Home / Browse projects / Mayur Kilbil Phase II wing D1 Part V
Mayur Kilbil Phase II wing D1 Part V
RG-MH-35646 · RERA P52100051907 · Last updated on MahaRERA portal: 29 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mayur Kilbil Phase II wing D1 Part V is a Residential / Group Housing project by BUNTY REALTORS in Vishrantwadi, 411015, registered with MahaRERA as P52100051907 on 12 Jul 2023. Possession is promised by 1 Dec 2027. 25 of the 52 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameMayur Kilbil Phase II wing D1 Part V
- TypeResidential / Group Housing
- Location
- Dhanori Road
- Vishrantwadi
- 411015
- Pincode411015
- RERA no.P52100051907
- ReraGenie IDRG-MH-35646
Builder
- NameBUNTY REALTORS
- Entity typePartnership
- PartnersMahendra Ramkarandas Agarwal, Subhash Ramkarandas Agarwal, Sanjay Shamlal Singhal, Ashish Sanjay Singhal, KAPIL DHANRAJ GOYEL, VIKRAM DHANRAJ GOYEL, ANKUSH SURESH GOYEL, SANDEEP SURESH GOYAL, ISHWARDAS DARIYANMAL VALECHA, ASHOK RAMESHWARDAS BANSAL, SANDEEP SHRIKRISHNA GOYAL, RAVINDRA ROSHANLAL AGARWAL and 1 more
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Jul 2023
- Promised completion1 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 29 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing D1 Part V 1st to 9th | NA | 10 | 0 | 52 | 0 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.
Wing D1 Part V 1st to 9th: 17% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 29 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Overall percentage | Yes | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing D1 Part V 1st to 9th | NA | Rs 6.28 cr | Rs 6.99 cr |
| - | NA | Rs 38.00 lakh | Rs 62.01 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Manoj R Agarwal |
| Engineer | Mr Yogesh Vinayak Khedkar |
| Chartered Accountant | Mr Vishnu S Rathi |
| Partner | Role in project |
|---|---|
| BUNTY REALTORS | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1031/2017 | CJSD | awaiting summons |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2027
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: form 1 03 24.pdf | 29 Jul 2025 |
| Form 2File: form 2 03 24.pdf | 29 Jul 2025 |
| Form 3File: form 3 03 24.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory 03 24.pdf | 29 Jul 2025 |
| Form 1File: form 1 06 24.pdf | 29 Jul 2025 |
| Form 2File: form 2 06 24.pdf | 29 Jul 2025 |
| Form 3File: form 3 06 24.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory 06 24.pdf | 29 Jul 2025 |
| Form 1File: form 1 09 24.pdf | 29 Jul 2025 |
| Form 2File: form 2 09 24.pdf | 29 Jul 2025 |
| Form 3File: form 3 09 24.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory 09 24.pdf | 29 Jul 2025 |
| Form 1File: form 1 12 24.pdf | 29 Jul 2025 |
| Form 2File: form 2 12 24.pdf | 29 Jul 2025 |
| Form 3File: form 3 12 24.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory 12 24.pdf | 29 Jul 2025 |
| Form 1File: form 1 03 25.pdf | 29 Jul 2025 |
| Form 2File: form 2 03 25.pdf | 29 Jul 2025 |
| Form 3File: form 3 03 25.pdf | 29 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory 03 25.pdf | 29 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch till Dec 23.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cer till Dec 23.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Cer till Dec 23.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cer.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch Cer.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cer.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cer.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cer.pdf | 4 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Cer.pdf | 4 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Cer.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cer.pdf | 4 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cer.pdf | 4 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank Account for rear estate projects.pdf | 4 Jan 2024 |
| Other - TechnicalFile: Sudesh Agarwal Letter.pdf | 21 Jun 2023 |
| Other - TechnicalFile: New corrected CC 28-4-22 MK-II.pdf | 15 Jun 2023 |
| Other - TechnicalFile: DECLARATION_03-06-2023.pdf | 14 Jun 2023 |
| Declaration about Commencement CertificateFile: FOMAT D COMMENCEMENT CER DECLARATION.pdf | 3 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MK PH-II WING D1 PART V_TILL MARCH-2023-25-05-2023.pdf | 3 Jun 2023 |
| Other - LegalFile: New corrected CC 28-4-22 MK-II.pdf | 3 Jun 2023 |
| Layout approvalFile: 1-1 layout highlight plan.pdf | 30 May 2023 |
| Layout approvalFile: 1-6 layout highlight plan.pdf | 30 May 2023 |
| Copy of Layout Approval (in case of layout)File: 1-1 layout highlight plan.pdf | 30 May 2023 |
| Copy of Layout Approval (in case of layout)File: 1-6 layout highlight plan.pdf | 30 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 14 Mar 2023 |
| Proforma of Agreement for saleFile: FINAL RERA AGREEMENT PART V- 08-03-23.pdf | 8 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO MODEL COPY OF AGREEMENT 8-3-23.pdf | 8 Mar 2023 |
| Copy of the legal title reportFile: Search Report.pdf | 31 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seprate Bank Account.pdf | 4 Jan 2023 |
| Building plan approvalFile: Approved plan 2-6-IV-2nd to 9th.pdf | 17 Dec 2022 |
| Building plan approvalFile: Approved plan 3-6-V-1st to 9th.pdf | 17 Dec 2022 |
| Building plan approvalFile: Approved plan 4-6-I to V-8th.pdf | 17 Dec 2022 |
| Building plan approvalFile: Approved plan 5-6-IV V-9th-ele.pdf | 17 Dec 2022 |
| Building plan approvalFile: Approved plan 6-6-V-sec-terr.pdf | 17 Dec 2022 |
| PAN CardFile: Firm PAN card.pdf | 17 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrances concerned to legal.pdf | 17 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Finance.pdf | 17 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrances concerned to legal.pdf | 17 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrances concerned to Finance.pdf | 17 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved plan 2-6-IV-2nd to 9th.pdf | 17 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved plan 3-6-V-1st to 9th.pdf | 17 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved plan 4-6-I to V-8th.pdf | 17 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved plan 5-6-IV V-9th-ele.pdf | 17 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved plan 6-6-V-sec-terr.pdf | 17 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencemen Certificate.pdf | 17 Dec 2022 |
| Declaration in FORM BFile: Declaration in Form B.pdf | 17 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 17 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MK-II D1 part V.pdf | 17 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A MK-II D1 part V.pdf | 17 Dec 2022 |
| CERSAI detailsFile: CERSAI.pdf | 17 Dec 2022 |
| Proforma of Allotment letterFile: Proforma of Allotment letter.pdf | 17 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter.pdf | 17 Dec 2022 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Mayur Kilbil Phase-II D1 Part III | Plot No B Our of Sr no 2-3 dhanori Tal. Haveli Pune-411015. | 38 | Completed | Mar 2017 | Late, Jul 2018 |
| Mayur Kilbil Phase-II D1 Part I-II | Plot No B Our of Sr no 2-3 dhanori Tal. Haveli Pune-411015. | 81 | Completed | Sep 2016 | Late, Mar 2017 |
| Mayur Kilbil-I | Plot No A Our of Sr no 2-3 dhanori Tal. Haveli Pune-411015. | 253 | Completed | Jun 2012 | Late, Dec 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Mayur Kilbil Phase II wing D1 Part V on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vishrantwadi
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: BUNTY REALTORS
BUNTY REALTORS has 3 registrations on MahaRERA, including Mayur Kilbil Phase II Wing D1 Part III and Mayur Kilbil Phase II - Wing D1 - Part IV. Its filings disclose 8 earlier MahaRERA projects: declares 0 of 8 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Mayur Kilbil Phase II wing D1 Part V is delayed beyond 1 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mayur Kilbil Phase II wing D1 Part V?
The registered promoter entity is BUNTY REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mayur Kilbil Phase II wing D1 Part V?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mayur Kilbil Phase II wing D1 Part V?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mayur Kilbil Phase II wing D1 Part V?
The professionals named in the filing: Architect: Mr Manoj R Agarwal; Engineer: Mr Yogesh Vinayak Khedkar; Chartered Accountant: Mr Vishnu S Rathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mayur Kilbil Phase II wing D1 Part V?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback