Home / Browse projects / Mayur Kilbil Phase II wing D1 Part V

Registered No litigation declared Residential / Group Housing project

Mayur Kilbil Phase II wing D1 Part V

By BUNTY REALTORS

RG-MH-35646 · RERA P52100051907 · Last updated on MahaRERA portal: 29 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: .
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Stilt Floor, 70%
27 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Mayur Kilbil Phase II wing D1 Part V is a Residential / Group Housing project by BUNTY REALTORS in Vishrantwadi, 411015, registered with MahaRERA as P52100051907 on 12 Jul 2023. Possession is promised by 1 Dec 2027. 25 of the 52 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameMayur Kilbil Phase II wing D1 Part V
  • TypeResidential / Group Housing
  • Location
    • Dhanori Road
    • Vishrantwadi
    • 411015
  • Pincode411015
  • RERA no.P52100051907
  • ReraGenie IDRG-MH-35646

Builder

  • NameBUNTY REALTORS
  • Entity typePartnership
  • PartnersMahendra Ramkarandas Agarwal, Subhash Ramkarandas Agarwal, Sanjay Shamlal Singhal, Ashish Sanjay Singhal, KAPIL DHANRAJ GOYEL, VIKRAM DHANRAJ GOYEL, ANKUSH SURESH GOYEL, SANDEEP SURESH GOYAL, ISHWARDAS DARIYANMAL VALECHA, ASHOK RAMESHWARDAS BANSAL, SANDEEP SHRIKRISHNA GOYAL, RAVINDRA ROSHANLAL AGARWAL and 1 more
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredJul 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Jul 2023
  • Promised completion1 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

48%25 of 52 units booked
114.3%Work done, per cost certificate

Figures as on 29 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing D1 Part V 1st to 9thNA10052052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.

Wing D1 Part V 1st to 9th: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor70%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 29 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Overall percentageYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered23
Open Space7

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area605 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025

Approvals and building plan

Sanctioning authorityPUNE MAHANAGARPALIKA
Permissible FSI5149.0
Proposed, not sanctioned3,470 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI PUNE
Estimated costRs 6.66 cr
Cost incurredRs 7.61 cr
Work done114.31%
BuildingWingEstimatedIncurred
Wing D1 Part V 1st to 9thNARs 6.28 crRs 6.99 cr
-NARs 38.00 lakhRs 62.01 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Manoj R Agarwal
EngineerMr Yogesh Vinayak Khedkar
Chartered AccountantMr Vishnu S Rathi
PartnerRole in project
BUNTY REALTORS-

