Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
18 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 96%
9Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

Marvel Ganga Sangria K,L,M Building is a Residential / Group Housing project by MARVEL LANDMARKS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100002514 on 1 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2020. The completion date has moved by 18 months from the original filing. 9 complaints are on record with the regulator.

At a glance

Project

  • NameMarvel Ganga Sangria K,L,M Building
  • TypeResidential / Group Housing
  • Location
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002514
  • ReraGenie IDRG-MH-09383

Builder

  • NameMARVEL LANDMARKS PVT LTD
  • Entity typeCompany
  • Managing DirectorVISHWAJEET SUBHASH JHAVAR
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion29 Dec 2020
  • Revised completionRevised to 29 Dec 2020 (originally 30 Jun 2019)
  • Buildings3 building records
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KNA210000
LNA210000
MNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Jul 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 96%.

K66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
L61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
M91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.83%

Progress on shared amenities15

As on 8 Jul 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes45%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes55%
Street LightingYes50%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable

Parking filed89

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots89
Closed/Covered89
BuildingClosed/CoveredTotal
K3030
L4040
M1919

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,445 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SUBHASH S GOELPune (M Corp.)Pune
RAJENDRA S GOELPune (M Corp.)Pune
ANUJ UMESH GOELPune (M Corp.)Pune

Approvals and building plan

Permissible FSI11386.4
Proposed, not sanctioned10,886 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOREGAON PARK

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL MALWADKAR
EngineerRAJESH VASUDEV MANKANI
PartnerRole in project
MARVEL LANDMARKS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001481Jun 2019 → Jun 2020

Reason as filed by the promoterOn Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, cement, other building material, water or electric supply. b. Delay on the part of the Municipal Corporation of Pune or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliance's with the ch

