Registered Litigation declared Residential / Group Housing project

MAULI DESIRE

By MAULI SAI DEVELOPERS PVT LTD

RG-MH-11059 · RERA P51800001946 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 8 cases
  • 6 complaints at MahaRERA
  • Completion date moved by 113 months
  • 5 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 113 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
86 of 152Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

MAULI DESIRE is a Residential / Group Housing project by MAULI SAI DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001946 on 29 Jul 2017. Possession is promised by 29 Jun 2028. The completion date has moved by 113 months from the original filing. 66 of the 152 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameMAULI DESIRE
  • TypeResidential / Group Housing
  • Location
    • DAFTARY ROAD
    • PRATAP NAGAR
    • MALAD EAST
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001946
  • ReraGenie IDRG-MH-11059

Builder

  • NameMAULI SAI DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU45201MH2004PTC144062
  • GSTIN27AAECM0577F1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorSUNIL TUKARAM BHARADKAR
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJan 2019Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2017
  • Promised completion29 Jun 2028
  • Revised completionRevised to 29 Jun 2028 (originally 31 Jan 2019)
  • Buildings2 building records
  • Documents filed100 files

Current status

43%66 of 152 units booked
92.4%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DESIRE INA1515442872
DESIRE IINA1715691180

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

DESIRE I82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DESIRE II82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22
BuildingClosed/CoveredTotal
DESIRE I1212
DESIRE II1010

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,428 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jan 2026

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI4735.0
Proposed, not sanctioned4,735 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMONICA ARCADE, SUBHASH LANE, OFF DAFTARY ROAD, MALAD EAST MUMBAI 400 097
Estimated costRs 16.24 cr
Cost incurredRs 15.01 cr
Work done92.39%
BuildingWingEstimatedIncurred
DESIRE INARs 8.12 crRs 7.50 cr
DESIRE IINARs 8.12 crRs 7.50 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectvarun radheshyam kadam
Engineerjacob bastyaw dsouza
EngineerNEEL DHOLIA
EngineerHARESH PATEL
Chartered AccountantH S P & ASSOCIATES
Chartered AccountantDILIP KAPADIA
PartnerRole in project
MAULI SAI DEVELOPERS PVT LTD-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017893Jan 2019 → Jun 2024

Reason as filed by the promoterDUE TO COVID AND SHORTAGE OF LABOUR WE WERE NOT ABLE TO COMPLETE PROJECT ON TIME . SO WE REQUEST THE AUTHORITY TO PLEASE GRANT US EXTENTION TILL 29TH JUNE 2024

EXT51800011539Jan 2019 → Dec 2022

Reason as filed by the promoterWe would request to revise the date of completion as 31st December 2022, which is as per section 7(3) which we were aware about after reading MahaRera Order No. 07/2019 dated 08 February 2019. As we have surpass the previous extension date due to scarcity of raw materials and labors required for the completion of project in this Pandemic. Currently we have completed the project in terms of construction as well as all the required NOCs i.e. Drainage, Fire, Lift and SWD. Also the lottery for the slum dwellers has been drawn by Slum Rehabilitation Authority (SRA).

EXT51800001404Jan 2019 → Jan 2020

Reason as filed by the promoterSCARCITY OF SUPPLY OF SAND MAINLY REQUIRED FOR PLASTER AND OTHER FINISHING WORK DURING MONSOON AND TILL DATE THE SAME PROBLEMS PERSIST.

EXT51800025614Jan 2019 → Jun 2025

Reason as filed by the promoterTHE REASON FOR SEEKING AN EXTENTION FOR THE PROJECT IS THAT THE CONSTRUCTION WORK HAS BEEN COMPLETED. HOWEVER, WE ARE CURRENTLY AWAITING THE ISSUANCE OF THE FIRE NOC. UPON RECEIVING THE FIRE NOC, WE WILL BE ABLE TO PROCEED WITH THE APPLICATION FOR OBATAINING THE OCCUPANCY CERTIFICAT. THEREFORE, WE REQUEST AN EXTENTION OF TIME UNTIL 29-06-2025 TO COMPLETE THE REMAINING FORMALITIES.

