Home / Browse projects / Aurangabad, Maharashtra / MATRIX COMPLEX

Completed No litigation declared Commercial project

MATRIX COMPLEX

By Vishwa Developers

RG-MH-02059 · RERA P51500010410 · Last updated on MahaRERA portal: 9 Mar 2020

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

MATRIX COMPLEX is a Commercial project by Vishwa Developers in Aurangabad, Maharashtra, registered with MahaRERA as P51500010410 on 24 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2026. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMATRIX COMPLEX
  • TypeCommercial
  • Location
    • Amarpreet Durga Road
    • Kalda Corner
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500010410
  • ReraGenie IDRG-MH-02059

Builder

  • NameVishwa Developers
  • Entity typePartnership
  • PartnersLALITKUMAR RAMGOPAL RATHI, DEVANAND NARAYAN KOTGIRE
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MATRIX COMPLEX 2 And 3 rd FloorNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

MATRIX COMPLEX 2 And 3 rd Floor: 64% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,581 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
PANKAJ PREMCHAND PHULPAGARAurangabad (M Corp.)Aurangabad
GAUTAM PREMCHAND PHULPAGARAurangabad (M Corp.)Aurangabad
TARADEVI RATANLAL BAFNAJalgaon (M Corp.)Jalgaon

Approvals and building plan

Permissible FSI8269.92
Proposed, not sanctioned5,770 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchADALAT ROAD AURANGABAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectROHIT SUNIL RAKA
EngineerSUNIL MULCHAND RAKA
PartnerRole in project
Vishwa Developers-

Litigation declared1

CaseCourtStatus
RCS NO 768-2015/2015CIVIL COURTPENDING IN CIVIL COURT

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC003000000010085Mohd Abdul Shakeel Abdul ShakeelMS VISHWA DEVELOPERS THROUGH ITS PARTNER24/09/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Nov 2019

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: CORRECTION DOD MATRIX_compressed.pdf9 Mar 2020
Status of ConveyanceFile: CORRECTION DOD MATRIX_compressed.pdf9 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Matrix_compressed.pdf3 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Matrix March 2019.pdf3 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: completion matrix_1.pdf3 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Cert.pdf14 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Matrix 311218Ar Cert.pdf18 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Matrix 311218Eng Cert.pdf18 Mar 2019
Certificates of CA (Form 3)File: Vishwa Q3.pdf18 Mar 2019
Certificates of CA (Form 5)File: certificate.pdf26 Nov 2018
Declaration in FORM BFile: Form B.pdf16 May 2018
Building plan approvalFile: Matrix New 2nd Floor-compressed.pdf30 Apr 2018
Building plan approvalFile: Matrix 3rd floor compressed.pdf30 Apr 2018
Building Plan Approval (IOD)File: Matrix New 2nd Floor-compressed.pdf30 Apr 2018
Building Plan Approval (IOD)File: Matrix 3rd floor compressed.pdf30 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Matrix CC 28032018.pdf30 Apr 2018
Layout approvalFile: 4 Copy of Layout Approval.pdf15 Aug 2017
Building plan approvalFile: 13 APPROVED PLAN 1.pdf15 Aug 2017
Building plan approvalFile: 13 APPROVED PLAN 2.pdf15 Aug 2017
PAN CardFile: 1 Pan Vishwa Developers.pdf15 Aug 2017
Copy of the legal title reportFile: 2 Legal Title Report.pdf15 Aug 2017
Details of encumbrancesFile: 3 DETAIL OF ENCUMBRANCES.pdf15 Aug 2017
Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval.pdf15 Aug 2017
Building Plan Approval (IOD)File: 13 APPROVED PLAN 1.pdf15 Aug 2017
Building Plan Approval (IOD)File: 13 APPROVED PLAN 2.pdf15 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 COMMENCEMENT CERTIFICATE MATRIX.pdf15 Aug 2017
Declaration in FORM BFile: 6 DECLARATION FORM B MATRIX.pdf15 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 CERTIFICATE OF ARCHITECT MATRIX.pdf15 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineer Certificate Matrix.pdf15 Aug 2017
Certificates of CA (Form 3)File: 9 C A CERTIFICATE Matrix 11.pdf15 Aug 2017
Proforma of Allotment letterFile: 5 Proforma of Allotment and Sample Draft for Agreement to sale.pdf15 Aug 2017

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep MATRIX COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalda Corner1,400+ in Aurangabad

2 kmMATRIX COMPLEXCompleted 5Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Vishwa Developers

Vishwa Developers has 7 registrations on MahaRERA, including MATRIX COMPLEX and SWAMI KRUPA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if MATRIX COMPLEX is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MATRIX COMPLEX?

The registered promoter entity is Vishwa Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MATRIX COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MATRIX COMPLEX?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MATRIX COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MATRIX COMPLEX?

The professionals named in the filing: Architect: ROHIT SUNIL RAKA; Engineer: SUNIL MULCHAND RAKA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MATRIX COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MATRIX COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MATRIX COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.