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC005000000000035Rupesh JainVishwajeet Subhash Jhavar10/08/2017
CC005000000054031Mr. Rupesh Lilachand JainMarvel Landmarks Pvt.Limited through its director MR.Vishwajeet Jhavar11/02/2020
CC005000000010829Thomas ElliottVishwajeet Subash Jhavar09/01/2018
CC005000000023414Mr. Murtuza RahimMarvel Landmarks Private LImited, Through its Director- Vishwajeet Subhash Jhavar10/09/2019
CC005000000022717KULDEEP TIKUMARVEL LANDMARKS PVT. LTD.28/02/2019
CC005000000022974Parth AroraMarvel Landmarks Pvt. Ltd. through Sh. Vishwajeet Subhash Jhavar and Others30/12/2019
CC005000000023072Mr Wincy Dominic savio DsouzaMr Subhash Sitaram Goel26/05/2019
CC005000000023176Subhash Sitaram Goel through POA holder Manoj Navin ParekhRupesh Jain25/06/2019
CC005000000043741Mr Manjeet singh chanranjeetsingh NarangMARVEL LANDMARKS PVT LTD a registered company through its directors Mr.Vishwajeet subhash Jhavar02/12/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: sangria.pdf8 Jul 2020
Certificates of Architect (Form 4)File: COMPLETION CERTIFICATE ABCKL.pdf8 Jul 2020
OtherFile: COMPLETION CERTIFICATE ABCKL.pdf8 Jul 2020
Certificates of Architect (Form 4)File: Bldg_M_Rera_Cert.pdf27 May 2019
OtherFile: OC_GHJM.pdf24 May 2019
Certificates of CA (Form 5)File: Sangria KLM Form 5.pdf4 Apr 2019
Certificates of CA (Form 5)File: Marvel Ganga Sangria K,L,M Building Form 5 Declaration.pdf18 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SANGRIA K L M BUILDING.pdf30 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SANGRIA KLM.pdf31 Mar 2018
Layout approvalFile: SANGRIA KLM.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: SANGRIA KLM.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate K L M Building.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate K L M Building.pdf27 Jul 2017
Certificates of CA (Form 3)File: C A Certificate K L M.pdf27 Jul 2017
OtherFile: BUILDING LAY-OUT DWG-Model.pdf27 Jul 2017
Copy of the legal title reportFile: Title Report.pdf26 Jul 2017
Proforma of Allotment letterFile: Allotment Letter and Unit Agreement K L M Building.pdf24 Jul 2017
Declaration in FORM BFile: Affidevit K L M Building.pdf20 Jul 2017
Building plan approvalFile: L BUILDING 2.pdf12 Jul 2017
Building plan approvalFile: L BUILDING.pdf12 Jul 2017
Building plan approvalFile: L BUILDING.pdf12 Jul 2017
Building plan approvalFile: M BUILDING 1.pdf12 Jul 2017
Building plan approvalFile: M BUILDING.pdf12 Jul 2017
Building plan approvalFile: H J K BUILDING 1.pdf12 Jul 2017
Building plan approvalFile: H J K BUILDING 2.pdf12 Jul 2017
Building plan approvalFile: H J K BUILDING 3.pdf12 Jul 2017
Building plan approvalFile: H J K BUILDING.pdf12 Jul 2017
Building plan approvalFile: L BUILDING 1.pdf12 Jul 2017
Building plan approvalFile: H J K BUILDING 4.pdf12 Jul 2017
Building plan approvalFile: H J K BUILDING 5.pdf12 Jul 2017
PAN CardFile: MLPL PAN.pdf12 Jul 2017
Details of encumbrancesFile: Mortgage Deed Index II.pdf12 Jul 2017
Building Plan Approval (IOD)File: H J K BUILDING 1.pdf12 Jul 2017
Building Plan Approval (IOD)File: H J K BUILDING 2.pdf12 Jul 2017
Building Plan Approval (IOD)File: H J K BUILDING 3.pdf12 Jul 2017
Building Plan Approval (IOD)File: H J K BUILDING 4.pdf12 Jul 2017
Building Plan Approval (IOD)File: H J K BUILDING 5.pdf12 Jul 2017
Building Plan Approval (IOD)File: H J K BUILDING.pdf12 Jul 2017
Building Plan Approval (IOD)File: L BUILDING 1.pdf12 Jul 2017
Building Plan Approval (IOD)File: L BUILDING 2.pdf12 Jul 2017
Building Plan Approval (IOD)File: L BUILDING.pdf12 Jul 2017
Building Plan Approval (IOD)File: L BUILDING.pdf12 Jul 2017
Building Plan Approval (IOD)File: M BUILDING 1.pdf12 Jul 2017
Building Plan Approval (IOD)File: M BUILDING.pdf12 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MARVEL ISOLA J BUILDINGP52100001843MOHAMMADWADI, Pune44Jul 2017OngoingDec 2025Registered original: Jun 2021Not delivered
MARVEL ZEPHYRSR NO 66 KHARADI PUNE315-CompletedMar 2016Feb 2016
MARVEL ISOLASR NO 16 MOHAMMADWADI PUNE204-CompletedJun 2015Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Marvel Ganga Sangria K,L,M Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOHAMMADWADI13,700+ in Pune

2 kmMarvel Ganga Sangria K,LCompleted 2Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: MARVEL LANDMARKS PVT LTD

MARVEL LANDMARKS PVT LTD has 7 registrations on MahaRERA, including MARVEL ISOLA J BUILDING and Marvel Ganga Sangria D,E Building. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Marvel Ganga Sangria K,L,M Building is delayed beyond 29 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Marvel Ganga Sangria K,L,M Building?

The registered promoter entity is MARVEL LANDMARKS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Marvel Ganga Sangria K,L,M Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Marvel Ganga Sangria K,L,M Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Marvel Ganga Sangria K,L,M Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Marvel Ganga Sangria K,L,M Building?

The professionals named in the filing: Architect: RAHUL MALWADKAR; Engineer: RAJESH VASUDEV MANKANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Marvel Ganga Sangria K,L,M Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Marvel Ganga Sangria K,L,M Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Marvel Ganga Sangria K,L,M Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.