EA03082622004Jan 2019 → Jun 2028

Reason as filed by the promoterOur project "Mauli Desire" comprises two buildings: 1. Mauli Desire I (Rehab) - 51 flats sold. 2. Mauli Desire II-75 flats sold and 2 flats unsold. We are pleased to inform you that the construction of the project has been successfully completed. However, the Occupancy Certificate (OC) for the project is yet to be obtained which was pending due to Road Demarcation and the same was cleared in year 2022 and thereafter due to tenant eligibility issue the same was further delay. We further state that the tenant eligibility issue was resolved recently and therefore we are now in the process of E ap

Litigation declared8

CaseCourtStatus
143/2016Small Causes Court BandraDISPOSED
1026/2018BOMBAY HIGH COURTCLAIM ON A FLAT MATTER PENDING
1109/2018BOMBAY HIGH COURTCLAIM ON A FLAT MATTER PENDING
1110/2018BOMBAY HIGH COURTCLAIM ON A FLAT MATTER PENDING
1138/2018BOMBAY HIGH COURTCLAIM ON A FLAT MATTER PENDING
CC006000000054741/2018THE MAHARASHTRA REAL ESTATE REGULATORY AUTHORITY OFFICE MUMBAIWITHDRAWN BY COMPLAINANT
CC0060000000547 44/2018THE MAHARASHTRA REAL ESTATE REGULATORY AUTHORITY OFFICE MUMBAIWITHDRAWN BY COMPLAINANT
CC006000000054748/2018THE MAHARASHTRA REAL ESTATE REGULATORY AUTHORITY OFFICE MUMBAIWITHDRAWN BY COMPLAINANT

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000054741NIRANJAN SHIVSHANKER PATHAKMauli Sai Developers Pvt.Ltd.03/06/2018
CC006000000054744AMRUTLAL CHIBABHAI MISTRYMAULI SAI DEVELOPERS PVT.LTD.03/06/2018
CC006000000054748KANTILAL AMICHAND MENATMAULI SAI DEVELOPERS PVT.LTD03/06/2018
CC006000000057143ashokkumarsinghmahanthrajsunil bharadkar07/01/2019
CC006000000231134Ashok Mahanthraj SinghMauli Sai Developers Pvt Ltd13/05/2022
CC006000000198971ABHISHEK SHRIKANT GUPTAMAULI SAI DEVELOPERS PRIVATE LIMITED09/11/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Jun 2028

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: formm 1 new.pdf20 Aug 2026
Withdrawal Update Form 2File: form 2.pdf20 Aug 2026
Withdrawal Update Form 3File: form 3 new.pdf20 Aug 2026
Withdrawal Update Form 1File: form 1.pdf19 Aug 2026
Withdrawal Update Form 1File: form 1 Desire_0001.pdf19 Aug 2026
Withdrawal Update Form 2File: form 2.pdf19 Aug 2026
Withdrawal Update Form 2File: Annex B Form 2 March 2026_0001.pdf19 Aug 2026
Withdrawal Update Form 3File: form 3 new.pdf19 Aug 2026
Withdrawal Update Form 3File: form 3_organized.pdf19 Aug 2026
Withdrawal Update Form 1File: form 1.pdf17 Aug 2026
Withdrawal Update Form 2File: form 2.pdf17 Aug 2026
Withdrawal Update Form 3File: form 3.pdf17 Aug 2026
Form 2A (FY 2025-2026)File: FORM 2A Mauli Desire_0001.pdf16 Jul 2026
Withdrawal Update Form 1File: FORM 1_ Desire_ June 2025.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2_Mauli Desire_June 25.pdf6 Jun 2026
Withdrawal Update Form 3File: FORM 3 (28).pdf6 Jun 2026
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations (1).pdf26 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf22 Feb 2025
Certificates of CA (Form 3)File: form 3.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf22 Feb 2025
CERSAI detailsFile: Desire CERSAI_Search_Report_200339067108_For_Asset_Based_Search_07_02_2025_16_15_27_924.pd22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 Feb 2025
Declaration in FORM BFile: Form B_Desire.pdf18 Dec 2024
Certificates of CA (Form 3)File: Form 3 SEPT 24.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY SEPT 24.pdf18 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Revised_Format-A (Bank Letterhead)_Desire.pdf18 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Revised_Format-A (Bank Letterhead)_Desire.pdf18 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Revised_Format B- Desire Bank Letter.pdf18 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Revised_Format B- Desire Bank Letter.pdf18 Dec 2024
Copy of the legal title reportFile: Desire_Title Report.pdf16 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEPT 24.pdf16 Dec 2024
Certificates of CA (Form 3)File: Form 3 JUNE 24.pdf16 Dec 2024
Certificates of CA (Form 3)File: Form 3 SEPT 24.pdf16 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEPT 24.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY SEPT 24.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY JUNE 24.pdf16 Dec 2024
Declaration about Commencement CertificateFile: DCC JUN2 24.pdf16 Dec 2024
Declaration about Commencement CertificateFile: DCC SEPT 24.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - 2023-24.pdf16 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form B- Desire Bank Letter.pdf16 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-06-2024_Architect Certificate.pdf14 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 _Engineer certificate Desire 2024_31-03-2024.pdf14 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 _Engineer certificate Desire_30-06-2024.pdf14 Dec 2024
Certificates of CA (Form 3)File: Form 3- Desire.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3- Desire.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- interest of parties.pdf22 May 2024
Declaration about Commencement CertificateFile: CC Declaration-Desire.pdf11 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect Certificate- Desire.pdf11 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate- Desire.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate-Desire.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory- Desire.pdf11 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account Declaration- Desire.pdf11 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5.pdf7 Nov 2023
Disclosure of sold/ booked inventoryFile: final Sold Unsold Inventory.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5 Rera Report Mauli Desire.pdf6 Nov 2023
CERSAI detailsFile: new cersai.pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: No encumbrances certificate.pdf9 Sep 2023
Details of encumbrances concerned to LegalFile: No encumbrances certificate.pdf9 Sep 2023
Declaration about Commencement CertificateFile: Form D.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf9 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf9 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site supervisor certificate 2.pdf9 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site supervisor certificate 1.pdf9 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf9 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DESIRE FORMAT A.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MSDPL Form 5 21-22.pdf12 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20 (2).pdf16 Mar 2022
Building plan approvalFile: WING A-APPROVED PLANS.pdf15 Mar 2022
Building plan approvalFile: WING B-APPROVED PLANS.pdf15 Mar 2022
Building Plan Approval (IOD)File: WING A-APPROVED PLANS.pdf15 Mar 2022
Building Plan Approval (IOD)File: WING B-APPROVED PLANS.pdf15 Mar 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf15 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SITE SUPERVISOR CERTIFICATE (FY 2019-2020).pdf15 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SITE SUPERVISOR CERTIFICATE (FY 2020-2021).pdf15 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf15 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf15 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf15 Mar 2022
Certificates of CA (Form 5)File: MSDPL RERA FORM 5.pdf30 Jan 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MAULI OMKARP51800001198TRIVENI NAGAR, Mumbai Suburban185Jul 2017OngoingJul 2024Registered original: Jul 2023Not delivered
MAULI CLASSICMAULI CLASSIC HAWA MANGAL BAUG NEAR HAWA HRIA MAHAL COLONY PUSHPA PARK DAFTARY ROAD MALAD EAST MUMBAI 400 09766-CompletedFeb 2014Late, Apr 2014

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 113 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAULI DESIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 kmMAULI DESIRECompleted 130Lapsed / revoked 84Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 346 registered projects within 2 km.

Builder: MAULI SAI DEVELOPERS PVT LTD

MAULI SAI DEVELOPERS PVT LTD has 4 registrations on MahaRERA, including MAULI OMKAR and MAULI PRIDE. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MAULI DESIRE is delayed beyond 29 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAULI DESIRE?

The registered promoter entity is MAULI SAI DEVELOPERS PVT LTD, a company as per the filing. Its CIN U45201MH2004PTC144062 and GSTIN 27AAECM0577F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAULI DESIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAULI DESIRE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAULI DESIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAULI DESIRE?

The professionals named in the filing: Architect: varun radheshyam kadam; Engineer: jacob bastyaw dsouza; Engineer: NEEL DHOLIA; Engineer: HARESH PATEL; Chartered Accountant: H S P & ASSOCIATES; Chartered Accountant: DILIP KAPADIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAULI DESIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAULI DESIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAULI DESIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.