Mayur Kilbil Phase II - Wing D1 - Part IV
RG-MH-69326 · RERA P52100019524 · Last updated on MahaRERA portal: 11 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mayur Kilbil Phase II - Wing D1 - Part IV is a Residential / Group Housing project by Bunty Realtors in Vishrantwadi, 411015, registered with MahaRERA as P52100019524 on 6 Feb 2019. Possession was promised by 29 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameMayur Kilbil Phase II - Wing D1 - Part IV
- TypeResidential / Group Housing
- Location
- Dhanori Road
- Vishrantwadi
- 411015
- Pincode411015
- RERA no.P52100019524
- ReraGenie IDRG-MH-69326
Builder
- NameBunty Realtors
- Entity typePartnership
- PartnersMahendra Ramkarandas Agarwal, Subhash Ramkarandas Agarwal, Ishwardas Dariyanmal Valecha, Sanjay Shamlal Singhal, Kapil Dhanraj Goyel, Ashok Rameshwar Bansal, Sandeep Shrikrishna Goyal, Roshanlal Rameshwardas Agarwal, Ashish Sanjay Singhal
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Feb 2019
- Promised completion29 Dec 2025
- Revised completionRevised to 29 Dec 2025 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed158 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing - D1 Part-IV - sanction floor 2nd to 9th floor | NA | 10 | 0 | 0 | 0 | 0 |
| Wing - D1 Part -IV - proposed floor 10th to 13th | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.
Wing - D1 Part-IV - sanction floor 2nd to 9th floor34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 65% |
| Podiums (if any) | 0% |
| Plinth | 65% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing - D1 Part -IV - proposed floor 10th to 13th0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 11 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Overall Percentage | Yes | 7% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Agarwal Consultant |
| Engineer | Rajesh Choudhary |
| Chartered Accountant | Sujit Doshi & Associates |
| Chartered Accountant | Amit Chordia & Co |
| Partner | Role in project |
|---|---|
| Bunty Realtors | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to shortage of matinal and lebour not able to complete project please grant us extension till 29/12/2024
Reason as filed by the promoterDue to Final formation from PMC taking time to get completion the project was not able to get completed in time. We would like to request you to further grant us extension for 12 months i.e dt. 29/12/2025.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1031/2017 | CJSD pune | awaiting summons |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503244 | Poonam Vishal Kore | Bunty Realtors | 12/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed158
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: CA form 3 dec 24.pdf | 6 Mar 2025 |
| Declaration in FORM BFile: FORM B Mayur Kilbil-II D1 Part IV.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng cer till Dec-24 comp.pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclouser of sold-unsold inventory till Dec-24.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 till Dec 24.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer till March 24.pdf | 11 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer till June 24.pdf | 11 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer Dec 24.pdf | 11 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer till Sep 24.pdf | 11 Jan 2025 |
| Certificates of CA (Form 3)File: CA Cer Form 3 Sep 24.pdf | 11 Jan 2025 |
| Certificates of CA (Form 3)File: CA Cer Form 3 March 24.pdf | 11 Jan 2025 |
| Certificates of CA (Form 3)File: CA Cer Form 3 June 24.pdf | 11 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cer till March 24.pdf | 11 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cer till June 24.pdf | 11 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cer till Sep 24.pdf | 11 Jan 2025 |
| OtherFile: Declaration for work completion.pdf | 11 Jan 2025 |
| Form 2AFile: Form 2A June 24.pdf | 11 Jan 2025 |
| Form 2AFile: Form 2A March 24.pdf | 11 Jan 2025 |
| Form 2AFile: Form 2A Sep 24.pdf | 11 Jan 2025 |
| Form 2AFile: Form 2A Dec 24.pdf | 11 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Inventory.pdf | 11 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 24.pdf | 31 Dec 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION OF BUNTY REALTORS.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclouser till Dec 23.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclouser till Dec 23.pdf | 5 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 9 Form 2A.pdf | 28 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCH CER TILL JUNE 2023.pdf | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCH CER TILL SEP 2023.pdf | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ARCH CER TILL DEC 2023.pdf | 27 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng till June 23.pdf | 27 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng till Sep 23.pdf | 27 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng till Dec 23.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Diclouser till June 23.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclouer till Sep 23.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclouser till Dec 23.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Cer till June 23.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Cer till Sep 23.pdf | 27 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Cer till Dec 23.pdf | 27 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate.pdf | 3 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cert.pdf | 1 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 1 Jul 2023 |
| Form 2AFile: Form 2A.pdf | 1 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory till march 23.pdf | 1 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Cert till Dec 22.pdf | 1 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Cert till march 23.pdf | 1 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual report.pdf | 1 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cer till June 22.pdf | 19 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cer till Sept 22.pdf | 19 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cer till Dec 22.pdf | 19 Jun 2023 |
| Proforma of Agreement for saleFile: New FINAL RERA AGREEMENT PART IV- dated 27-3-23.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 1 Mar 2023 |
| Proforma of Agreement for saleFile: New FINAL RERA AGREEMENT PART IV-10-02-23.pdf | 1 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO MODEL COPY OF AGREEMENT part IV.pdf | 1 Mar 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 21 Feb 2023 |
| CERSAI detailsFile: Cersai Certificate.pdf | 10 Feb 2023 |
| OtherFile: Plaint Copy.pdf | 9 Feb 2023 |
| OtherFile: Written Statement.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to legal.pdf | 7 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: SELF DECIARATION REGARDING ENCUMBRANCES.pdf | 7 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to legal.pdf | 7 Feb 2023 |
| Details of encumbrances concerned to LegalFile: SELF DECIARATION REGARDING ENCUMBRANCES.pdf | 7 Feb 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFTCATE.pdf | 7 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account for real estate projects.pdf | 7 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf | 7 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer till June 22.pdf | 28 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer till Sept 22.pdf | 28 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cer till Dec 22.pdf | 28 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cer till Sept 22.pdf | 28 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cer till Dec 22.pdf | 28 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eng Cer till sept 22.pdf | 28 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Eng Cer till Dec 22.pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Cer till March 22.pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Cer till Sept 22.pdf | 28 Jan 2023 |
| Proforma of Allotment letterFile: RERA AGREEMENT PART IV.pdf | 14 Jul 2022 |
| Building plan approvalFile: Approved plan 1-1 layout.pdf | 9 Jul 2022 |
| Building plan approvalFile: Approved plan 1-6 layout.pdf | 9 Jul 2022 |
| Building plan approvalFile: Approved plan 2-6-IV-2nd to 9th.pdf | 9 Jul 2022 |
| Building plan approvalFile: Approved plan 3-6-V-1st to 9th.pdf | 9 Jul 2022 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Mayur Kilbil Phase -II Wing D1 Part III | Plot no. B out of Survey no. 2-3 Dhanori Tal. Haveli pune 411 015 | 38 | Completed | Mar 2017 | Late, Jul 2018 |
| Mayur Kilbil Phase -II Part I and II | Plot no. B out of Survey no. 2-3 Dhanori Tal. Haveli pune 411 015 | 81 | Completed | Sep 2016 | Late, Mar 2017 |
| Mayur Kilbil Phase-I | Plot no. A out of Survey no. 2-3 Dhanori Tal. Haveli pune 411 015 | 253 | Completed | Jun 2012 | Late, Dec 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 158 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Mayur Kilbil Phase II - Wing D1 - Part IV on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vishrantwadi
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: Bunty Realtors
BUNTY REALTORS has 3 registrations on MahaRERA, including Mayur Kilbil Phase II Wing D1 Part III and Mayur Kilbil Phase II - Wing D1 - Part IV. Its filings disclose 8 earlier MahaRERA projects: declares 0 of 8 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that Mayur Kilbil Phase II - Wing D1 - Part IV shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Mayur Kilbil Phase II - Wing D1 - Part IV is delayed beyond 29 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mayur Kilbil Phase II - Wing D1 - Part IV?
The registered promoter entity is Bunty Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mayur Kilbil Phase II - Wing D1 - Part IV?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mayur Kilbil Phase II - Wing D1 - Part IV?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Mayur Kilbil Phase II - Wing D1 - Part IV?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mayur Kilbil Phase II - Wing D1 - Part IV?
The professionals named in the filing: Architect: Agarwal Consultant; Engineer: Rajesh Choudhary; Chartered Accountant: Sujit Doshi & Associates; Chartered Accountant: Amit Chordia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mayur Kilbil Phase II - Wing D1 - Part IV?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback