec 2020 |
| Copy of the legal title reportFile: 200804_Continuation Title Opinion.pdf | 6 Aug 2020 |
| Declaration in FORM BFile: 6_191224_A10 to A14_Form B_Declaration.pdf | 24 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 11_190709_Commencement Certificate_R1.pdf | 9 Jul 2019 |
| Building plan approvalFile: 13_190611_Building Plans_A10 A11.pdf | 6 Jul 2019 |
| Building plan approvalFile: 13_190611_Building Plans_A12.pdf | 6 Jul 2019 |
| Building plan approvalFile: 13_190611_Building Plans_A13 A14.pdf | 6 Jul 2019 |
| Layout approvalFile: 4_190611_Layout.pdf | 6 Jul 2019 |
| PAN CardFile: 1_Pan Card.pdf | 6 Jul 2019 |
| Copy of the legal title reportFile: 2_Legal Title Report_1.pdf | 6 Jul 2019 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Megapolis Saffron - Shops | Hinjewadi | 33 | Completed | Dec 2024 | Apr 2024 |
| Megapolis Saffron -A3 to A9 | Hinjewadi | 380 | Completed | Jun 2024 | May 2024 |
| Megapolis Springs - A | Hinjewadi | 52 | Completed | Mar 2024 | Oct 2023 |
| Megapolis Springs - B and F | Hinjewadi | 156 | Completed | Mar 2023 | Nov 2022 |
| Megapolis Springs - C | Hinjewadi | 52 | Completed | May 2022 | Sep 2021 |
| Megapolis springs - D and E | Hinjewadi | 156 | Completed | Apr 2022 | Sep 2021 |
| Megapolis Symphony Phase I | Hinjewadi | 294 | Completed | Jan 2022 | Sep 2020 |
| Megapolis Mystic Phase II | Hinjewadi | 214 | Completed | Mar 2020 | Jun 2019 |
| Megapolis Mystic - C | Hinjewadi | 86 | Completed | Dec 2019 | Nov 2019 |
| Sangria | Hinjewadi | 1,075 | Completed | Oct 2015 | Feb 2015 |
| Splendor | Hinjewadi | 1,176 | Completed | Mar 2015 | Late, Nov 2015 |
| Sunway | Hinjewadi | 1,176 | Completed | Jul 2013 | Late, May 2014 |
| Sparklet | Hinjewadi | 1,184 | Completed | Mar 2013 | Late, Apr 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 16 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
Keep Megapolis Saffron - A10 to A14 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Rajiv Gandhi Infotech Park Phase 313,700+ in Pune
Filed coordinates, straight-line distance. 56 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Pegasus Properties Pvt. Ltd.
Pegasus Properties Pvt. Ltd. has 17 registrations on MahaRERA, including Megapolis Symphony Phase I and Megapolis Mystic Phase 2. Its filings disclose 13 earlier MahaRERA projects: declares 10 of 13 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Megapolis Saffron - A10 to A14 is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Megapolis Saffron - A10 to A14?
The registered promoter entity is Pegasus Properties Pvt. Ltd., a company as per the filing. Its CIN U70102PN2007FTC129540 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Megapolis Saffron - A10 to A14?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Megapolis Saffron - A10 to A14?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Megapolis Saffron - A10 to A14?
The professionals named in the filing: Architect: Ar Anil Madhusudan Kulkarni; Engineer: Suneel Kulkarni; Chartered Accountant: Supriya Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Megapolis Saffron - A10 to A14?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback