Registered No litigation declared Others project

NAKSHATRA AROMA

By NITU ASSOCIATES

RG-MH-81304 · RERA P52100053910 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 17.50 crore secured on the land, in favour of CENTRAL BANK OF INDIA

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
90 of 135Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

NAKSHATRA AROMA is a Others project by NITU ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100053910 on 11 Dec 2023. Possession is promised by 31 Dec 2029. 45 of the 135 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameNAKSHATRA AROMA
  • TypeOthers
  • Location
    • NA
    • Shirur
    • Pune
    • 412210
  • Pincode412210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053910
  • ReraGenie IDRG-MH-81304

Builder

  • NameNITU ASSOCIATES
  • Entity typePartnership
  • PartnersMAYUR SHRENIK NAHAR, NITIN MOTILAL MUTHA, RANJANA SHRIKANT LODHA, RAVIN RAMESHLAL BORA, VAIBHAV KHABIYA

Key dates

this monthRegisteredDec 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Current status

33%45 of 135 units booked
54.8%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER ANA118422264
TOWER BNA118492271

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

TOWER A49%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER B49%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed182

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots182
Closed/Covered182
BuildingClosed/CoveredTotal
TOWER A9191
TOWER B9191

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofCENTRAL BANK OF INDIA
Secured amountRs 17.50 crore
CERSAI search filedYes
Declared on22 Jul 2025
LandownerVillageDistrict
MAYUR SHRENIK NAHARShirurPune
NITIN MOTILAL MUTHAShirurPune
RANJANA SHRIKANT LODHAShirurPune
RAVIN RAMESHLAL BORAShirurPune
VAIBHAV KHABIYAShirurPune