Litigation declared1

CaseCourtStatus
1031/2017CJSDawaiting summons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 03 24.pdf29 Jul 2025
Form 2File: form 2 03 24.pdf29 Jul 2025
Form 3File: form 3 03 24.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory 03 24.pdf29 Jul 2025
Form 1File: form 1 06 24.pdf29 Jul 2025
Form 2File: form 2 06 24.pdf29 Jul 2025
Form 3File: form 3 06 24.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory 06 24.pdf29 Jul 2025
Form 1File: form 1 09 24.pdf29 Jul 2025
Form 2File: form 2 09 24.pdf29 Jul 2025
Form 3File: form 3 09 24.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory 09 24.pdf29 Jul 2025
Form 1File: form 1 12 24.pdf29 Jul 2025
Form 2File: form 2 12 24.pdf29 Jul 2025
Form 3File: form 3 12 24.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory 12 24.pdf29 Jul 2025
Form 1File: form 1 03 25.pdf29 Jul 2025
Form 2File: form 2 03 25.pdf29 Jul 2025
Form 3File: form 3 03 25.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory 03 25.pdf29 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch till Dec 23.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cer till Dec 23.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Cer till Dec 23.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cer.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Arch Cer.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cer.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cer.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cer.pdf4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Cer.pdf4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Cer.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cer.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cer.pdf4 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank Account for rear estate projects.pdf4 Jan 2024
Other - TechnicalFile: Sudesh Agarwal Letter.pdf21 Jun 2023
Other - TechnicalFile: New corrected CC 28-4-22 MK-II.pdf15 Jun 2023
Other - TechnicalFile: DECLARATION_03-06-2023.pdf14 Jun 2023
Declaration about Commencement CertificateFile: FOMAT D COMMENCEMENT CER DECLARATION.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MK PH-II WING D1 PART V_TILL MARCH-2023-25-05-2023.pdf3 Jun 2023
Other - LegalFile: New corrected CC 28-4-22 MK-II.pdf3 Jun 2023
Layout approvalFile: 1-1 layout highlight plan.pdf30 May 2023
Layout approvalFile: 1-6 layout highlight plan.pdf30 May 2023
Copy of Layout Approval (in case of layout)File: 1-1 layout highlight plan.pdf30 May 2023
Copy of Layout Approval (in case of layout)File: 1-6 layout highlight plan.pdf30 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf14 Mar 2023
Proforma of Agreement for saleFile: FINAL RERA AGREEMENT PART V- 08-03-23.pdf8 Mar 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO MODEL COPY OF AGREEMENT 8-3-23.pdf8 Mar 2023
Copy of the legal title reportFile: Search Report.pdf31 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seprate Bank Account.pdf4 Jan 2023
Building plan approvalFile: Approved plan 2-6-IV-2nd to 9th.pdf17 Dec 2022
Building plan approvalFile: Approved plan 3-6-V-1st to 9th.pdf17 Dec 2022
Building plan approvalFile: Approved plan 4-6-I to V-8th.pdf17 Dec 2022
Building plan approvalFile: Approved plan 5-6-IV V-9th-ele.pdf17 Dec 2022
Building plan approvalFile: Approved plan 6-6-V-sec-terr.pdf17 Dec 2022
PAN CardFile: Firm PAN card.pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to legal.pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Finance.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrances concerned to legal.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Finance.pdf17 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 2-6-IV-2nd to 9th.pdf17 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 3-6-V-1st to 9th.pdf17 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 4-6-I to V-8th.pdf17 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 5-6-IV V-9th-ele.pdf17 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 6-6-V-sec-terr.pdf17 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencemen Certificate.pdf17 Dec 2022
Declaration in FORM BFile: Declaration in Form B.pdf17 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MK-II D1 part V.pdf17 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A MK-II D1 part V.pdf17 Dec 2022
CERSAI detailsFile: CERSAI.pdf17 Dec 2022
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf17 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter.pdf17 Dec 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Mayur Kilbil Phase-II D1 Part IIIPlot No B Our of Sr no 2-3 dhanori Tal. Haveli Pune-411015.38CompletedMar 2017Late, Jul 2018
Mayur Kilbil Phase-II D1 Part I-IIPlot No B Our of Sr no 2-3 dhanori Tal. Haveli Pune-411015.81CompletedSep 2016Late, Mar 2017
Mayur Kilbil-IPlot No A Our of Sr no 2-3 dhanori Tal. Haveli Pune-411015.253CompletedJun 2012Late, Dec 2014

Keep Mayur Kilbil Phase II wing D1 Part V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vishrantwadi

Builder: BUNTY REALTORS

BUNTY REALTORS has 3 registrations on MahaRERA, including Mayur Kilbil Phase II Wing D1 Part III and Mayur Kilbil Phase II - Wing D1 - Part IV. Its filings disclose 8 earlier MahaRERA projects: declares 0 of 8 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Mayur Kilbil Phase II wing D1 Part V is delayed beyond 1 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mayur Kilbil Phase II wing D1 Part V?

The registered promoter entity is BUNTY REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mayur Kilbil Phase II wing D1 Part V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mayur Kilbil Phase II wing D1 Part V?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mayur Kilbil Phase II wing D1 Part V?

The professionals named in the filing: Architect: Mr Manoj R Agarwal; Engineer: Mr Yogesh Vinayak Khedkar; Chartered Accountant: Mr Vishnu S Rathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mayur Kilbil Phase II wing D1 Part V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mayur Kilbil Phase II wing D1 Part V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mayur Kilbil Phase II wing D1 Part V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.