ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Marvel Fria P1, P2, P3 Building

Completed No litigation declared Residential / Group Housing project

Marvel Fria P1, P2, P3 Building

By PAX HOMES LLP

RG-MH-09301 · RERA P52100001522 · Last updated on MahaRERA portal: 26 Oct 2024

Source: official MahaRERA filing

Red flags

  • 19 complaints at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
19Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

Marvel Fria P1, P2, P3 Building is a Residential / Group Housing project by PAX HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100001522 on 28 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. The completion date has moved by 42 months from the original filing. 19 complaints are on record with the regulator.

At a glance

Project

  • NameMarvel Fria P1, P2, P3 Building
  • TypeResidential / Group Housing
  • Location
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001522
  • ReraGenie IDRG-MH-09301

Builder

  • NamePAX HOMES LLP
  • Entity typePartnership
  • PartnerVISHWAJEET SUBHASH JHAVAR
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJun 2021Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 30 Jun 2021)
  • Buildings3 building records
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
P1NA150000
P2NA150000
P3NA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 26 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

P1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
P2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
P3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed159

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots159
Closed/Covered159
BuildingClosed/CoveredTotal
P15353
P25353
P35353

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,921 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
GRAND REALITY PVT LTD AND OTHERSPune (M Corp.)Pune
BINAIFER kANRANJIAMumbai CityMumbai City
JESMINE JAHANGIRMumbai CityMumbai City
MNK REAL ESTATE LLPPune (M Corp.)Pune
KANTA AGARWALPune (M Corp.)Pune

Approvals and building plan

Permissible FSI11378.46
Proposed, not sanctioned10,378 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMAN NAGAR

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL MALWADKAR
PartnerRole in project
PAX HOMES LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009964Jun 2021 → Jun 2022

Reason as filed by the promoterConsidering complete slowdown in construction activities of real estate projects and impact of COVID-19 (Corona Virus) Pandemic and consequent nation-wide lockdown with effect from March, 2020, we were not able to complete our project as per time lines given by your esteem office. We hereby request you to allow us extension of our registration no. till 30th June, 2022 for our project as referred above.

EXT52100018910Jun 2021 → Dec 2024

Reason as filed by the promoter1) NCLT petition by Kaushal Deshmukh and 41 Ors. against the Co-Promoter (i.e. Land Owner) M/S. GRAND REALITY PRIVATE LIMITED was admitted and company was under CIRP which impacted client trust wherein we are unable to get 51% consent of allottees but the project is at final i.e. Completion stage and our intention is to offer possession to the allottees. 2) Funding from Financer for project was on hold due to NCLT, which resulted in no work on site in that period. 3) Therefore for the reasons mentioned hereinabove the Promoter could not complete the remaining pending work in due time and this

Complaints filed with MahaRERA19

Case no.ComplainantRespondentFiled
CC005000000411077Ayush Anil JainPAX HOMES LLP06/06/2024
CC005000000471297Kaushik KumarPAX HOMES LLP23/07/2024
CC005000000471392Girija Shankar PalPAX HOMES LLP27/07/2024
CC005000000471517Kaushal DeshmukhPAX HOMES LLP11/08/2024
CC005000000471512PARTHA PRATIM DASHPAX HOMES LLP10/08/2024
CC005000000471514SONU KUMARI MANDHANIYAPAX HOMES LLP10/08/2024
CC005000000471513DEBASISH DEYPAX HOMES LLP10/08/2024
CC005000000471515FAIYAZ PATILPAX HOMES LLP11/08/2024
CC005000000471516ADITYA PINNALIPAX HOMES LLP11/08/2024
CC005000000471518Sunil Sadashiv NikamPAX HOMES LLP11/08/2024
CC005000000471519SARBA PANDAPAX HOMES LLP11/08/2024
CC005000000471524PRASHANT BHASKAR MANEPAX HOMES LLP12/08/2024
CC005000000471525NIKHIL LOHANIPAX HOMES LLP12/08/2024
CC005000000471526MITESH SHARMAPAX HOMES LLP12/08/2024
CC005000000471527MEENA RAWLANIPAX HOMES LLP12/08/2024
CC005000000471528PRADEEP KUMAR SINGHPAX HOMES LLP12/08/2024
CC005000000471529AVINASH KUMAR SHARMAPAX HOMES LLP12/08/2024
CC005000000471530MEHDI RAZA M MITHANIPAX HOMES LLP12/08/2024
CC12400001Pratap Chand AnandPAX HOMES LLP01/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 May 2024

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold unsold June 24 Fria.PDF26 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Fria.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Fria June 23.PDF24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Fria Sept 23.PDF24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Fria March 24.PDF24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Fria March 24.PDF24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Fria June 24.pdf22 Oct 2024
Certificates of CA (Form 3)File: Form 3 June 24.pdf22 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 24 Fria.pdf22 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 March 2018.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 March 2019.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 March 2020.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 March 2021.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 December 2021.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 March 2022.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 june 2022.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 September 2022.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 December 2022.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 March 2023.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 June 2023.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 September 2023.PDF1 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 March 2024.PDF1 Aug 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2023-24.pdf1 Aug 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2023-24.pdf1 Aug 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2023-24.pdf1 Aug 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2023-24.pdf1 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1-Form 1 March 2020.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2-Form 1 March 2021.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3-Form 1 Dec 2021.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4-Form 1 March 2022.pdf31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5-Form 1 June 2022.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6-Form 1 Sept 2022.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7-Form 1 Dec 2022.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8-Form 1 March 2023.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9-Form 1 June 2023.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10-Form 1 Sept 2023.PDF31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11-Form 1 March 2024.PDF31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Fria March 2018.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Fria March 19.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Fria March 20.pdf31 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Fria P1 P2 P3.pdf28 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate 1pdf.pdf23 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate 2.pdf23 May 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2017-18.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2017-18.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2017-18.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2017-18.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2018-19.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2018-19.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2018-19.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2018-19.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2019-20.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2019-20.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2019-20.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2019-20.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2020-21.PDF9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2020-21.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2020-21.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2020-21.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2021-22.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2021-22.PDF9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2021-22.PDF9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2021-22.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-1_2022-23.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-2_2022-23.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-3_2022-23.pdf9 Mar 2024
Certificates of CA (Form 3)File: Fria II_Form 3_Qrt-4_2022-23.pdf9 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A (Year Ending 2022) 26-02-2024.PDF27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A (Year Ending 2023) 26-02-2024.PDF27 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_26022024.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Ors Real Estate Organisation _ Fria-II 27022024.PDF27 Feb 2024
Proforma of Agreement for saleFile: Agreement Proforma.pdf27 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A _ Declaration about Seperate Bank Account 26022024.PDF27 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate fria_14122023184923.PDF16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate fria_14122023184800.PDF16 Jan 2024
Disclosure of sold/ booked inventoryFile: Discolsure sold Fria_14122023182452.PDF16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA form 5 -2019_14122023185449.PDF16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA form 5 -2020_14122023185511.PDF16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA form 5 -2021_14122023185525.PDF16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA form 5 -2022_14122023185545.PDF16 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MARVEL FRIAGAT NO 1400 AND OTHER WAGHOLI PUNE622CompletedDec 2016Aug 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Marvel Fria P1, P2, P3 Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmMarvel Fria P1, P2, P3 BCompleted 20Lapsed / revoked 15Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: PAX HOMES LLP

PAX HOMES LLP has 1 registration on MahaRERA, including Marvel Fria P1, P2, P3 Building. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Marvel Fria P1, P2, P3 Building is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Marvel Fria P1, P2, P3 Building?

The registered promoter entity is PAX HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Marvel Fria P1, P2, P3 Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Marvel Fria P1, P2, P3 Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Marvel Fria P1, P2, P3 Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Marvel Fria P1, P2, P3 Building?

The professionals named in the filing: Architect: RAHUL MALWADKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Marvel Fria P1, P2, P3 Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Marvel Fria P1, P2, P3 Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Marvel Fria P1, P2, P3 Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.