Registration lapsed No litigation declared Plotted project

MARVEL EMPIRE

By SUCCESS LAND DEVELOPERS

RG-MH-16828 · RERA P52100027058 · Last updated on MahaRERA portal: 23 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
9 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

MARVEL EMPIRE is a Plotted project by SUCCESS LAND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100027058 on 13 Nov 2020. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 12 months from the original filing. 47 of the 56 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMARVEL EMPIRE
  • TypePlotted
  • Location
    • GAT NO 309-1
    • SHIRUR TARDOBACHI WADI
    • Shirur
    • Pune
    • 412210
  • Pincode412210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027058
  • ReraGenie IDRG-MH-16828

Builder

  • NameSUCCESS LAND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ADWFS7935H1Z6
  • PartnersBHAVESH CHANDRAKANT CHOPDA, SANKET CHANDRAKANT CHOPDA, SONAL BHAVESH CHOPDA, VAISHNAVI SANDIP BIHANI, SANDEEP BALKISAN BHIHANI
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

28 months past promisethis monthRegisteredNov 2020First promiseJun 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on13 Nov 2020
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 30 Jun 2023)
  • BuildingsNot stated in filing
  • Documents filed86 files

Current status

84%47 of 56 units booked

Figures as on 23 Jun 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 23 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area24,804 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authorityBHAVESH CHANDRAKANT CHOPDA
Permissible FSI1.29
Proposed, not sanctioned1 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHOUSE NO 2779 PUNE NAGAR ROAD SHIRUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNisar Tamboli
EngineerNisar Tamboli
Chartered AccountantSNR AND ASSOCIATES
PartnerRole in project
SUCCESS LAND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017408Jun 2023 → Jun 2024

Reason as filed by the promoterProject is completion but internal road construction is pending as other work on plots of customers is going on so seeking for extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 Marvel Empire 31-07-2024.pdf23 Jun 2025
Form 2File: FORM 2 Marvel Empire 31-07-2024.pdf23 Jun 2025
Form 3File: Form 3 Marvel Empire 31072024 sign.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER SOLD-UNSOLD sign.pdf23 Jun 2025
OthersFile: form 4 Marvel Empire 25-07-2024 sign.pdf23 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEERS CERTIFICATE 2A 22 __23.pdf19 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation certificate.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Marvel Empire 31-07-2024.pdf28 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4 Marvel Empire 25-07-2024 sign.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marvel Empire 31072024 sign.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Marvel Empire 31-07-2024_compressed.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER SOLD-UNSOLD sign.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A Marvel Empire FY 23 24.pdf28 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 AR_ TAMBOLI MARVEL EMPIRE.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Marvel Emplrs 31032024_compress.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (2).pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: MARVEL EMPIRE DISCLOSURE OF SOLD unsold INVENTORY 31032023.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: MARVEL EMPIRE DISCLOSURE OF SOLD unsold 30062023.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate _31122023 Marvel empire.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate 31122023 marvel empire.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSER MARVEL EMPIRE.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3marvel empire 31122203 both signed.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Marvel Empire 30-09-2023.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Marvel Empire 30-09-2023.pdf8 Dec 2023
Declaration in FORM BFile: Marvel Empire New Form B Extended Date_compressed.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Marvel Empire_30032023_final.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Marvel Empire_30062023_final.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Marvel Empire_30032023_final.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Marvel Empire_30062023_final.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5_marvel empire_FY 22_23_compressed.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Marvel Empire_30092022 FINAL.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Marvel Empire_31032023 FINAL.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Marvel Empire_30062023 FINAL.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Marvel Empire 30092022 FINAL.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 marvel empire 31032023 FINAL.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Marvel Empire 30062023 FINAL.pdf22 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_marvel empire_FY 22_23_compressed.pdf22 Aug 2023
Details of encumbrancesFile: ENCUMBRANCE MERGED.pdf4 May 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LEGAL.pdf4 May 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LEGAL.pdf4 May 2023
CERSAI detailsFile: cersai dco1_merged.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER ESTATE ORGANIZATIONS.pdf4 May 2023
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER.pdf4 May 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE-MARATHI MARVEL EMPIRE.pdf4 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf4 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf4 May 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf4 May 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf4 May 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION REPORT-MODEL FORM OF AGREEMENT.pdf4 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032022 FORM 1.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122022 FORM 1.pdf18 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31032022 FORM 2.pdf18 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122022 FORM 2.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31032022 FORM 2 A.pdf18 Mar 2023
PAN CardFile: 1 SUCCESS LAND DEVELOPERS PAN.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed marvel empire 31032022 compressed.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Marvel Empire 31122022 both sign_compressed.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Marvel Empire 2021-22 both sign_compressed.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - SUCCESS LAND DEVELOPERS FY 2020-21.pdf17 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 05-01-2021_compressed.pdf16 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 06-04-2021_compressed.pdf16 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 03-07-2021_compressed.pdf16 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 07-04-2021_compressed.pdf16 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 04-01-2021_compressed.pdf16 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 05-07-2021_compressed.pdf16 Nov 2021
Declaration about Commencement CertificateFile: DECLARATION COMMENCEMNT CIRTIFICATE.pdf16 Oct 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD.pdf16 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 331-12-2020.pdf16 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 31-03-2021.pdf16 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 30-06-2021.pdf16 Oct 2021
Details of encumbrancesFile: NO ENCUMBRANCE CERTIFICATE.pdf10 Nov 2020
Building plan approval or NA orderFile: NA ORDER MERGED_compressed.pdf9 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER MERGED_compressed.pdf9 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER MERGED_compressed.pdf9 Nov 2020
Declaration in FORM BFile: FORM B-STAMP.pdf9 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE-SUCCESS.pdf4 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEERS CERTIFICATE-SUCCESS.pdf4 Nov 2020

How this compares with Pune

84%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARVEL EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIRUR TARDOBACHI WADI13,700+ in Pune

2 kmMARVEL EMPIRECompleted 11Lapsed / revoked 16Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: SUCCESS LAND DEVELOPERS

SUCCESS LAND DEVELOPERS has 2 registrations on MahaRERA, including MARVEL EMPIRE and Marvel Hills. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that MARVEL EMPIRE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MARVEL EMPIRE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARVEL EMPIRE?

The registered promoter entity is SUCCESS LAND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADWFS7935H1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARVEL EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARVEL EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARVEL EMPIRE?

The professionals named in the filing: Architect: Nisar Tamboli; Engineer: Nisar Tamboli; Chartered Accountant: SNR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARVEL EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARVEL EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARVEL EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.