ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Mayuri Tarangan

Registration lapsed No litigation declared Residential / Group Housing project

Mayuri Tarangan

By Aryan Engineers

RG-MH-12449 · RERA P52100012125 · Last updated on MahaRERA portal: 17 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
8 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 50%
3 of 5Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Mayuri Tarangan is a Residential / Group Housing project by Aryan Engineers in Pune, Maharashtra, registered with MahaRERA as P52100012125 on 1 Sep 2017. Possession was promised by 28 Jun 2022 and is now 52 months past that date. The completion date has moved by 42 months from the original filing. 2 of the 5 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMayuri Tarangan
  • TypeResidential / Group Housing
  • Location
    • lohgaon wagholi road
    • pune
    • WAGHOLI
    • Haveli
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012125
  • ReraGenie IDRG-MH-12449

Builder

  • NameAryan Engineers
  • Entity typePartnership
  • GSTIN27AAYFA2063P1ZQ
  • PartnersRavindra Jaykumar Jain, Atul Subhash Parande, Pradeep Shivaji Satav, Anjali Ramesh Pawale

Key dates

52 months past promisethis monthRegisteredSep 2017First promiseDec 2018Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion28 Jun 2022
  • Revised completionRevised to 28 Jun 2022 (originally 30 Dec 2018)
  • Buildings3 building records
  • Documents filed75 files

Current status

40%2 of 5 units booked

Figures as on 17 Dec 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA66505
B wingNA60000
Amenity BuildingNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

A wing45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B wing45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Amenity Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A wing11
B wing11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Ravindra Jaykumar Jain-Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune
Permissible FSI4563.73
Proposed, not sanctioned4,564 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishrantwadi

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSomanth Kerur
EngineerRavindra Jaykumar Jain
Chartered AccountantHemant Shah & Associates
PartnerRole in project
Aryan Engineers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009417Dec 2018 → Mar 2021

Reason as filed by the promoterDue to lockdown

EXT52100009507Dec 2018 → Dec 2021

Reason as filed by the promoterDue to lockdown

EXT52100001675Dec 2018 → Dec 2019

Reason as filed by the promoterPMRDA sanction came out late. Sanction for the floors above till 7th floor came our on 30-8-19. Amenity space has been sanctioned as per the new plan which has to be built from scratch.

Litigation declared1

CaseCourtStatus
1573/2015Civil Judge Senior Division Puneon going case

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12600137Vikas Namdevrao JadhavAryan Engineers08/01/2026
CC12604375Hemant Vasant MehendaleAryan Engineers13/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Affidavit cum declaration.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf17 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf17 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf12 Dec 2024
CERSAI detailsFile: Cersai declaration.pdf12 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf12 Dec 2024
Layout approvalFile: Amenities.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: Amenities.pdf2 Aug 2023
Annual Audit Report of Statutory CA (Form 5)File: form 5.pdf6 Sep 2019
Layout approvalFile: New Doc 2018-09-10 (1).pdf10 Sep 2018
Layout approvalFile: New Doc 2018-09-10 (1).pdf10 Sep 2018
Layout approvalFile: New Doc 2018-09-10 (2).pdf10 Sep 2018
Layout approvalFile: New Doc 2018-09-10_1.pdf10 Sep 2018
Layout approvalFile: 1424.pdf10 Sep 2018
Layout approvalFile: 1424-1.pdf10 Sep 2018
Layout approvalFile: 1424-2.pdf10 Sep 2018
Layout approvalFile: 1424-3.pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: New Doc 2018-09-10 (1).pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: New Doc 2018-09-10 (1).pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: New Doc 2018-09-10 (2).pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: New Doc 2018-09-10_1.pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: 1424.pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: 1424-1.pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: 1424-2.pdf10 Sep 2018
Copy of Layout Approval (in case of layout)File: 1424-3.pdf10 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: 1424 - CC.pdf10 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: p01.pdf20 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: p02.pdf20 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: p03.pdf20 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: p04.pdf20 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: p05.pdf20 Mar 2018
Building plan approvalFile: page 1.pdf1 Aug 2017
Building plan approvalFile: page 2.pdf1 Aug 2017
Building plan approvalFile: page 3.pdf1 Aug 2017
Building plan approvalFile: page 4.pdf1 Aug 2017
Building plan approvalFile: page 5.pdf1 Aug 2017
Layout approvalFile: 2-3.pdf1 Aug 2017
Layout approvalFile: 2-3.pdf1 Aug 2017
Layout approvalFile: 2-3.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: 2-3.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: 2-3.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: 2-3.pdf1 Aug 2017
Building Plan Approval (IOD)File: page 1.pdf1 Aug 2017
Building Plan Approval (IOD)File: page 2.pdf1 Aug 2017
Building Plan Approval (IOD)File: page 3.pdf1 Aug 2017
Building Plan Approval (IOD)File: page 4.pdf1 Aug 2017
Building Plan Approval (IOD)File: page 5.pdf1 Aug 2017
Declaration in FORM BFile: 1.pdf1 Aug 2017
Declaration in FORM BFile: 2.pdf1 Aug 2017
Declaration in FORM BFile: 3.pdf1 Aug 2017
Certificates of CA (Form 3)File: Form 3_CA Certificate_Mayuri Tarangan.pdf1 Aug 2017
Layout approvalFile: 1-3.pdf31 Jul 2017
PAN CardFile: Pan card.pdf31 Jul 2017
Copy of the legal title reportFile: page 1.pdf31 Jul 2017
Copy of the legal title reportFile: page 2.pdf31 Jul 2017
Copy of the legal title reportFile: page 3.pdf31 Jul 2017
Copy of the legal title reportFile: page 4.pdf31 Jul 2017
Copy of the legal title reportFile: page 5.pdf31 Jul 2017
Copy of the legal title reportFile: page 6.pdf31 Jul 2017
Copy of the legal title reportFile: page 7.pdf31 Jul 2017
Copy of the legal title reportFile: page 8.pdf31 Jul 2017
Details of encumbrancesFile: 1.pdf31 Jul 2017
Details of encumbrancesFile: 2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 1-3.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Doc 2017-07-31_1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Doc 2017-07-31_2.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Doc 2017-07-31_3.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Doc 2017-07-31_4.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Doc 2017-07-31_5.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment letter Mayuri Tarangan.pdf31 Jul 2017

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mayuri Tarangan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near pune13,700+ in Pune

2 kmMayuri TaranganCompleted 48Lapsed / revoked 18Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: Aryan Engineers

Aryan Engineers has 1 registration on MahaRERA, including Mayuri Tarangan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Mayuri Tarangan shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Mayuri Tarangan is delayed beyond 28 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mayuri Tarangan?

The registered promoter entity is Aryan Engineers, a partnership as per the filing. Its GSTIN 27AAYFA2063P1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mayuri Tarangan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mayuri Tarangan?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mayuri Tarangan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mayuri Tarangan?

The professionals named in the filing: Architect: Somanth Kerur; Engineer: Ravindra Jaykumar Jain; Chartered Accountant: Hemant Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mayuri Tarangan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mayuri Tarangan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mayuri Tarangan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.