ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Marvel Hills

Registered No litigation declared Residential / Group Housing project

Marvel Hills

By SUCCESS LAND DEVELOPERS

RG-MH-76673 · RERA P52100049705 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
16 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Marvel Hills is a Residential / Group Housing project by SUCCESS LAND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100049705 on 22 Feb 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 17 of the 33 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameMarvel Hills
  • TypeResidential / Group Housing
  • Location
    • Mandavgan Road
    • M D R 53
    • Shirur
    • Pune
    • 412210
  • Pincode412210
  • RERA no.P52100049705
  • ReraGenie IDRG-MH-76673

Builder

  • NameSUCCESS LAND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ADWFS7935H1Z6
  • PartnersBHAVESH CHANDRAKANT CHOPDA, SANKET CHANDRAKANT CHOPDA, SONAL BHAVESH CHOPDA, VAISHNAVI SANDIP BIHANI, SANDEEP BALKISAN BHIHANI
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed79 files

Current status

52%17 of 33 units booked
72.5%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Marvel HillsNA8633033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

Marvel Hills: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Open Space18

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,037 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025
LandownerVillageDistrict
Suresh dadabhau KhodgeShirurPune
Rajendra Baban RokdeAhmadnagar (M Corp.)Ahmednagar
Sunita Sharad kalamkarRanjangaonAhmednagar

Approvals and building plan

Sanctioning authorityBHAVESH CHANDRAKANT CHOPDA
Permissible FSI2845.32
Proposed, not sanctioned2,845 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 5 6 11 15 16 samruddhi business park shirur
Estimated costRs 5.99 cr
Cost incurredRs 4.34 cr
Work done72.46%
BuildingWingEstimatedIncurred
Marvel HillsNARs 5.99 crRs 4.34 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNisar Tamboli
EngineerNisar Tamboli
EngineerTamboli & Associates
Chartered AccountantSNR AND ASSOCIATES
Chartered AccountantSAC CO & LLP
PartnerRole in project
SUCCESS LAND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25072621875Mar 2026 → Mar 2027

Reason as filed by the promoterConstruction of the project has been completed. The application for the Occupancy Certificate (OC) has been submitted and is currently under process with the competent authority. Since time is required for issuance of the OC, an extension of the project registration is necessary to enable filing of the required project corrections/amendments on the MahaRERA portal. Therefore, extension of the project registration up to 31.03.2027 is requested

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 30062026.pdf20 Aug 2026
Withdrawal Update Form 2File: Form 2 30062026.pdf20 Aug 2026
Withdrawal Update Form 3File: Form 3 30062026 marvel hills sign.pdf20 Aug 2026
Form 2A (FY 2024-2025)File: Form 2a 2024-2025.pdf10 Aug 2026
Form 2A (FY 2022-2023)File: Form 2A_Marvel Hills_FY 22_23 final.pdf25 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_Marvel Hills_FY 25_26 final.pdf25 Jul 2026
Form 5 (FY 2025-2026)File: Form 5_Marvel Hills _FY 2025-2026 sign.pdf25 Jul 2026
Form 5 (FY 2024-2025)File: Form 5_Marvel Hills _FY 2024 2025 sign_compressed.pdf22 Jul 2026
Form 5 (FY 2023-2024)File: form 5 Marvel Hills 31032024_compress.pdf22 Jul 2026
Form 5 (FY 2022-2023)File: Form 5_Marvel Hills_FY 22_23 final.pdf22 Jul 2026
Withdrawal Update Form 1File: Form 1 31_12_2025.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect certificate 31_03_2026 marvel hills sign.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer marvel hills 31_12_2025 sign.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 Engineer marvel hills 31_03_2026 sign.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3_31_12_2025 _marvel hills_Sign copy.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3 31_03_2026_marvel hills_sign copy.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 30062025.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1 30092025.pdf29 Jan 2026
Withdrawal Update Form 2File: form 2 30062025 sign.pdf29 Jan 2026
Withdrawal Update Form 2File: form 2 30092025 sign.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 30062025 -marvel hills sign.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 30092025 -marvel hills sign.pdf29 Jan 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE 2A 23 24.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Marvel Hills 30-06-2024 sign_compressed.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Marvel Hills 30-09-2024 sign_.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marvel Hills 30062024 Sign_compressed.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marvel Hills 30092024 Sign_.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Marvel Hills 30-06-2024 sign_compressed.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Marvel Hills 30-09-2024 sign.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER SOLD-UNSOLD sign.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER SOLD-UNSOLD sign.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Marvel Hills 31032024_compress.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Marvel Hills 31032024_compress.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: Soldunsold.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: MARVEL HILLS DISCLOSURE OF SOLD unsold INVENTORY 31032023.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: MARVEL HILLS DISCLOSURE OF SOLD unsoldINVENTORY 30062023.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate 31122023 marvel hills.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate marvel hills 31122023.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER MARVEL HILLS.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mravel hills 31122023 both signed.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Marvel Hills 30-09-2023.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Marvel Hills 30-09-2023.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Marvel Hills_31032023_final.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Marvel Hills_30062023 final.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Marvel Hills_31032023_final.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Marvel Hills_30062023 Reduce.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Marvel Hills_FY 22_23 final.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032023 marvel hills merged final.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062023 marvel hills merged final.pdf22 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Marvel Hills_FY 22_23 final.pdf22 Aug 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf14 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf11 Feb 2023
Other - LegalFile: AUTHORIZED SIGNATORY.pdf11 Feb 2023
Layout approvalFile: 5 Layout Approval.pdf9 Feb 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATeS merged.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATeS merged.pdf9 Feb 2023
Copy of Layout Approval (in case of layout)File: 5 Layout Approval.pdf9 Feb 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf9 Feb 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION REPORT WITH RESPECT TO MODELCOPYOFAGREEMENT.pdf9 Feb 2023
Proforma of Allotment letterFile: 15 MODEL FORM OF ALLOTMENT LETTER_compressed.pdf26 Dec 2022
Building plan approvalFile: 6 Building Plan Approval.pdf23 Dec 2022
PAN CardFile: 1 SUCCESS LAND DEVELOPERS PAN.pdf23 Dec 2022
Copy of the legal title reportFile: Search Title Report signed.pdf23 Dec 2022
Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCE.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCE.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval.pdf23 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate.pdf23 Dec 2022
Declaration in FORM BFile: 9 FORM B NOTRAISED.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 FORM 1 Architect Certificate.pdf23 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 FORM 2 Engineer Certificate.pdf23 Dec 2022
Disclosure of sold/ booked inventoryFile: 17 DISCLOSURE OF SOLD UNSOLD INVENTORY Parking.pdf23 Dec 2022
Disclosure of sold/ booked inventoryFile: 17 Discloure of Sold Unsold Inventory.pdf23 Dec 2022
CERSAI detailsFile: 19 CERSAI Details_compressed.pdf23 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 19 FORM 3 Success Land Developers SIGN.pdf23 Dec 2022
Proforma of Agreement for saleFile: MODEL AGREEMENT FOR SALE RERA.pdf23 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 34 Declaration about separate Bank Account.pdf23 Dec 2022

How this compares with Pune

52%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Marvel Hills on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near M D R 5313,700+ in Pune

Builder: SUCCESS LAND DEVELOPERS

SUCCESS LAND DEVELOPERS has 2 registrations on MahaRERA, including MARVEL EMPIRE and Marvel Hills. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Marvel Hills is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Marvel Hills?

The registered promoter entity is SUCCESS LAND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADWFS7935H1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Marvel Hills?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Marvel Hills?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Marvel Hills?

The professionals named in the filing: Architect: Nisar Tamboli; Engineer: Nisar Tamboli; Engineer: Tamboli & Associates; Chartered Accountant: SNR AND ASSOCIATES; Chartered Accountant: SAC CO & LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Marvel Hills?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Marvel Hills. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Marvel Hills to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.