Approvals and building plan

Sanctioning authorityShirur Municipal Council
Permissible FSI10963.61
Proposed, not sanctioned10,964 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURAJ HOTEL BUILDING,MAIN ROAD,SHIRUR,PUNE DISTRICT 412210
Estimated costRs 42.32 cr
Cost incurredRs 23.21 cr
Work done54.84%
BuildingWingEstimatedIncurred
TOWER ANARs 20.76 crRs 11.61 cr
TOWER BNARs 20.76 crRs 11.61 cr
-NARs 80.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR KAPLESH C CHORDIYA
EngineerRUSHABH BHANDARI
Chartered AccountantCA JYOTI PRAKASH DASH
Chartered AccountantJPD & CO CHARTERED ACCOUNTANTS
Chartered AccountantASHUTOSH GOKHALE AND COMPANY
PartnerRole in project
NITU ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ MAR 26_ NAKSHATRA AROMA.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2_ MAR 26_ NAKSHATRA AROMA.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3_ MAR 26_ NAKSHATRA AROMA.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1_ DEC 25_ NAKSHATRA AROMA.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ NAKSHATRA AROMA.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ NAKSHATRA AROMA_compressed.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ NAKSHATRA AROMA.pdf27 Oct 2025
Withdrawal Update Form 1File: FORM 1_ SEP 25_ NAKSHATRA AROMA.pdf27 Oct 2025
Withdrawal Update Form 2File: FORM 2_ SEP 25_ NAKSHATRA AROMA.pdf27 Oct 2025
Withdrawal Update Form 2File: FORM 2_ SEP 25_ NAKSHATRA AROMA.pdf27 Oct 2025
Withdrawal Update Form 3File: FORM 3_ SEP 25_ NAKSHATRA AROMA_compressed.pdf27 Oct 2025
Withdrawal Update Form 3File: FORM 3_ SEP 25_ NAKSHATRA AROMA_compressed.pdf27 Oct 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ NAKSHTRA AROMA.pdf22 Jul 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ NAKSHTRA AROMA.pdf22 Jul 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ NAKSHTRA AROMA.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25.pdf22 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 2025_compressed.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_NITU ASSOCIATES_NAKSHATRA AROMA_DECV 2024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_NITU ASSOCIATES_NAKSHATRA AROMA_DECV 2024_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_NITU ASSOCIATES_NAKSHATRA AROMA_DECV 2024.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_NITU ASSOCIATES_NAKSHATRA AROMA_DECV 2024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24_compressed.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24_compressed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 2024.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: 4SOLD UNSOLD_ JUNE 24.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ JUNE 24.pdf18 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-NAKSHATRA AROMA_23 24.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DECEMBER.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-NAKSHATRA AROMA_MAR 24.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DECEMBER.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-NAKSHATRA AROMA_MAR 24.pdf2 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-NAKSHATRA AROMA_23 24.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_DEC.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-NAKSHATRA AROMA_MAR 24.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DECEMBER.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-NAKSHATRA AROMA_MAR 24.pdf2 May 2024
Declaration about Commencement CertificateFile: 7 DRAFTS_ON LETTERHEAD.pdf29 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: AROMA.pdf28 Oct 2023
Layout approvalFile: 5-1 Copy of Layout Approval (in case of layout).pdf27 Oct 2023
Layout approvalFile: 5-2 Copy of Layout Approval (in case of layout).pdf27 Oct 2023
Layout approvalFile: 5-3 Copy of Layout Approval (in case of layout).pdf27 Oct 2023
Building plan approvalFile: 6-1 Building Plan Approval NA Order for plotted development.pdf27 Oct 2023
Building plan approvalFile: 6-2 Building Plan Approval NA Order for plotted development.pdf27 Oct 2023
Building plan approvalFile: 6-3 Building Plan Approval NA Order for plotted development.pdf27 Oct 2023
Building plan approvalFile: 6-4 Building Plan Approval NA Order for plotted development .pdf27 Oct 2023
PAN CardFile: 1 PAN CARD.pdf27 Oct 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (1).pdf27 Oct 2023
Copy of the legal title reportFile: 2-2 Copy of the legal title report_compressed.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf27 Oct 2023
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf27 Oct 2023
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: 5-1 Copy of Layout Approval (in case of layout).pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: 5-2 Copy of Layout Approval (in case of layout).pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: 5-3 Copy of Layout Approval (in case of layout).pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6-1 Building Plan Approval NA Order for plotted development.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6-2 Building Plan Approval NA Order for plotted development.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6-3 Building Plan Approval NA Order for plotted development.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6-4 Building Plan Approval NA Order for plotted development .pdf27 Oct 2023
Declaration in FORM BFile: 9 Declaration in FORM B_compressed.pdf27 Oct 2023
CERSAI detailsFile: 12 CERSAI details.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost Fund withdrawal (Form 3) compressed.pdf27 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organizations_compressed.pdf27 Oct 2023
Proforma of Agreement for saleFile: 15 Proforma of Agreement for sale.pdf27 Oct 2023
Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf27 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17 Separate Bank Account details including no encumbrances on the Bank Account or no escro27 Oct 2023
Deviation Report with respect to Allotment letterFile: 18 Deviation Report with respect to Allotment letter.pdf27 Oct 2023
Deviation Report with respect to model copy of AgreementFile: 19 Deviation Report with respect to model copy of Agreement.pdf27 Oct 2023

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAKSHATRA AROMA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA13,700+ in Pune

2 kmNAKSHATRA AROMACompleted 13Lapsed / revoked 16Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: NITU ASSOCIATES

NITU ASSOCIATES has 1 registration on MahaRERA, including NAKSHATRA AROMA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NAKSHATRA AROMA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAKSHATRA AROMA?

The registered promoter entity is NITU ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAKSHATRA AROMA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAKSHATRA AROMA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAKSHATRA AROMA?

The professionals named in the filing: Architect: AR KAPLESH C CHORDIYA; Engineer: RUSHABH BHANDARI; Chartered Accountant: CA JYOTI PRAKASH DASH; Chartered Accountant: JPD & CO CHARTERED ACCOUNTANTS; Chartered Accountant: ASHUTOSH GOKHALE AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAKSHATRA AROMA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAKSHATRA AROMA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAKSHATRA AROMA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.